Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC SALIM MANZIL KARIMANCODE P O PALODE THIRUVANANTHAPURAM 695 562 | KOLLAM | KERALA | 695562 | L1 | Accepted-AOC L1 bid and hence accepted | |
| 2 | L2₹4.4 L+₹4,705.36 (1.08%)Rejected-AOC | L2 | Rejected-AOC L2 bid and hence rejected | |
| 3 | L3₹4.4 L+₹8,767.73 (2.02%)Rejected-AOC | L3 | Rejected-AOC L3 bid and hence rejected | |
| 4 | L4₹4.6 L+₹21,703.23 (5.00%)Rejected-AOC | L4 | Rejected-AOC L4 bid and hence rejected | |
| 5 | L5₹4.6 L+₹24,369.94 (5.61%)Rejected-AOC COIMBATORE ROAD KALMADAPOM PALAKKAD | PALAKKAD | L5 | Rejected-AOC L5 bid and hence rejected |
| Sl No | Description | Qty | Unit | National Biotech L6 | NAZEEM LAL A S L1 | THE KERALA AGRO INDUSTRIES CORPORATION LTD L5 | RAJAN B L8 | AJEESH KUMAR N L3 | RAJESH S R L7 | JASEELA NASEEM L4 | VIVEK N S L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Rain Shelter | |||||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 150 | sqm | 35 ₹5,250 | 17.89 ₹2,683.5 | 17.66 ₹2,649 | 18 ₹2,700 | 50 ₹7,500 | 9.5 ₹1,425 Lowest | 18.78 ₹2,817 | 17 ₹2,550 |
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 105 | sqm | 90 ₹9,450 | 98.41 ₹10,333.05 | 130.32 ₹13,683.6 | 115 ₹12,075 | 160 ₹16,800 | 70 ₹7,350 Lowest | 103.33 ₹10,849.65 | 125 ₹13,125 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 3.26 | cum | 2,000 ₹6,516 | 316.09 ₹1,029.82 | 350 ₹1,140.3 | 240 ₹781.92 | 270 ₹879.66 | 220 ₹716.76 Lowest | 331.89 ₹1,081.3 | 330 ₹1,075.14 |
| 1.00 | 50.6.1.7:Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15 cm in : CM 1:6 ( 1 cement : 6 coarse sand ) etc complete | 2.4 | cum | 9,700 ₹23,280 | 6,534.56 ₹15,682.94 | 6,800 ₹16,320 | 8,230 ₹19,752 | 6,000 ₹14,400 Lowest | 7,520 ₹18,048 | 6,861.29 ₹16,467.1 | 6,100 ₹14,640 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.37 | cum | 9,300 ₹31,303.8 | 7,178.67 ₹24,163.4 | 8,759.56 ₹29,484.68 | 8,700 ₹29,284.2 | 5,000 ₹16,830 Lowest | 7,840 ₹26,389.44 | 7,537.6 ₹25,371.56 | 7,700 ₹25,918.2 |
| 1.01 | 4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts | 7.92 | sqm | 477 ₹3,777.84 Lowest | 746.49 ₹5,912.2 | 979 ₹7,753.68 | 850 ₹6,732 | 825 ₹6,534 | 920 ₹7,286.4 | 783.81 ₹6,207.78 | 910 ₹7,207.2 |
| 1.01 | 13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand). | 40 | sqm | 447 ₹17,880 | 343.92 ₹13,756.8 | 361.47 ₹14,458.8 | 330 ₹13,200 | 690 ₹27,600 | 320 ₹12,800 Lowest | 361.12 ₹14,444.8 | 320 ₹12,800 Lowest |
| 1.01 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1,093.34 | kg | 209 ₹2,28,508.48 | 202.78 ₹2,21,707.89 | 225 ₹2,46,001.95 | 150 ₹1,64,001.3 Lowest | 154 ₹1,68,374.67 | 210 ₹2,29,601.82 | 212.92 ₹2,32,794.38 | 205 ₹2,24,135.11 |
| 1.01 | OD2626/2025-2026:Supplying and laying shade net 50 % green/black shade net including fixing in position tying using nylon wire etc complete | 187 | sqm | 97 ₹18,139 | 98.9 ₹18,494.3 | 64 ₹11,968 Lowest | 265 ₹49,555 | 131 ₹24,497 | 240 ₹44,880 | 103.85 ₹19,419.95 | 95 ₹17,765 |
Tender Value
₹5.1 L
EMD Value
₹12,669
Closing Date
2 Dec 2025, 6:00 pmClosed
ASST EXE ENGINEER AGRI TVPM
Office of Asst Exe Engineer(Agri) World Market Compound NH-66 Bypass Venpalavattom Anayara P O PIN 695029
GENERAL-BN-Peringamala-Nursery- Construction of new rainshelter-General Civil Work
2025_AGRI_820991_1
AGRI/DOA/TR/269/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,120
₹12,669
6 Feb 2026
20 Nov 2025
4 Dec 2025
20 Nov 2025
2 Dec 2025
20 Nov 2025
20 Nov 2025 - 2 Dec 2025
Work Name:GENERAL-BN-Peringamala-Nursery-Construction of new rainshelter-General Civil Work
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1376449.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 2.19 MB
formoftender.pdf
Tender Documents • 0.03 MB
preliminaryagreement.pdf
Tender Documents • 0.08 MB
affidavit.pdf
Tender Documents • 0.03 MB
integritypact.pdf
Tender Documents • 0.05 MB
epay.pdf
Tender Documents • 0.05 MB
BOQ_1376449.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .