| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC 54 PON NAGAR ARAVAKURICHI KARUR | ARAVAKURICHI | KARUR | TAMIL NADU | ₹8.8 L | L1 | Accepted-AOC Below Rate |
| 2 | L2₹8.9 LRejected-AOC | ₹8.9 L | L2 | Rejected-AOC Above Rate |
| Sl No | Description | Qty | Unit | SELVAKUMAR CONSTRUCTIONS L1 | Bharathi Construction L2 |
|---|---|---|---|---|---|
| 1.00Name of Work : Providing Poth hole Road from NH-7 (@Five road ) to Aaru road Athumaedu Road (MDR) Via Moringa Factory Km 0/0-0/6 (R 232 | |||||
| 2.00 | Clearing the scrub jungle including all labour charges for burying and burning etc., | 1,593 | Cum | 6 ₹9,558 | 7 ₹11,151 |
| 3.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting side drain etc., | 132.75 | Cum | 141 ₹18,717.75 | 142 ₹18,850.50 |
| 4.00 | Picking 5cm to 10cm old BT Surface and sectioning -1 sqm | 220.35 | Cum | 24 ₹5,288.40 | 25 ₹5,508.75 |
| 5.00 | Collection and supply of gritty gravel friom Appoved quarry inculding all Labour For Spreading and compaction with power roller etc.,completed for Sholders | 118 | Cum | 341 ₹40,238 | 342 ₹40,356 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 33.08 | Cum | 2,931 ₹96,957.48 | 2,931 ₹96,957.48 |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 661.05 | Cum | 86 ₹56,850.30 | 87 ₹57,511.35 |
| 8.00 | Providing and laying Tack coat using 2.5Kg of bitumen emulsion RS-1 for 10sqm for 4 preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 661.05 | nos | 20 ₹13,221 | 20 ₹13,221 |
| 9.00 | Providing and laying Tack coat using 3Kg of bitumen emulsion RS-1 for 10sqm for 4 preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 466.2 | nos | 34 ₹15,850.80 | 35 ₹16,317 |
| 10.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc. including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 28.19 | cum | 12,297 ₹3.5 L | 12,300 ₹3.5 L |
Tender Value
₹9.2 L
EMD Value
₹9,223
Closing Date
30 Oct 2025, 3:00 pmClosed
Block Development Officer(B.P)
Block Development Office, Aravakurichi
Strengthening the road from Strenthening the road from NH-7 (Five Road) to Aaru road Athumedu road (MDR) Via Moringa Factory Km 0/0-0/6 (R-232)
2025_RDTN_615234_1
Aravakurichi Block - SFC -2025-26 - Road Works
Open Tender
Civil Works - Roads
90 days
Aravakurichi Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,223
Block Development Office, Aravakurichi
9 Feb 2026
17 Oct 2025
30 Oct 2025
17 Oct 2025
30 Oct 2025
17 Oct 2025
21 Oct 2025
Amount
Clearing the scrub jungle including all labour charges for burying and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting side drain etc.,
Picking 5cm to 10cm old BT Surface and sectioning -1 sqm
Collection and supply of gritty gravel friom Appoved quarry inculding all Labour For Spreading and compaction with power roller etc.,completed for Sholders
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat using 2.5Kg of bitumen emulsion RS-1 for 10sqm for 4 preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Tack coat using 3Kg of bitumen emulsion RS-1 for 10sqm for 4 preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc. including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Km stone And Hm Stone
Hm Stone
Towards Cautionary Sign Board
Replectorising Glasss Beads On Bitumnous surface
Provision For Road Studs
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Bharathi Construction (BID ID -1500080)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
1TechPriceBid.pdf
Tender Documents • 0.91 MB
BOQ_735059.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid