Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | -30.57% | ₹5.7 L | L1 | Admitted-Finance |
| 2 | L2₹6.0 L+₹27,808.20 (4.84%)Admitted-Finance | -27.21% | ₹6.0 L+₹27,808.20 (4.84%) | L2 | Admitted-Finance |
| 3 | L3₹6.1 L+₹35,753.40 (6.22%)Admitted-Finance | -26.25% | ₹6.1 L+₹35,753.40 (6.22%) | L3 | Admitted-Finance |
| 4 | L4₹6.4 L+₹66,789.34 (11.6%)Admitted-Finance | -22.50% | ₹6.4 L+₹66,789.34 (11.6%) | L4 | Admitted-Finance |
| 5 | L5₹6.6 L+₹87,562.72 (15.2%)Admitted-Finance | -19.99% | ₹6.6 L+₹87,562.72 (15.2%) | L5 | Admitted-Finance |
Tender Value
₹8.3 L
EMD Value
₹16,553
Closing Date
31 Aug 2026, 2:00 pmClosed
Executive Engineer,KID
Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on and from 11.08.26 to 15.08.2026 for a length of 200.00 m in between ch 10.00 km to 10.20 Km of Banstala river right embankment at Mouza Taktipur, Block Kakdwip
2026_IWD_5020343_17
WBIW/EE/KIDIVISION/e-SNIT- 12 (e)/2026-27
Open Tender
CIVIL WORKS
Percentage
14 days
Kakdwip
Please refer Tender documents.
6 documents required · 6 mandatory
₹16,553
Yes
10 Sept 2026
26 Aug 2026
1 Sept 2026
26 Aug 2026
31 Aug 2026
26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. To be measured at mid length). | - | Mtr. | 34.56 | - |
| 2 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
(a) Where boats are not necessary. | - | Mtr. | 13.11 | - |
| 3 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | - | Mtr. | 26.22 | - |
| 4 | Supplying to site empty cement polythene bags (capacity50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | - | Each | 7.15 | - |
| 5 | Labour charges for filling empty cement gunny bag / polythene bag (capacity50kg) with all kinds of earth (wetordry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:-Volume of earth / sand filled bags should not be less than 0.028 cum / bag. | - | Each | 8.34 | - |
| 6 | Dumping in position earth /sand filled gunny / poly bags (capacity50kg) within a lead of 30 metre inclusive of all lifts. | - | Each | 3.58 | - |
| 7 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, channels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of A) Beyond 4.00 Km and upto 5.00 Km. NB: Measurement to be taken on the basis of stack measurement / pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.Note 1: Extra rate towards compensation for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department has been added in this derivation @ ₹43.00/m³ [Vide Ref: Page No: 87, Item No: 16(Note) of NH Schedule of Rates 2019]Note 2: The rate of royalty for earth/soil/fine sand/silt used for filling/brick making ( including such materials derived from dredging/de-silting) as notified same as that of Ordinary Earth/Brick Earth/fuller Earth vide Gazette notification No. 581-ICE-12013(99)/6/2022-MINES SEC-Dept. of ICE, Date:- 26.09.2022 of Department of Industry, Commerce & Enterprises Mines Branch @ ₹29.00/m³ has been added in this derivation. The royalty will be paid to the agency on production of necessary documents in support of paymentmade towards the royalty.Note 3: Extra rate towards cess for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department has been added in this derivation @ ₹5.30/m³ [Vide Ref: Memo No: 138/3512-29/C/99 Dated; 22.06.2000 of DLR & Jt. LRC, WB] | - | Cum | 392.46 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_5094900.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .