Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.0 LAdmitted-Finance | ₹47.0 L | L1 | Admitted-Finance |
| 2 | L2₹50.1 LAdmitted-Finance | ₹50.1 L | L2 | Admitted-Finance |
| 3 | L3₹57.8 LAdmitted-Finance | ₹57.8 L | L3 | Admitted-Finance |
| 4 | L4₹76.8 LAdmitted-Finance | ₹76.8 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | POWERTECH TRANSFORMER SERVICES L2 | vindhya construction L1 | ADHATA CORPORATION L4 | M/S SCIENTECS PROCESS CONTROL L3 |
|---|---|---|---|---|---|---|---|
| 1.01 | PART A
Dismantling of OLD GT and its accessories from service bay
(Lump sum rate per transformer shall be quoted here) | 1 | Lump sum per transformer | 6,80,000 ₹8,02,400 | 6,90,000 ₹8,14,200 | 6,50,000 ₹7,67,000 Lowest | 8,50,000 ₹10,03,000 |
| 1.02 | PART A
Dragging on rails / sleeper & placement on plinth for Old GT from service bay to storage bay
(Lump sum rate per meter shall be quoted here) | 25 | Price per meter | 95,000 ₹1,12,100 | 10,000 ₹11,800 Lowest | 2,50,000 ₹2,95,000 | 37,500 ₹44,250 |
| 1.03 | PART A
Receipt, dragging, handling, storage, erection, oil processing, commissioning and handing over the transformer. Price for 1 No. 250MVA, 15.75/420kV, 3-Ph, GT at Singrauli Site (Scope of Work as per Clause 4.1 to 4.5 of tender) (Lump sum rate per transformer shall be quoted here) | 1 | Lump sum per transformer | 24,80,000 ₹29,26,400 Lowest | 29,20,010 ₹34,45,611.8 | 35,00,000 ₹41,30,000 | 36,77,000 ₹43,38,860 |
| 1.04 | PART A
Dragging on rails / sleeper & placement on plinth of 250MVA transformer up to 200m dragging (Basic lump sum rate per meter shall be quoted here) | 200 | Price per meter | 7,60,000 ₹8,96,800 | 80,000 ₹94,400 Lowest | 10,00,000 ₹11,80,000 | 3,00,000 ₹3,54,000 |
| 2.01 | PART B (OPTIONAL)
Additional dragging of transformer on rail / sleeper either due to distance being more than that specified in scope of work (Basic lump sum rate per meter shall be quoted here) | 1 | Price per meter | 3,800 ₹4,484 | 500 ₹590 Lowest | 7,000 ₹8,260 | 1,500 ₹1,770 |
| 2.02 | PART B (OPTIONAL) Additional Turning of transformer by 180 degree for dragging / placement of plinth
(Basic lump sum rate per transformer shall be quoted here) | 1 | Lump Sum | 40,000 ₹47,200 | 1,20,000 ₹1,41,600 | 2,00,000 ₹2,36,000 | 10,000 ₹11,800 Lowest |
| 2.03 | PART- B (OPTIONAL) To carryout additional drying of transformer beyond the mandatory cycles) by N2 purging & heating under N2 filled condition. Supply of N2 cylinders having required dew point and heaters shall be contractor scope
(Basic lumpsum rate per cycle shall be quoted here) | 1 | Price per cycle | 1,00,000 ₹1,18,000 | 10,000 ₹11,800 Lowest | 5,00,000 ₹5,90,000 | 10,000 ₹11,800 Lowest |
| 2.04 | PART- B (OPTIONAL)
EXTRA HIRE CHARGES
Labour charges for repair / rectification / modification / additional work
(Rate per day shall be quoted here) | 1 | Rate per day | 10,000 ₹11,800 | 2,000 ₹2,360 | 50,000 ₹59,000 | 850 ₹1,003 Lowest |
| 2.05 | PART-B (OPTIONAL)
Hire charges for providing major facilities by contractor if needed for additional / extra work. Long boom Cranes suitable for Bushing Erection (Rate per day shall be quoted here) | 1 | Per day | 25,000 ₹29,500 | 20,000 ₹23,600 | 50,000 ₹59,000 | 1,000 ₹1,180 Lowest |
| 2.06 | PART-B (OPTIONAL) Derrick (Rate per day shall be quoted here) | 1 | Per day | 20,000 ₹23,600 | 35,000 ₹41,300 | 2,00,000 ₹2,00,000 | 3,000 ₹3,540 Lowest |
Tender Value
Refer Docs
EMD Value
₹18,900
Closing Date
25 Jul 2026, 12:00 pmClosed
SMRM
TELK, ANGAMALY
DISMANTLING AND SHIFTING OF EXISTING 1 UNIT OF BHEL MAKE OLD GT LEADING AND POSITIONING ERECTION TESTING AND COMMISSIONING AT SERVICE BAY OF 1 UNIT 250MVA GT WITH OCTC FOR NTPC SINGRAULI STPS STAGE 1 UTTAR PRADESH.
2026_TEKL_860874_1
TELK/C AND M/OES/TRER/366/2026
Open Tender
Miscellaneous Works
Item Wise
365 days
SINGRAULI UTTAR PRADESH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,835
Yes
₹18,900
Yes
30 Jul 2026
16 Jul 2026
27 Jul 2026
16 Jul 2026
25 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | PART A
Dismantling of OLD GT and its accessories from service bay
(Lump sum rate per transformer shall be quoted here) | 1 | Lump sum per transformer | - | - |
| 1.02 | PART A
Dragging on rails / sleeper & placement on plinth for Old GT from service bay to storage bay
(Lump sum rate per meter shall be quoted here) | 25 | Price per meter | - | - |
| 1.03 | PART A
Receipt, dragging, handling, storage, erection, oil processing, commissioning and handing over the transformer. Price for 1 No. 250MVA, 15.75/420kV, 3-Ph, GT at Singrauli Site (Scope of Work as per Clause 4.1 to 4.5 of tender) (Lump sum rate per transformer shall be quoted here) | 1 | Lump sum per transformer | - | - |
| 1.04 | PART A
Dragging on rails / sleeper & placement on plinth of 250MVA transformer up to 200m dragging (Basic lump sum rate per meter shall be quoted here) | 200 | Price per meter | - | - |
| 2.01 | PART B (OPTIONAL)
Additional dragging of transformer on rail / sleeper either due to distance being more than that specified in scope of work (Basic lump sum rate per meter shall be quoted here) | 1 | Price per meter | - | - |
| 2.02 | PART B (OPTIONAL) Additional Turning of transformer by 180 degree for dragging / placement of plinth
(Basic lump sum rate per transformer shall be quoted here) | 1 | Lump Sum | - | - |
| 2.03 | PART- B (OPTIONAL) To carryout additional drying of transformer beyond the mandatory cycles) by N2 purging & heating under N2 filled condition. Supply of N2 cylinders having required dew point and heaters shall be contractor scope
(Basic lumpsum rate per cycle shall be quoted here) | 1 | Price per cycle | - | - |
| 2.04 | PART- B (OPTIONAL)
EXTRA HIRE CHARGES
Labour charges for repair / rectification / modification / additional work
(Rate per day shall be quoted here) | 1 | Rate per day | - | - |
| 2.05 | PART-B (OPTIONAL)
Hire charges for providing major facilities by contractor if needed for additional / extra work. Long boom Cranes suitable for Bushing Erection (Rate per day shall be quoted here) | 1 | Per day | - | - |
| 2.06 | PART-B (OPTIONAL) Derrick (Rate per day shall be quoted here) | 1 | Per day | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 24.85 MB
BOQ_1455811.xls
BOQ • 0.29 MB
d.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].