Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAdmitted-Finance | ₹4.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.1 Cr+₹1.2 L (0.29%)Admitted-Finance | ₹4.1 Cr+₹1.2 L (0.29%) | L2 | Admitted-Finance |
| 3 | L3₹4.1 Cr+₹2.6 L (0.63%)Admitted-Finance | ₹4.1 Cr+₹2.6 L (0.63%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MUNEER P P L1 | AKBAR MANCHERRY L2 | Saidalavi K L3 |
|---|---|---|---|---|---|---|
| 1.00Kalpalam Palakkund Puthukkudi - Anubhandha thodukal Punarudharana Pravarthi | ||||||
| 1.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 1,252.49 | cum | 215.37 ₹2,69,747.91 Lowest | 215.37 ₹2,69,747.91 Lowest | 215.38 ₹2,69,760.44 |
| 1.02 | 60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 288 | hour | 381.97 ₹1,10,007.36 Lowest | 381.97 ₹1,10,007.36 Lowest | 381.98 ₹1,10,010.24 |
| 1.03 | 60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | 18 | metre | 1,230.8 ₹22,154.4 Lowest | 1,230.8 ₹22,154.4 Lowest | 1,230.8 ₹22,154.4 Lowest |
| 1.04 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 310.04 | cum | 6,857.61 ₹21,26,153.98 Lowest | 6,857.61 ₹21,26,153.98 Lowest | 6,857.61 ₹21,26,153.98 Lowest |
| 1.05 | 4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 591.87 | cum | 7,413.74 ₹43,87,992.54 Lowest | 7,413.74 ₹43,87,992.54 Lowest | 7,413.74 ₹43,87,992.54 Lowest |
| 1.06 | 4.2.3 : Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2,262.16 | cum | 10,132.58 ₹2,29,21,507.04 Lowest | 10,132.58 ₹2,29,21,507.04 Lowest | 10,132.58 ₹2,29,21,507.04 Lowest |
| 1.07 | 4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 588.95 | sqm | 337.42 ₹1,98,723.51 Lowest | 337.42 ₹1,98,723.51 Lowest | 337.42 ₹1,98,723.51 Lowest |
| 1.08 | 4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 7,801.4 | sqm | 721.7 ₹56,30,270.38 Lowest | 721.7 ₹56,30,270.38 Lowest | 721.7 ₹56,30,270.38 Lowest |
| 1.09 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 39,738.01 | kilogram | 98.92 ₹39,30,883.85 Lowest | 101.92 ₹40,50,097.88 | 105.36 ₹41,86,796.63 |
Tender Value
₹5 Cr
Closing Date
11 Dec 2024, 5:00 pmClosed
BaijuT P
Forest Industries Travancore Limited Thaikkattukar
Construction of Thodu
2024_FITL_711371_1
FIT/CP-39/2024-25
Open Tender
Civil Works - Others
Item Rate
365 days
Manjeri municipality
Refer Tender Document
8 documents required · 8 mandatory
₹8,850
Exempted
Forest Industries Travancore Limited Thaikkattukar
1 Jan 2025
2 Dec 2024
12 Dec 2024
2 Dec 2024
11 Dec 2024
2 Dec 2024
2 Dec 2024 - 6 Dec 2024
6 Dec 2024
Amount
Kalpalam Palakkund Puthukkudi - Anubhandha thodukal Punarudharana Pravarthi
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
60.1.2 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.2.3 : Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
11.20.1 : Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Light shade pigment using white cement
50.10.1 : Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
AKBAR MANCHERRY (BID ID -2013235)
Saidalavi K (BID ID -2013240)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_1118382.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .