| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 CrAccepted-AOC E 30 2ND FLOOR 2ND AVENUE BESANT NAGAR CHENNAI 600 090 | CHENNAI | TAMIL NADU | 600090 | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.9 Cr+₹1.3 Cr (5.19%)Rejected-AOC TS NO 1396 NORTH MAIN STREET PUDUKOTTAI 622 001 | PUDUKOTTAI | PUDUKOTTAI | TAMIL NADU | 622001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹26.0 Cr+₹1.4 Cr (5.59%)Rejected-AOC DOOR NO 2 9 AN TOWERS DR SATHYAMOORTHY HOSPITAL OPP ROAD 2 5 PERUNDURAI ROAD ERODE TAMILNADU 638011 | ERODE | ERODE | TAMILNADU | 638011 | L3 | Rejected-AOC L3 | |
| 4 | L4₹26.9 Cr+₹2.3 Cr (9.25%)Rejected-AOC SF NO 454 RAGHUPATHYNAICKENPALAYAM RAILWAY COLONY POONDURAI MAIN ROAD ERODE | ERODE | ERODE | TAMIL NADU | L4 | Rejected-AOC L4 | |
| 5 | L5₹27.3 Cr+₹2.7 Cr (11.1%)Rejected-AOC 29 A P T C ROAD NEAR BUS STAND MADURAI 625017 | MADURAI | TAMIL NADU | 625017 | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | ANNAI INFRA DEVELOPERS LIMITED L3 | A Ramanathan and Co L6 | RPP INFRA PROJECTS LIMITED L4 | SUN CONSTRUCTIONS L2 | SAI HRIDHAM INFRAA LIMITED L5 | AVP INFRACON LIMITED L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Road Work (Part-A) | |||||||||
| 1.01 | Removing the top soil including Earth Work Excavation in all classes of soils, removal of weeds and vegetation, roots etc., and depositing in the places shown by the Engineer incharge etc., complete and as per the standard specification and as per the direction of SIPCOT officials. | 23,705 | Cum | 79 ₹18,72,695 Lowest | 102.8 ₹24,36,874 | 94 ₹22,28,270 | 91.75 ₹21,74,933.75 | 90 ₹21,33,450 | 85 ₹20,14,925 |
| 1.02 | Supplying and laying of 300 mm dia. RCC non pressure spun pipes with socket and spigot ends - NP 2 class as per IS 458/2003 manufactured with sulphate resistance cement with 12mm Hi - alumina lining with rubber rings including labour charges for laying at proper levels and locations, transportation cost, jointing materials etc complete complying with standard specification and as directed by SIPCOT Officers. | 1,560 | Rm | 840 ₹13,10,400 Lowest | 1,297.49 ₹20,24,084.4 | 1,110 ₹17,31,600 | 1,157.99 ₹18,06,464.4 | 1,300 ₹20,28,000 | 900 ₹14,04,000 |
| 1.03 | Supplying and Filling with Quarry Dust to the required thickness of 100 mm including cost and conveyance of all materials to site from any approved source satisfying the standard specifications and all labour charges for filling in layers compacting, ramming to obtain the maximum density by watering with all leads for water including all other incidental charges etc., complete complying with standard specification and as directed by SIPCOT Officers. Bedding to Blocks. | 1,100 | Cum | 2,000 ₹22,00,000 | 543 ₹5,97,300 | 465 ₹5,11,500 | 484.63 ₹5,33,093 | 448 ₹4,92,800 Lowest | 500 ₹5,50,000 |
| 1.04 | Forming Embankment by conveying earth from borrowed area outside the complete with a lead of 10km having CBR value not less then 7% which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 200 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 97% proctor density for the soil below the top of 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete as per MORTH standard specification for road embankment with a lead of 5KM. | 21,825 | Cum | 575 ₹1,25,49,375 | 341.74 ₹74,58,475.5 | 296 ₹64,60,200 | 305 ₹66,56,625 | 440 ₹96,03,000 | 290 ₹63,29,250 Lowest |
| 1.05 | Construction of Sub Grade with approved material to the required compacted thickness as per Table 300 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers. and for road embankment whith lead of 10km. | 25,280 | Cum | 600 ₹1,51,68,000 | 341.74 ₹86,39,187.2 | 296 ₹74,82,880 | 305 ₹77,10,400 | 440 ₹1,11,23,200 | 290 ₹73,31,200 Lowest |
| 1.06 | Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- V of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers. | 10,110 | Cum | 2,000 ₹2,02,20,000 | 1,500 ₹1,51,65,000 Lowest | 1,750 ₹1,76,92,500 | 1,604.77 ₹1,62,24,224.7 | 1,680 ₹1,69,84,800 | 1,500 ₹1,51,65,000 Lowest |
| 1.07 | Providing and laying, spreading and compacting graded stone aggreates to Wet Mix Macadam Base Course of 250mm compacted thickness specification in two layers of 125mm thick each or else as specified on the prepared sub base by providing approved Coarse graded material conforming to Table 400 - 13 and satisfying the physical requirement for material for WMM as per Table 400 - 12 of MORTH Rev.-5, including pre-mixing the materials with water at OMC in mechanical mix plant carriage of mixed matrerial by tipper to site laying in uniform layers with favours in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev.-5 and as directed by SIPCOT Officers. | 13,325 | Cum | 2,100 ₹2,79,82,500 | 2,000 ₹2,66,50,000 | 2,050 ₹2,73,16,250 | 1,945.57 ₹2,59,24,720.25 | 2,035 ₹2,71,16,375 | 1,750 ₹2,33,18,750 Lowest |
| 1.08 | Providing and laying Prime Coat over wet mix macadam surface using 7.00 Kg bitumen for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 502 of MORT & H specifications. | 38,400 | Sqm | 60 ₹23,04,000 Lowest | 81.79 ₹31,40,736 | 75 ₹28,80,000 | 73 ₹28,03,200 | 60 ₹23,04,000 Lowest | 65 ₹24,96,000 |
| 1.09 | Providing and laying Tack Coat over treated wet mix macadam surface using 2.50 Kg bitumen to cut back for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 503 of MORT & H specifications. | 38,400 | Sqm | 10 ₹3,84,000 Lowest | 18.83 ₹7,23,072 | 16 ₹6,14,400 | 16.85 ₹6,47,040 | 15 ₹5,76,000 | 15 ₹5,76,000 |
Tender Value
₹28.9 Cr
EMD Value
₹14.6 L
Closing Date
19 Nov 2024, 3:30 pmClosed
Managing Director
SIPCOT Head office Egmore Chennai
Creation of Infrastructure Facilities Viz Formation of Internal Roads with side drain, culverts and providing Water supply distribution pipe line at SIPCOT Industrial Park, Manaparai Phase-I, (Zone-II) and Phase-II
2024_SIPCT_493544_1
NIT.No.26/CD/T.No.26/2024-25
Open Tender
Civil Works
Lump-sum
SIPCOT Industrial Park, Manaparai Phase-I
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹14.6 L
SIPCOT Head office
4 Sept 2025
16 Oct 2024
20 Nov 2024
16 Oct 2024
19 Nov 2024
16 Oct 2024
23 Oct 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road Work (Part-A) | |||||
| 1.01 | Removing the top soil including Earth Work Excavation in all classes of soils, removal of weeds and vegetation, roots etc., and depositing in the places shown by the Engineer incharge etc., complete and as per the standard specification and as per the direction of SIPCOT officials. | 23,705 | Cum | - | - |
| 1.02 | Supplying and laying of 300 mm dia. RCC non pressure spun pipes with socket and spigot ends - NP 2 class as per IS 458/2003 manufactured with sulphate resistance cement with 12mm Hi - alumina lining with rubber rings including labour charges for laying at proper levels and locations, transportation cost, jointing materials etc complete complying with standard specification and as directed by SIPCOT Officers. | 1,560 | Rm | - | - |
| 1.03 | Supplying and Filling with Quarry Dust to the required thickness of 100 mm including cost and conveyance of all materials to site from any approved source satisfying the standard specifications and all labour charges for filling in layers compacting, ramming to obtain the maximum density by watering with all leads for water including all other incidental charges etc., complete complying with standard specification and as directed by SIPCOT Officers. Bedding to Blocks. | 1,100 | Cum | - | - |
| 1.04 | Forming Embankment by conveying earth from borrowed area outside the complete with a lead of 10km having CBR value not less then 7% which has to compacted properly and form a stable embankment including cost , loading and unloading and labour for proper setting out, stripping and storing the top soil, if necessary compacting the original ground by vibratory roller to have a relative compaction of required proctor density, spreading the materials uniformly over the entire width of embankment in layers of not exceeding 200 mm compacted thickness, breaking clods, watering with all leads for water, compacting to 97% proctor density for the soil below the top of 0.5 meter height of sub grade under optimum moisture content with moisture content adjusted in the range of one per cent (1 %) above and two percent (2%) below the optimum moisture content determined as per IS. 2720 (Part VII) with power roller rolling and other construction equipments approved by engineer-in-charge and finishing the embankment at 97% proctor density including compaction to specified requirement, working in narrow width of embankment including hire and fuel charges for all tools and plants and all other incidental charges etc. Complete as per MORTH standard specification for road embankment with a lead of 5KM. | 21,825 | Cum | - | - |
| 1.05 | Construction of Sub Grade with approved material to the required compacted thickness as per Table 300 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers. and for road embankment whith lead of 10km. | 25,280 | Cum | - | - |
| 1.06 | Construction of Granular Sub - Base (GSB) to the required compacted thickness (Drainage layer) by providing approved Coarse graded material conforming to Grading- V of Table 400 - 1 and satisfying the physical requirement for material for GSB as per Table 400 - 2 of MORTH Rev.-5 including screening, spreading in uniform layers with motor grader on prepared surface, watering and premixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller 80 to 100 KN static weight to achieve the desired density and fine dressing to required grade and cross slope as directed by the SIPCOT officers etc., complete including obtaining and transporting all materials from approved quarry site to work site with all lift and lead by mechanical transport, head load or any other mode of transporation including cost and conveyance of all materials, labour charges,hire charges and fuel charges for loader, water tanker with sprinkler,motor grader, vibratory road rollers and all other equipments, tools and plants, safety measures, testing required including all other incidental charges, etc., complete as per the standard specification as per clause 401 of MORTH Rev.-5 and as directed by the SIPCOT officers. | 10,110 | Cum | - | - |
| 1.07 | Providing and laying, spreading and compacting graded stone aggreates to Wet Mix Macadam Base Course of 250mm compacted thickness specification in two layers of 125mm thick each or else as specified on the prepared sub base by providing approved Coarse graded material conforming to Table 400 - 13 and satisfying the physical requirement for material for WMM as per Table 400 - 12 of MORTH Rev.-5, including pre-mixing the materials with water at OMC in mechanical mix plant carriage of mixed matrerial by tipper to site laying in uniform layers with favours in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rental for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev.-5 and as directed by SIPCOT Officers. | 13,325 | Cum | - | - |
| 1.08 | Providing and laying Prime Coat over wet mix macadam surface using 7.00 Kg bitumen for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 502 of MORT & H specifications. | 38,400 | Sqm | - | - |
| 1.09 | Providing and laying Tack Coat over treated wet mix macadam surface using 2.50 Kg bitumen to cut back for 10 sqm area including cost and conveyance of bitumen binder including labour charges for preparing the surface and applying the required quantity as tack coat by bitumen sprayer etc.complete as per clause 503 of MORT & H specifications. | 38,400 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_586437.xls
BOQ • 0.35 MB
154419826.pdf
Tender Documents • 0.39 MB
154419828.html
Tender Documents • 0.06 MB
AnnexureI.pdf
Tender Documents • 0.61 MB
AnnexureII.pdf
Tender Documents • 1.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .