Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-AOC | 1 | Accepted-AOC LOWEST | |
| 2 | 2₹3.5 L+₹11,415 (3.37%)Rejected-AOC | 2 | Rejected-AOC L2 |
Tender Value
₹3.4 L
EMD Value
₹8,461
Closing Date
17 Mar 2025, 1:00 pmClosed
Assistant engineer LID EW tanur municipality
Office of the ,Assistant engineer LID EW tanur municipality
Project No.658/25. Division 22 Anganwadi No. 59 Maintanance.-2024 25 of Tanur Municipality under Annual plan 2024-25
2025_LSGD_748233_10
07/AE/ET/LID EW/2024-25
Open Tender
Civil Works - Buildings
Item Rate
300 days
Tanu municipality
Please refer Tender documents.
8 documents required · 8 mandatory
₹750
Yes
₹8,461
Yes
17 May 2025
10 Mar 2025
18 Mar 2025
10 Mar 2025
17 Mar 2025
10 Mar 2025
Amount
Maintenance work
15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet
15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
OD319645/2024-2025:Demolishing Laterate work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge. In cement mortar
OD319646/2024-2025:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 using departmental laterate stone for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
14.64.2:Finishing walls with water proofing cement paint of required shade:Old work ( one or more coats @ 2.20 kg/ 10 sqm ) complete
V P SASIKUMAR (BID ID -2159241)
Bidder Name
V P SASIKUMAR
DILEEP V
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1209781.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .