Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-AOC | 1 | Accepted-AOC ACCEPTED BEING LOWEST | |
| 2 | 2₹4.5 L+₹11,620 (2.67%)Rejected-Finance ASHOKA PARK PALLAVA PARK BVT INS VISHWAKARMA INDIAN NAVY OF GE ND VISAKHAPATNAM | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | 2 | Rejected-Finance REJECTED NOT BEING THE LOWEST TENDERER |
Tender Value
₹5.3 L
EMD Value
₹10,540
Closing Date
28 Dec 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGE I CG VIZAG
AGE (I) (CG) Vizag Military Engineer Services CGWO Building Co Fleet Mail Office visakhapatnam 530 014
REPAIR MAINTENANCE OF COOLING APPLIANCES AT CG COMPLEX MALKAPURAM JETTY AND ICGS MALKAPURAM UNDER AGE I CG VIZAG
2020_MES_385780_2
AGE(I)CG/VIZ/TOKEN 23 OF 2020-21
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
VISAKHAPATNAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
AGE I CG VIZAG
₹10,540
Yes
4 Feb 2021
9 Dec 2020
30 Dec 2020
9 Dec 2020
28 Dec 2020
14 Dec 2020
60 days
Amount
M&L for periodical Servicing of Air conditioner Split type (High wall/ Tower AC) of capcities 1.5 to 2.0 TR complete on site or civil work shop with disconnecting electrically from Main supply , Applying high speed air blower on evaporating unit and condensing unit, fan motor, blower, housing, filters etc.Checking up all electrical parts like Blower Motor, condensor Motor, swing motor, capacitor, PCB,drain pipes and interconection between evaporative unit and condensing Unit and testing of wiring of connections,cleaning and identifification of defects and its rectification/replacement with same specification and same capacity, Checking of Insulation of copper tubing of refrigerant lines,connecting valve and gas pressure of unit,replacement of Insulation leakage detection if any and leakage rectification, cleaning entire units internally and externally and replacement of necessary parts,Oiling of Moving parts,Motors,Tighteing of Nut bolts,Screw,Thimles, reassembling, connecting with supply both unit and testing complete to make the unit in fully affactive cooling and airflow. Note : Spare parts, gas charging shall be measured and paid separatelty
All as per Item no.s 1 here in before but for Air conditioner window type of capacity 1.5 to 02 TR. Note : Spare parts, gas charging shall be measured and paid separatelty
Supply only the following items for incorporating for item No 1 & 2 above :-
S & F Running Capacitor 20-25 MFD
S & F Running Capacitor 30-45 MFD
S & F Starting Capacitor 60-80 MFD
S & F Starting Capacitor 90-120 MFD
Capacitor 2.5 Mfd for Evaporating Fan Motor
Capacitor 6 Mfd for Condensing Fan Motor
Evaporator blower as per sample
Condensor Fan blade as per sample
Printed Circuit board/Electrinic Control kit of split AC as per sample
Nylon Filter
Condenser Fan Motor for split AC 1.5 TR as per sample
Condenser Fan Motor for split AC 2 .0 TR as per sample
Evaporating Blower Motor of 1.5 ton AC as per sample
Evaporating Blower Motor of 2 ton AC as per sample
Compressor Sealed Unit for AC of capacity 2.0 TR
Compressor Sealed Unit for AC of capacity 1.5 TR
Outer grill of Condensor unit as per sample
Swing motor for Split AC as per sample
Thermostat Switch
Over Load Protection Coil
Wiring Kit of Split AC 1.5/2 Ton
Cooling Coil as per existing make and model /type
Condensing Coil as per existing make and model /type
Drain pipe of best quality as per existing dia and lenth
Connecting Cable of 40/.0076 three core copper PVC insulated round
Connecting block of Condensor Unit
Connecting block of Evaporating Unit
Material and labour for Copper tubing of appropriate size made of copper for suction line including jointing with existing system with help of flare tool etc. and connecting up with suction valve valve both side with entire satisfaction of Engr-in-Charge.
Material and labour for Copper tubing of appropriate size made of copper for suction line including jointing with existing system with help of flare tool etc and connecting up with suction valve valve both side with entire satisfaction of Engr-in-Charge
Material and labour for Recharging of refrigerant Gas in Split type Acs (1.5/2Ton) all as specified and as directed by Engr-in-Charge at site.
Material and labour for periodical repairs and maintenance of water cooler of cooling capacity upto 60 Ltrs / Hr and storage capacity upto 120 Ltrs complete with disconnecting the water connection, inserting dead plug, dismantling the fan motor, taps, fan blades, condenser etc.Checking up and rectification to wiring and connections, replacement of necessary parts and accessories, cleaning of the cold water tank, piping, refrigerant lines, re-allignment of the fan coil unit and replacement of drain pipe, connecting to water mains and testing to make the unit in fully functional condition. Note: 1. Equipment Shall be serviced once in quarterly and no repeat maintenance shall be measured. Labor Charge for On site repairs is deemed to be included in the quoted rate of the job. 2. Spare replaced during the process of repair shall be measured and paid separately as a S & F under relevant item herein after 3. Rates do not include the cost of dismantling and transporting the Water Cooler to workshop
S & F in repairs the spares incorporated during the repairs to Water Cooler vide Sl Item No. 7 herein before.-
Thermostatswitch with knob
Push tap inner / outer thread chromimum plated of size 1/2 ".
Rubber gasket with PVC sheet for Top Lid
Condenser fan motor for water cooler.
Capacitor for water cooler
Starting Relay as per Sample
PVC Hose Pipe size 3/4 " to 1 "
Waste water tray as per sample
Compressor Sealed unit for water cooler of capacity upto 120Ltrs
Condenser unit for water cooler
Overload protection for Water cooler
Capillary tube of water cooler
Supply & Fix in repairs ball brass valves, high pressure with Polyethylene float and flynut complete screwed for Iron pipe on or brass ferrule and fixed of size 15 mm dia complete all as specified and as directed.
Supply and fix in repairs Sheet Metal enclosure with 2 pin and earth plug and socket complete with one single pole MCB SP of Capacity upto 32 Amps 240 Volts
Material and Labour for Recharging of refrigerants Gas in water cooler any capcity and any type all as specified and as directed by Engr-in-Charge at site.
Taking down geyser of capacity 25 to 50 Ltrs from the location after disconnecting electric and water connection carefully and sealing cable ends and water pipe for repair or removing to store for safe custody & stripping down,cleaning of tank and aparture plate and heating element carefully including testing of heating element,connection , thermostate, indicating lamps,tank,and connecting up carrying out repairs complete all as directed by EIC at site. Note: 1. Equipment Shall be serviced once in a year and no repeat maintenance shall be measured. 2. Spare replaced during the process of repair shall be measured and paid separately as a S & F under relevant item herein after.
S & F in repairs the spares incorporated during the repair to geysers vide Sl Item No 11 herein before :-
Heating Coil 1.0 KW
Heating Coil 2- 2.5 KW as per sample
Thermostat
Non return valve Brass Chromium plated 15 mm / 20 mm
PVC Connection 600 mm in length for Hot water
PVC Connection 600 mm in length for Cold water
Indicating lamps
Apparture plate as per sample
Inner tank Steel tank made of steel as per sample
Note for the Item Nos.1 to 13.09 : Make of the Spare parts shall be as per the make existing at site or as recommended by Engineer-in-Charge and as approved by AGE(I).
GS ENGINEERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .