Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹93,044.40Admitted-Finance VILLAGE BADHAL JEORI TEHSIL RAMPUR DISTT SHIMLA H P | L1 | Admitted-Finance | ||
| 2 | L2₹96,637.21+₹3,592.81 (3.86%)Admitted-Finance HPSEBL RECKONGPEO HIMACHAL PRADESH | L2 | Admitted-Finance | ||
| 3 | L3₹1.0 L+₹7,369.86 (7.92%)Admitted-Finance HIMACHAL PRADESH HP | L3 | Admitted-Finance |
Tender Value
₹93,000
EMD Value
₹2,325
Closing Date
31 Oct 2026, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SR.XEN
ED RECKONG PEO
Tender for restoration of existing 22kV Nathpa Katgaon and Nathpa Nichar feeder Damaged at various location due to heavy rainfall/shooting stone/landslide on dated 09/08/2026 and 10/08/2026 in Electrical Section Katgaon and Nichar under Electrical Su
2026_HPSEB_146576_1
RPO/ED/DB-11/2026-27/27
Open Tender
Supply and Erection
Percentage
30 days
bhabanagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹2,325
5 Nov 2026
24 Oct 2026
2 Nov 2026
24 Oct 2026
31 Oct 2026
24 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalement Charges of 22kV HT line. | - | - | - | - |
| 2 | Dismentalement charges of ST poles D/Pole Str. (with complete accessories.) | 2 | Each | 1,652 | ₹3,304 |
| 3 | Dismentalement charges of ST poles S/Pole Str. (with complete accessories.) | 2 | Each | 826 | ₹1,652 |
| 4 | De-sagging of ACSR conductor 6/1/3.35mm. (Removal of conductor & De stringing only) | 2.27 | P/Km | 5,310 | ₹12,027.15 |
| 5 | Erection of 22kV H.T Line | - | - | - | - |
| 6 | Erection of pole.Digging of pit, (ii) Laying of RCC muff (iv) Erection of pole (v) fixing of insulator,X-arm, X-bracing set, (vi) fixing of Barbed wire, Danger plate (vii) filling of pit & Ramming D/Pole str. (Complete in all respect). | 2 | Each | 12,628.36 | ₹25,256.72 |
| 7 | Erection of pole.Digging of pit, (ii) Laying of RCC muff (iii) Drilling of holes in X-bracing set, X-arms (iv) Erection of pole (v) fixing of insulator,X-arm, Knee bracing set, Top Clamp (vi) fixing of Barbed wire, Danger plate (vii) filling of pit & Ramming i/c painting of pole S/Pole str. (Complete in all respect). | 2 | Each | 6,033.34 | ₹12,066.68 |
| 8 | Re erection/erection of stay set (HT). | - | - | - | - |
| 9 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. | 4 | P/set | 2,338.76 | ₹9,355.04 |
| 10 | SAGGING OF ACSR CONDUCTOR 6/1/3.35mm (Single wire). | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.00 MB
BOQ_218530.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .