Construction work of PCC path and RCC drain from Ashok Singh's house to Rajesh Chaudhur, Ashok Kumar Singh's house, from Vijay Kumar's house to Shivakant Chaubey's house and from Manoj Singh's house to Abhay Singh's house in Ward No. 37 under Motihari Municipal Corporation area.
134371
NIT-13/2026-27-NNM-GR-47
Open Tender
CIVIL
Purbi Champaran
• PAN NO
• GST NO
• REGISTRATION NO
• AFFIDAVITE
• TOOLS & PLANT
• CHARACTER CERTIFICATE
• ITR LAST 3 YEARS DETAILS
• TURN OVER
CIVIL
PERCENTAGE
L1
1
12 documents required · 12 mandatory
₹5,000
Processing Fee: 590
₹52,600
MEENA BAZAR MOTIHARI
22 Jun 2026
22 Jun 2026
10 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
3 Jul 2026
Bill of Quantity
Name of Scheme:- नगर निगम मोतिहारी के वार्ड संख्या - 37 में अशोक सिंह के घर से राजेश चौधुर के घर तक, अशोक कुमार सिंह के घर से मैनजेर सिंह के घर, विजय कुमार के घर से शिवाकांत चौबे के घर तक एवं मनोज सिंह के घर से सुजीत कुमार सिंह के घर तक पी.सी.सी. पथ एवं आर.सी.सी. नाला निर्माण कार्य |
Estimated Cost:- Rs. 2551859
E/M to be Deposited:- Rs.
Cost of BOQ:- Rs.
Time of complition:-
Date of Tender:-
E-Tendaring Fee
Sl No. SOR Item of Works Unit Quantity Rate Amount
1 BCD 15.24 Dismantling of old B.E.S. including stacking of servicable materials & disposal and spoil . Do all complete job as per spec. & direc. Of E/I. CUM 23.21 535.6 12431.28
2 BCD 2.25(A) Providing E/W filling in Road side Embankment including dressing of sides and ramming of bottoms with all comp. job and direction of E/I. m3 99.78 411.70 41079.43
3 BCD 2.8.1 Providing E/W excavation foundation trenches including dressing of sides and ramming of bottoms with all comp. job and direction of E/I. m3 .119.93 360.70 43258.75
4 BCD/ 2.28 Supply and filling inplinth with local sand under floor including watering ramming can soil dating and dressing comp. m3 75.85 287.30 21791.71
5 BCD/ 11.72 Providing designation 100A one brick flat soling joint filled with local sand including cost of watering taxes royality all complete as per building specification and direction E/I. m2 141.73 283.30 40152.11
6 BCD/ 11.73 Providing designation 100A one brick EDGE soling joint filled with local sand including cost of watering taxes royality all complete as per building specification and direction E/I. m2 389.88 444.80 173418.62
7 BCD 5.9.1 Centring and shuttering including strutting,propping etc.and removal of Foundations, footings, bases of columns etc. for mass concrete m2 609.53 375.10 228634.70
8 BCD 4.1.3 Providing and laying P.C.C. (1:2:4) with sone sand and 20 mm nominal size of aggregate and all comp. job and direction of E/I. m3 3.25 3998.10 12993.83
9 BCD 16.42 Cement conctre 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size ) in pavements , laid to required slone and camber in panels as required including consolidation finishing and tamping complete. m3 59.40 4649.00 276150.60
10 BCD 5.1.2 Providing and laying R.C.C. (1:1.5:3) IN DRAIN with sone sand and 20 mm nominal size of aggregate and all comp. job and direction of E/I. m3 79.55 4688.30 372954.27
11 BCD 5.22.7C Providing Reinforcement of different dia of MS ROD including cutting, bending and binding and all comp. job and direction of E/I.@ 2.5 KG/CFT m2 7022.50 92.60 650283.50
12 BCD 10.2 Structural steel work riveted or bolted in built up sections, trusess and framed work, including cutting,hoisting,fixing in position and applying a priming coat of approved ateef primer all complete. MS Angale 125mmx75mmx6 mm kg 403.76 95.40 38518.70
Add Carriage cost of materials:
13 Add carriage of bricks Nos 15538 919.21 14282.68
14 Add. carriage of local sand m3 89.69 310.47 27846.05
15 Add. carriage of sone sand m3 60.93 2941.19 179206.71
16 Add. carriage of i stone chips m3 118.10 2547.88 300904.63
Add Extra cost of materials:
17 Extra cost of bricks. Nos 15538 359.04 5578.76
18 Extra cost of Cement. MT 50.82 231.56 11767.88
19 Add for sign board & photograph. 0.00
Sub Total: 2451254.20
add extra gst 5.36% 131387.23
20 Deduction for old bricks Nos -9993.00 5128.00 -51244.10
Add S. Fee cost of material:
add 18 % gst 3121.34
total (B) 20462.15
Grand Total: 2551859
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 13.pdf
NIT • 0.74 MB
Corrigendum.pdf
NIT • 0.14 MB
NIT 13.pdf
NIT • 0.74 MB
BOQ 47.xlsx
NIT • 0.01 MB
Download all tender documents and submit your bid