Tender Value
₹14.7 L
EMD Value
₹14,800
Closing Date
18 Jun 2026, 6:45 pmClosed
Executive Engineer (R & B) Division, Rajpipla (State)
SR to Officers Quarters at Rajpipla (Repairing of Internal Road & Paver Block and Shed)
313673
04 (sudharo) 2026-27
Open
Civil Works
Works
Vadodara
6 documents required · 5 mandatory · 1 optional
₹900
Executive Engieer R and B Division Rajpipla
₹14,800
11 Jun 2026
11 Jun 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
BILL OF QUANTITY
Memorandum showing item of works to be carried out.
It. Item of Work
Qty. Unit Estimated Rates
In Figure InWords Amount
1 Providing and laying 50 mm thick Bituminous 89.00 MT 2675.49 Rupees Two Thousand
Macadam with B.T. aggregate as per MORTH Six Hundred Seventy 238118.61|
specification and using bitumen emulsion RS-1 as per Five And Paise Forty
is 8887: for tack coat a 2.50 KG. /10 Sq.m. on BT Nine Only
Surface with mechanical sprayer and Bulk asphalt VG
30 for mixing @ 34.00 KG. / M.T. i.e. 3.40 % of total
weight of mix including heating and mixing the
Jaggregate and asphalt in continuous of drum mix plant
Jand hot laid process spreading the same by paver
finisher and consolidation with roller as per MORTH
specification to achieve desire density, including
providing all materials equipments, tools and plants,
fire wood, oil, kerosene, labour charges etc. complete
using contractor's own machinery drum mix plant and
paver finisher etc. complete.
2 Providing and laying 25 mm thick Semi Dense 127.00 MT 3300.68 Rupees Three 419186.36|
Bituminous Concrete with B.T. aggregate as per Thousand Three
MORTH gradation VG-30 for mixing @ 50.00 KG. Hundred And Paise
M.T. including heating and mixing the aggregate and Sixty Eight Only
asphalt by continuous of batch mix plant and hot laid
process laying with paver finisher and consolidation
with roller as per MORTH specification to achieve
|desire density, including cost all materials equipments,
tools and plants, oil, kerosene, firewood, labour
|charges etc. complete using contractor's own
machineries batch mix plant and paver finisher etc.
Providing and laying 100 mm thick specified quarry 143.00 Cum 583.78 Rupees Five Hundred
spall in side shoulders including carriage of materials Eighty Three And Paise
spreading in live and level and consolidation. Seventy Eight Only
Place ideatification sign -Providing and fixing sing 2.00 No 9390.66 Rupees Nine Thousand
boards made out of 2mm aluminium sheet; size 150 x Three Hundred Ninety
|90cms. rectangle as as per the design of lRC-67-1977 |And Paise Sixty Six Only
lpre treated with phospheting process & acid etching:
coated with one coat of epoxy primer and two coats of
best quality epOxy paint; reflectorised with retro
refiective sheeting as per latest M.O.S.T.
Specifications; Letters and numerals should be as per
IRC-30-1968, 3.1m long (2 nos) stand post and frame
fabricated from suitable size iron angle of 50x50x5inm
75x75x6mm as required; painted with best quality
epoxy coatings in black and white bends. the details of
symbol or inscription / numerals for each board shall
be as per the instruction of engineer in charge. The
|fixing at site shall be in 1:2:4 CC block of size 45 x
x 60cms. for each leg. includingexcavation curing etc.
|complete under the supervision of engineer in
|charge.(A)Engineer Grade(VR)...
Oty. Unit Estimated Rates
Item of Work Total
No. In Fiqure In Words
1 Rupees Three Hundred
5 Road marking with hot applied thermoplastic paints
with reflectorising glass beads on bitumin surface
Sixty Seven And Paise
Seventy Two Only
providing and laying a hot applied thermoplastic
compound 2.5 mm thick including reflectorising glass
beads @ 250gmns per sgm area, thickness of 2.5mm is
excluding of surface applied glass beds as per IRC:35
|2015. The finished surface to be level, uniform and
free from streaks and holes. zebra patta bump patta
lanelcenter line/ edge linelcut patta. The white color
marking should provide liminance coefficinet on
cemend road shal be min 130 mcd/m2/lux and
|Asphalt road shall be min 100 mcd/m2/ lux during the
|service ife during the day time. The marking should
meet the performance criteria for night time reflectivity.
wet reflectivity and skid resistance as mentioned in the
section-15 of IRC 35-2015. Warranty for the Retro
reflectivity should be two years.
6 Dismentaling tiled of stone floors laid in mortar 363.00 Sqm 50.28 Rupees Fifty And Paise
including stacking of serviceable materilas and Twenty Eight Only
disposal of unserviceable materials with all lead and
Demolition of Brick work and stone masonry including
stacking of serviceable materilas and disposal of
Cum 576.30 Rupees Five Hundred
Seventy Six And Paise
unserviceable materials with all lead and lift.(iüi) In Thirty Only
8Providing and laying cement concrete 1:4:8 (1- 38.10 Cum
Cement : 4- coarse sand : 8- hand broken stone
Rupees Two Thousand
Seven Hundred Thirty
aggregates 40 mm nominal size) and curing complete Eight And Paise Eleven
excluding cost of formwork in (A) Foundation and Only
9 Providing and fixing pre-cast Rubber Dye / steel Dye 363.00 Sqm 705.95 Rupees Seven Hundred
inter locking concrete block 60mm thick with grade of Five And Paise Ninety
|concrete M300 pnumatic compressed I vibrated Five Only
mechanically and as per approved design
Confirming to IS 15658: 2006 including 35 mm Sand
|layer for levelling and filling the joint with sand in
proper line and level as per guidlines of lRC : SP
2018 etc. Complete.
10 Providing and fixing pre-cast concrete kerb stone
gray cement based concrete block 30cm length,30cm 356.00 Rmt 374.93 Rupees Three Hundred
height and 15cm thick of M250 grade concret as per Seventy Four And Paise
approved design and including excavation for fixing in Ninety Three Only
proper line and level,flling the joint with C:M
(1cement:3fine sand) etc complete.
11 Steel work, welded in built up
sections framed work
including cutting, hoisting, fixing in position Quint. 9108.48Rupees
lapplying a priming coat of red lead paint. (A)ln and One Hundred Thousand
and ioists, channels angles beams Paise
Tees, Forty Eight Only
lconnecting plates or angle cleats as in mainflats.
beams.Hip and jack rafters, purlins cross
common rafters and the like. conneted tol
No. Item of Work
Estimated Rates Total
In Figure In Words
corrugated G.1. sheet of class-3
with glavanished 2 6 4 5
8mm diameter with iron J or L roofing fixed 55.00 734.19 Rupees Seven Hundred 40380.45j
Hooks, Bolts Smt
G.I. limpet washer.bitumen and G.. limpet and nuts
Thirty Four And Paise
excluding the cost of filled with white lead washer or|
0.80 mm thick sheet. purlins, Rafters and Trusses.(1)
Rupees Fourteen Lakh(s) TOTAL Rs.
Seventy Three Thousand One
Hundred Seven And Paise Forty Six Only
IWe am/are wiling to
cary out the work @
in figures and words) of the % above/below percent (Should be written
estimated rate mentioned above Amount of
my lour tender works out as
'Estimated amount under.
put to tender Rs. *Estimated amount
|Deduct put to tender Rs.
|In words Rupees Total Rs.
|In words Rupees
(*Please strike out whichever is not applicable)
Above all items of "Bill of Quantity" with Item Description, Unit, Rate & Amount
have verified by me and found
Deputy Eyective Engineer Sr. Divisıcnal AccoUnt Off.car Executne Engineer
Rajpipla (Ř & B) Sub Division, Fajpipla (R&8) Division, Rajpipla (R& B) Division,
Rajppla Rajpipla Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E Tender Notice Officer Qtrs Internal Road.pdf
SBD Book Officer Qtrs Internal Road.pdf
4.1. BOQ-NOTES Officer Qtrs Internal Road.pdf
6.1 Specification Index.pdf
7.1 All Specification Officer Qtrs Internal Road.pdf
8.1 All GRs Circulars.pdf
sch b officers quarters internal road.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .