Loading…
Loading…
Tender Value
₹6.9 Cr
EMD Value
₹5.0 L
Closing Date
24 Feb 2026, 11:00 amClosed
No
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
REVNUE
13 conditions · 2 needing a document upload
As per tender document attached.
As per tender document attached.
5 conditions · 1 needing a document upload
As per tender document attached.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per tender document attached.
Outsourcing of various activities at WCC/DDU during wagon maintenance at sick line and ROH shed for a period of 02 years.
RS-WCC-Tender-DDU-25~ECR
RS-WCC-Tender-DDU-25
Open
Works - General
24 Months
Chandauli, Uttar Pradesh
₹0
₹5.0 L
24 Feb 2026
2 Feb 2026
10 Feb 2026
35 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 6,92,97,658.6 | ||
| — | 10240.66 | — | — | ||
| Cleaning activities of CTRB. | — | — | — | 9,32,821.72 | |
| — | 6240.66 | — | — | ||
| Top Casting mounting | — | — | — | 26,66,946.05 | |
| — | 1392.12 | — | — | ||
| Bottom Casting mounting | — | — | — | 7,23,373.39 | |
| — | 120022.82 | — | — | ||
| Huck bolting | — | — | — | 60,93,558.57 | |
| — | 8509.13 | — | — | ||
| Collection of material from capital store and distribution to various working point of WCC. This include loading, unloading and stacking of Railway materials inside each and every section of wcc. | — | — | — | 58,90,615.43 | |
| — | 14551.87 | — | — | ||
| Riveting | — | — | — | 16,06,089.89 | |
| — | 26439.83 | — | — | ||
| Repair/replacement of gravity cottor riveting | — | — | — | 8,44,223.77 | |
| — | 75412.86 | — | — | ||
| Repair/replacement of door locking bolt | — | — | — | 20,06,736.2 | |
| — | 142769.71 | — | — | ||
| Replacement of bracket for door locking | — | — | — | 37,99,101.98 | |
| — | 7410.79 | — | — | ||
| Replacement of door | — | — | — | 15,77,534.87 | |
| — | 1414.94 | — | — | ||
| Replacement of door mediator | — | — | — | 2,52,609.24 | |
| — | 15935759. 34 | — | — | ||
| Various welding | — | — | — | 2,64,53,360.5 | |
| — | 17282.16 | — | — | ||
| Replacement of door check spring | — | — | — | 5,45,943.43 | |
| — | 1751.04 | — | — | ||
| Replacement of draft gear | — | — | — | 17,25,982.62 | |
| — | 114.11 | — | — | ||
| Replacement of stricker casting | — | — | — | 2,03,265.28 | |
| — | 19917.01 Per | Wagon | — | ||
| Hooking activity, dismantaling & assembly of trolley, cleaning of trolley, manual wheel pushing, lowering of wagon body on the trolley. | — | — | — | 1,09,63,915.66 | |
| — | 18000.00 Per | Wagon | — | ||
| Cleaning of must change items (ABS) during ROH of wagons by new one including cleaning of dirt collector, changing of dirt collector filter kit as per daily ROH done. | — | — | — | 30,11,580 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .