Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC JHARKHAND | LOHARDAGA | JHARKHAND | 835302 | L1 | Accepted-AOC SINCE L1 | |
| 2 | L2₹6.5 L+₹11,137.02 (1.75%)Rejected-Finance AT PO LAIYO DIST RAMGARH JHARKHAND PIN 825325 | LAIYO | RAMGARH | JHARKHAND | 825325 | L2 | Rejected-Finance SINCE L2 | |
| 3 | Rejected-Technical ARGADA RAMGARH JHARKHAND 829101 | RAMGARH | JHARKHAND | 829101 | - | Rejected-Technical BIDDER REJECTED |
| Sl No | Description | Qty | Unit | M/s Achal Electricals L1 | M/S S. Z. Brothers & Company L2 |
|---|---|---|---|---|---|
| 2.00 | Supply & fixing of timer complete set 1 NO + 1 NC with ML4 Contactor complete set | 5 | nos | 39,500 ₹1,97,500 Lowest | 40,920.01 ₹2,04,600.03 |
| 3.00 | Supply & fixing of L&T 3 pole ML 4 power contactor SS90910 | 6 | nos | 16,500 ₹99,000 Lowest | 17,095.74 ₹1,02,574.46 |
| 4.00 | KRTPN10 Bch Pneumatic Timer | 6 | nos | 7,850 ₹47,100 | 7,712.24 ₹46,273.41 Lowest |
| 5.00 | Supply and fixing of 3 core 2.5 sq. Mm | 135 | mtrs | 650 ₹87,750 | 611.91 ₹82,607.81 Lowest |
| 6.00 | Cost of MS clamp with Nut & Bolts. | 8 | set | 270 ₹2,160 Lowest | 279.88 ₹2,239 |
| 7.00 | Push Button | 4 | nos | 1,010 ₹4,040 Lowest | 1,029.67 ₹4,118.68 |
| 8.00 | Indicating Lamp | 6 | nos | 1,120 ₹6,720 Lowest | 1,134.5 ₹6,806.99 |
| 9.00 | Providing of Limit switch | 6 | nos | 15,000 ₹90,000 Lowest | 15,624.65 ₹93,747.89 |
| 10.00 | Copper cable 2.5 sq.mm 2 core | 120 | mtrs | 232 ₹27,840 Lowest | 236.41 ₹28,368.94 |
| 11.00 | Auxilary contactor | 6 | nos | 12,100 ₹72,600 Lowest | 12,418.3 ₹74,509.82 |
Tender Value
Refer Docs
EMD Value
₹8,600
Closing Date
3 Jun 2025, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
Providing and Installation of 05 nos interlocking arrangement and Providing and Fixing of 5 nos Timer Set and repairing of 6 nos Timer Set at different location of Karma Project Under Kuju Area.
2025_CCL_336026_1
GM (K)/EnM/eTender/25-26/60
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹8,600
19 Aug 2025
23 May 2025
4 Jun 2025
23 May 2025
3 Jun 2025
23 May 2025
23 May 2025 - 30 May 2025
Amount
Supply & fixing of timer complete set 1 NO + 1 NC with ML4 Contactor complete set
Supply & fixing of L&T 3 pole ML 4 power contactor SS90910
KRTPN10 Bch Pneumatic Timer
Supply and fixing of 3 core 2.5 sq. Mm
Cost of MS clamp with Nut & Bolts.
Push Button
Indicating Lamp
Providing of Limit switch
Copper cable 2.5 sq.mm 2 core
Auxilary contactor
Total impact of GST for the purpose of CTC
M/S S. Z. Brothers & Company (BID ID -1156870)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .