Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.0 LAccepted-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹3.0 L | L-1 | Accepted-AOC Accept |
| 2 | L-2₹3.1 LRejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹3.1 L | L-2 | Rejected-AOC Reject |
| 3 | L-3₹3.1 LRejected-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹3.1 L | L-3 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | TRIDEO CONSTRACTION L3 | TRIBHUWAN ENTERPRISES L2 | A.K. ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00 | I. Replacement of new conv. Belt 03 nos. bend pulley, drive pulley and take-up guide frame rectification strengthening, alignment of U. No. 303 B/Conv. (a) Shifting of new conv. belt bend & drive pulley and Iron & steel items at site (5.408+3.474+2.096+2.872MT)= 13.850MT | 13.85 | MT | 1,450 ₹20,082.50 | 1,400 ₹19,390 | 1,350 ₹18,697.50 |
| 2.00 | (b) Dismantling of old conv. belt + bend + drive pulley 60% of new (5.408+3.474+2.096MT=10.978MTX60% = 6.586MT+Total take-up arrengement (6.586+8.800MT) =15.386MT | 15.39 | MT | 2,250 ₹34,618.50 | 2,200 ₹33,849.20 | 2,150 ₹33,079.90 |
| 3.00 | (c ) Dismantling of damaged guide channel arrengement 40%of new (2.872MT)=1.148MT | 1.15 | MT | 5,650 ₹6,486.20 | 5,600 ₹6,428.80 | 5,560 ₹6,382.88 |
| 4.00 | (d) Fabrication & erection as above said items. | 2.87 | MT | 10,850 ₹31,161.20 | 10,800 ₹31,017.60 | 10,700 ₹30,730.40 |
| 5.00 | (e) Installation & alignement of conv. belt+pulley+ take-up arrangement(5.408+2.096+3.474+8.800MT) | 19.78 | MT | 4,450 ₹88,012.10 | 4,400 ₹87,023.20 | 4,250 ₹84,056.50 |
| 6.00 | (f) Shifting of old conv. belt+Iron & steel items+ pulley (6.586+1.148MT)=7.734MT | 7.73 | MT | 1,450 ₹11,214.30 | 1,400 ₹10,827.60 | 1,360 ₹10,518.24 |
| 7.00 | II. Work of dismantling of 04 nos. damaged joint making by cold vulcanisation, drive carriage assly. of U. No. 307 B/Conv. (a) Dismantling of old conv. Belt +pulley+take-up arrangement+carraige wheel assly. gear box=10.627MT | 10.63 | MT | 2,250 ₹23,910.75 | 2,200 ₹23,379.40 | 2,150 ₹22,848.05 |
| 8.00 | (b) Re-Installation & alignment of as above said work. | 10.63 | MT | 4,450 ₹47,290.15 | 4,400 ₹46,758.80 | 4,200 ₹44,633.40 |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹3.0 L
EMD Value
₹3,800
Closing Date
27 Feb 2026, 6:00 pmClosed
RAVI RANJAN
Kedla Washery
Replacement of new conv. Belt 03 nos. bend pulley, drive pulley and take-up guide frame rectification strengthening, alignment of U. No. 303 B/Conv. and work of dismantling of 04 nos. damaged joint making by cold vulcanisation, drive carriage assly
2026_CCL_353295_1
PO/KW/E-Tender/25-26/85, Date-16.02.2026
Open Tender
Electrical and Maintenance Works
7 days
KEDLA WASHERY
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,800
Yes
19 Mar 2026
16 Feb 2026
28 Feb 2026
17 Feb 2026
27 Feb 2026
17 Feb 2026
17 Feb 2026 - 23 Feb 2026
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid