Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | ₹2.2 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | ADARSH C L1 |
|---|---|---|---|---|
| 1.00Culvert | ||||
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 2.8 | cum | 620 ₹1,736 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 9.41 | cum | 240 ₹2,258.88 |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 2.2 | cum | 1,500 ₹3,300 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 3.33 | cum | 8,000 ₹26,624 |
| 1.00 | 4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts | 22.8 | sqm | 890 ₹20,292 |
| 1.01 | 4.2.5:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) | 6.31 | cum | 10,800 ₹68,126.4 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 10.48 | sqm | 660 ₹6,916.8 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 4.5 | sqm | 840 ₹3,780 |
| 1.01 | 5.9.16.2:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsAbove 20 cm wide | 3.54 | sqm | 880 ₹3,115.2 |
Tender Value
₹2.3 L
EMD Value
₹5,663
Closing Date
3 Jul 2025, 6:55 pmClosed
Assistant Executive Engineer
o/oAssistant Executive Engineer KyIP Canal Subdivision Vatakara
DEPOSIT-KyIP Deposit work-(Velom GP 2024-25)- Construction of Puthoor Mukku Aarangatt canal palam in Kuzhivayal FB at Ch.0/400km-General Civil Work
2025_Irrig_769321_2
IRR/PI/TR/1614/2022_5_13_12/1
Open Tender
Civil Works - Bridges
180 days
peruvayal
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹5,663
Yes
9 Jul 2026
26 Jun 2025
5 Jul 2025
26 Jun 2025
3 Jul 2025
26 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1260300.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid