Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.7 L
EMD Value
₹2,000
Closing Date
4 Aug 2021, 5:00 pmClosed
Superintending Engineer
33/11 KV S/S Hospital Chauraha, Bahraich
Shifting of 11 KV Line and Replacement of Metering Cubical and other work under EDD-I, Bahraich
2021_MVVNL_604973_1
32/EDC(B)/2021-22
Open Tender
Electrical Works
Item Rate
90 days
Bahraich
Please Refer Tender Form
3 documents required · 3 mandatory
₹1,180
Superintending Engineer, EDC
₹2,000
25 Aug 2021
29 Jul 2021
5 Aug 2021
29 Jul 2021
4 Aug 2021
29 Jul 2021
Amount
Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Bahraich to the work site/dump site. All the material at Sl No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor.
PCC Pole 8.5 Mtr. long
ST Pole 11 Mtr. long
AB Cable 3x50+1x35+1x25 mm2
ACSR weasel conductor
Safe Carriage of 25 KVA T/F
Other line material
11 KV Pilfer Proof Metering Cubical CTR 10/5, 20/5, 30/5, 5/5 Amp.
11 KV CT/PT Double Metering Combined Unit CTR 5/5 Amp.
Erection of Single PCC (8.5 Mtr Long) for 11 KV/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection of Single ST Pole (11 Mtr Long) for 11 KV/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection of Double PCC Pole (8.5 Mtr Long) for 11 KV/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost.
Earthing of Pole as per RESSPO Norms.
Grouting of PCC Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials shall be provided by the contractor at his own cost.
Grouting of ST Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials shall be provided by the contractor at his own cost.
Mounting of 25 KVA T/F with complete fitting.
Installation and commissioning of 11 KV Pilfer Proof Metering Cubical CTR 10/5, 20/5, 30/5, 5/5 Amp.
Installation and commissioning of 11 KV CT/PT Double Metering Combined Unit CTR 5/5 Amp.
Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required).
Errection & Commissioning of AB cable 3x50+1x35+1x16mm2 including fitting of Accessories (All Accessories shall be Provided by the Contractor)
Dismentalling of 11 KV Line with loading & unloading from site to store
Fitting of Three Phase Distribution Box
M/s S S Associates
Ms Agarwal Electric Traders
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .