| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹93.2 LAdmitted-Finance | -27.86% | ₹93.2 L | L1 | Admitted-Finance |
| 2 | L2₹96.4 LAdmitted-Finance | -25.38% | ₹96.4 L | L2 | Admitted-Finance |
| 3 | L3₹1.1 CrAdmitted-Finance | -16.99% | ₹1.1 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.1 CrAdmitted-Finance | -12.01% | ₹1.1 Cr | L4 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2.6 L
Closing Date
27 Jan 2026, 6:00 pmClosed
Senior Regional Manager, RIICO, Bhiwadi Unit
RIICO, Bhiwadi Unit-II, Rest House Road, RIICO Chowk, Bhiwadi, Distt. Alwar (Rajasthan)
Construction of RCC Drain near Ghadpur mod to Y.K. Hospital at Industrial area Chopanki
2026_RIICO_529458_3
2025-2026/30
Open Tender
Civil Works
180 days
Industrial area Chopanki
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
SSO Id of Contractor
₹2.6 L
28 Jan 2026
20 Jan 2026
28 Jan 2026
20 Jan 2026
27 Jan 2026
20 Jan 2026
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40mm nominal size).
Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc.
Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code)
Providing and laying in position Ready mix concrete manufactured in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design of specified grade of RCC work including pumping of R.M.C. from transit mixer to site of laying , exculding the cost of centering, shuttering and reinforcement with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge. All works upto floor V floor M20 grade Design Mix by using cement as per codal provision.
Add extra for providing richer mixes respectively at all floor levels, Providing M-30 grade concrete by using cement as per codal provision instead of M-20 grade design mix.
Carriage of Building Rubbish Stone Metal, Grit and Ballast etc. including loading and unloading complete with a lead of For 5 Km.
Providing and laying Precast reinforced cement concrete Box culvert section of M-40 grade designed for 'AA' class loading as per IRC specifications including to effect of impact, EQ etc. complete on firm base of 200mm thick lean concrete of M-10 grade with aggregate of size 40mm nominal of following internal size the work includes required safety measures cost of design of RCC Precast Box and its proof checking from IIT / NIT / Government Engineer College complete in all respect as per specifications, Size 1.50 M x 1.50 M
Dismantling of Structures, Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202., By Mechanical Means, Cement Concrete
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the em
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
td.pdf
Tender Documents • 0.18 MB
BOQ_944335.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid