Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹18.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | jacob punnoose L1 |
|---|---|---|---|---|
| 1.00Rectification of damaged hand rails,pile protection and apron protection work of various bridges | ||||
| 1.00 | OD207103/2025-2026:Engaging coolies for clearing and grubbing road land including grass, bushes, shrubs and removal of rubbish. | 15 | no | 1,239 ₹18,585 Lowest |
| 1.00 | 2.4.1.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres - Cement Concrete Grade M-15 & M-20. - By Manual Means | 109.74 | cum | 1,399 ₹1,53,527.66 Lowest |
| 1.00 | OD108005/2025-2026:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 42 | metre | 1,758 ₹73,836 Lowest |
| 1.00 | OD108276/2025-2026:Bailing out water with 5 HP engine and pump set including conveyance to site and erection, cost of fuel, etc.. as per the instruction of the departmental officer at site | 230 | hour | 415 ₹95,450 Lowest |
| 1.00 | OD108325/2025-2026:Dry Rubble Masonry:Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels,cost and conveyance of all materials,labour charges etc. complete as per direction of departmental officers at site(Irrigation OD 60.7.1) | 182.08 | cum | 4,575 ₹8,33,011.43 Lowest |
| 1.01 | OD88691/2025-2026:Drilling 10 cm deep holes, providing and fixing 1m long dowel bars (10 mm dia.) in existing deck slab for hand rails with cement grout | 301 | each | 208 ₹62,608 Lowest |
| 1.01 | 14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications | 0.36 | MT | 1,14,969 ₹41,273.87 Lowest |
| 1.01 | 14.1.A.1:Furnishing and Placing Reinforced Cement Concrete Grade M20 Using Concrete Mixer in super-structure as per drawing and Technical Specification | 47.62 | cum | 9,694 ₹4,61,589.5 Lowest |
| 1.01 | 55.26a:Providing and applying elastic, elastomeric membrane forming system with anticarbonation and breathing properties. The system should be based on solvent free acrylic polymers with selected mineral fillers and should be ultra-violet resistant, crack bridging type, carbonation resistant, breathable, enviornment friendly, water proofing coating. For anticarbonation, equivalent air layer thickness denoted as R or SD CO2 grater than 50 m and for breathability equivalent air layer thickness denoted as SD H2O shall be less than 4 m for vapour transmitting barrier. The system consists of one coat primer @ 75- 100 g/m2. The consumption of main polymer coating to give film thickness of 200-225 microns (Solid contents- 70%+ -3%) should be approximately. 400-450 g/m2 per two coats depending upon the method of application (either by roller or brush) and surface smoothness of the concrete. The total dry film thickness of the coating system should be minimum 200 microns for the above system. Polymer coating should be in suitable approved shades, including cost of materials, cleaning, chipping and removing the dirt particles of the concrete slab with wire brush and water,labour charges for filling the bug holes, cracks, joints etc with one component polymer modified fine repair and cosmetic mortar, labour for applying the above coating, scaffolding charges,etc. complete as per IRC SP:80 Clause 6.5.1 and Clause 2808 in the Specifications Book for Roads & Bridges published by the Ministry during April 2013. | 73.92 | sqm | 459 ₹33,929.28 Lowest |
Tender Value
₹16.7 L
EMD Value
₹41,843
Closing Date
15 Jul 2026, 3:00 pmClosed
Executive Engineer PWD bridges Alappuzha
Executive Engineer PWD bridges Alappuzha
GENERAL Damaged handrails Pile protection work and apron work of Angelvally small Bridge Plachery Bridge,Pengattukadvu Bridge,Mamukku Bridge Bridge under Bridges section Pathanamthitta GENERALBridge Safety Repair of damaged handrails pile protection
2026_PWD_859487_1
PWD/BR/TR/13065/2025_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
180 days
pathanamthitta
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
₹41,843
17 Jul 2026
7 Jul 2026
17 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rectification of damaged hand rails,pile protection and apron protection work of various bridges | |||||
| 1.001 | OD207103/2025-2026:Engaging coolies for clearing and grubbing road land including grass, bushes, shrubs and removal of rubbish. | - | no | - | - |
| 1.002 | 2.4.1.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres - Cement Concrete Grade M-15 & M-20. - By Manual Means | 0.4 | cum | - | - |
| 1.003 | OD108005/2025-2026:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | - | metre | - | - |
| 1.004 | OD108276/2025-2026:Bailing out water with 5 HP engine and pump set including conveyance to site and erection, cost of fuel, etc.. as per the instruction of the departmental officer at site | - | hour | - | - |
| 1.005 | OD108325/2025-2026:Dry Rubble Masonry:Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels,cost and conveyance of all materials,labour charges etc. complete as per direction of departmental officers at site(Irrigation OD 60.7.1) | 0.6 | cum | - | - |
| 1.006 | OD88691/2025-2026:Drilling 10 cm deep holes, providing and fixing 1m long dowel bars (10 mm dia.) in existing deck slab for hand rails with cement grout | - | each | - | - |
| 1.007 | 14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications | - | MT | - | - |
| 1.008 | 14.1.A.1:Furnishing and Placing Reinforced Cement Concrete Grade M20 Using Concrete Mixer in super-structure as per drawing and Technical Specification | 1 | cum | - | - |
| 1.009 | 55.26a:Providing and applying elastic, elastomeric membrane forming system with anticarbonation and breathing properties. The system should be based on solvent free acrylic polymers with selected mineral fillers and should be ultra-violet resistant, crack bridging type, carbonation resistant, breathable, enviornment friendly, water proofing coating. For anticarbonation, equivalent air layer thickness denoted as R or SD CO2 grater than 50 m and for breathability equivalent air layer thickness denoted as SD H2O shall be less than 4 m for vapour transmitting barrier. The system consists of one coat primer @ 75- 100 g/m2. The consumption of main polymer coating to give film thickness of 200-225 microns (Solid contents- 70%+ -3%) should be approximately. 400-450 g/m2 per two coats depending upon the method of application (either by roller or brush) and surface smoothness of the concrete. The total dry film thickness of the coating system should be minimum 200 microns for the above system. Polymer coating should be in suitable approved shades, including cost of materials, cleaning, chipping and removing the dirt particles of the concrete slab with wire brush and water,labour charges for filling the bug holes, cracks, joints etc with one component polymer modified fine repair and cosmetic mortar, labour for applying the above coating, scaffolding charges,etc. complete as per IRC SP:80 Clause 6.5.1 and Clause 2808 in the Specifications Book for Roads & Bridges published by the Ministry during April 2013. | - | sqm | - | - |
stage.html
html • 0.02 MB
finance_1453266.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
PreliminaryAgreement.pdf
Tender Documents • 0.08 MB
Affidavit.pdf
Tender Documents • 0.01 MB
epayment.pdf
Tender Documents • 0.07 MB
sbd.pdf
Tender Documents • 1.63 MB
BOQ_1453266.xls
BOQ • 0.31 MB
integrity.pdf
Additional Documents • 0.01 MB
form.pdf
Other Document • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].