Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73,594.84Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹75,566.66+₹1,971.82 (2.68%)Admitted-Fee/PreQual/Technical/Finance KERALA | PATHANAMTHITTA | KERALA | 685533 | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | VAEGHESE P M L2 | SUNNY L1 |
|---|---|---|---|---|---|
| 1.00Construction of Handrail in Manpilavu LPS | |||||
| 1.00 | 10.28:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) | 103.36 | kg | 685.62 ₹70,867.05 | 674.25 ₹69,691.83 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.25 | cum | 8,243.1 ₹2,052.53 | 8,021.4 ₹1,997.33 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1.2 | sqm | 681 ₹817.2 | 417.6 ₹501.12 Lowest |
| 1.00 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 4.25 | kg | 206 ₹874.68 | 121.8 ₹517.16 Lowest |
| 1.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 6 | kg | 159.2 ₹955.2 | 147.9 ₹887.4 Lowest |
Tender Value
₹84,626
EMD Value
₹2,116
Closing Date
9 Oct 2026, 5:00 pmClosed
SUNIL G.
ASSISTANT SECETARY, CHITTAR GP
330/ 25-26- CONSTRUTION OF HAND RAILS IN MANPILAVU LPS
2026_DP_873290_3
01/AE/LSGD/CTR/TNDR/26-27
Open Tender
Civil Works - Roads
Item Rate
180 days
CHITTARGP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹2,116
Yes
15 Oct 2026
1 Oct 2026
13 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Handrail in Manpilavu LPS | |||||
| 1.001 | 10.28:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) | 103.36 | kg | - | - |
| 1.002 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.25 | cum | - | - |
| 1.003 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1.2 | sqm | - | - |
| 1.004 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 4.25 | kg | - | - |
| 1.005 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 6 | kg | - | - |
stage.html
html • 0.02 MB
finance_1484351.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.24 MB
Tendernotice_3.pdf
PDF • 0.24 MB
SBD.pdf
Tender Documents • 0.97 MB
PAG.pdf
Tender Documents • 0.25 MB
FOT.pdf
Tender Documents • 0.24 MB
AFFIDAVIT.pdf
Tender Documents • 0.23 MB
BOQ_1484351.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .