Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | ₹9.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.8 LRejected-AOC | ₹9.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SHAJAHAN.S L2 | PRASANTH.S L1 |
|---|---|---|---|---|---|
| 1.00VANITHA CANTEEN RENOVATION | |||||
| 1.00 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 6 | each | 369.24 ₹2,215.44 | 349.98 ₹2,099.88 |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 116.12 | sqm | 73.8 ₹8,569.66 | 69.95 ₹8,122.59 |
| 1.00 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 64.8 | sqm | 163.97 ₹10,625.26 | 155.41 ₹10,070.57 |
| 1.00 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 120.96 | sqm | 201.76 ₹24,404.89 | 191.23 ₹23,131.18 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1.55 | cum | 1,977.4 ₹3,070.90 | 1,874.23 ₹2,910.68 |
| 1.01 | 15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,boltd, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 250 | kg | 5.59 ₹1,397.50 | 5.3 ₹1,325 |
| 1.01 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 5.25 | cum | 339.41 ₹1,781.90 | 321.7 ₹1,688.93 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 1.54 | cum | 7,788.56 ₹12,025.54 | 7,382.2 ₹11,398.12 |
| 1.01 | OD417115/2024-2025:DRY RUBBLE MASONRY - Dry rubble with out concrete levelling course masonry with good quality blasted rubble including packing to compactness to line and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site.
Details of cost for 1 cum. | 3.6 | cum | 3,990.32 ₹14,365.15 | 3,782.13 ₹13,615.67 |
Tender Value
Refer Docs
EMD Value
₹21,371
Closing Date
22 Mar 2025, 6:00 pmClosed
Assistant Executive Engineer
Office of Assistant Executive Engineer Kollengode
Annual Plan Kollengode 2024 25 Renovation of Vanitha canteen at kollengode block panchayth-Pro 155 General Civil Work
2025_LSGD_750023_3
05/AEE/E-TENDER/2024-25
Open Tender
Civil Works - Buildings
240 days
Kollengode
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,890
Yes
₹21,371
Yes
17 Mar 2026
14 Mar 2025
24 Mar 2025
14 Mar 2025
22 Mar 2025
14 Mar 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid