Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹55.4 Cr+₹1.0 Cr (1.92%)Accepted-AOC KANNUR | KERALA | 670001 | L3 | Accepted-AOC Third Lowest | |
| 2 | L1₹54.4 CrRejected-AOC | L1 | Rejected-AOC First Lowest | |
| 3 | L2₹55.3 Cr+₹94.3 L (1.73%)Rejected-Finance | L2 | Rejected-Finance Second Lowest | |
| 4 | L4₹58.2 Cr+₹3.9 Cr (7.08%)Rejected-Finance | L4 | Rejected-Finance Forth Lowest | |
| 5 | L5₹60.2 Cr+₹5.8 Cr (10.7%)Rejected-Finance | L5 | Rejected-Finance Fifth Lowest |
Tender Value
₹50.4 Cr
EMD Value
₹5 L
Closing Date
23 Apr 2025, 3:00 pmClosed
Project Director, PMU-KRFB, TVM
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum-695033
Construction
2025_KRFB_759503_1
PWD/KR/TR/2252/2024_5_1_1/2
Open Tender
Civil Works - Bridges
Item Rate
730 days
Ernakulam
Please refer Tender documents.
8 documents required · 8 mandatory
₹19,518
Yes
₹5 L
Yes
Office of the Project Director, PMU-KRFB, TVM
13 Nov 2025
10 Apr 2025
25 Apr 2025
10 Apr 2025
23 Apr 2025
10 Apr 2025
19 Apr 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Site Clearance and dismantling (MORTH) | |||||
| 1.001 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 1 | Hectare | - | - |
| 1.002 | 2.4.4.D:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry | - | cum | - | - |
| 1.003 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 0.8 | cum | - | - |
| 1.004 | 2.4.1.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres - Lime Concrete, cement concrete grade M-10 and below - By Manual Means | - | cum | - | - |
| 1.005 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 0.4 | cum | - | - |
| 1.006 | 2.4.6.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Steel Work in all types of sections upto a height of 5 m above plinth level excluding cutting of rivet - Excluding dismembering. | 1 | tonne | - | - |
| 1.007 | 2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means | 0.4 | cum | - | - |
| 2Earth work Excavation for road (MORTH) | |||||
| 2.001 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 0.8 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 0.10 MB
Tenderdocument_2.pdf
Tender Documents • 1.92 MB
Tenderdocument_3.pdf
Tender Documents • 11.45 MB
BOQ.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .