Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 CrAdmitted-Finance 2 FRIENDS ENCLAVE SHAH NAGAR P O DEFENCE COLONY DEHRADUN WORKS AT RESHAM MAJRI GURUDWARA ROAD LAL TAPPAR IND AREA RISHIKESH DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹1.1 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | UTTARANCHAL FORGINGS INDUSTRY L2 | HVAC ENIGINEERING COMPANY L1 |
|---|---|---|---|---|---|
| 1.00De-Centralized Material | |||||
| 1.01 | M.S. Holding Clamps | 28 | Nos | 350 ₹9,800 | 290 ₹8,120 |
| 1.02 | Cable Holding Clamp | 50 | Nos | 370 ₹18,500 | 310 ₹15,500 |
| 1.03 | PP & CLAMP WITH N&B ST POLE SP-72 | 30 | Nos | 365 ₹10,950 | 355 ₹10,650 |
| 1.04 | PP & CLAMP WITH N&B ST POLE SP-55 | 305 | Nos | 240 ₹73,200 | 253 ₹77,165 |
| 1.05 | PP & CLAMP WITH N&B ST POLE SP-33 | 16 | Nos | 400 ₹6,400 | 375 ₹6,000 |
| 1.06 | PP & CLAMP WITH N&B ST POLE SP-23 | 2 | Nos | 170 ₹340 | 125 ₹250 |
| 1.07 | STAY CLAMP FOR ST POLE WITH NUT BOLT | 80 | Nos | 260 ₹20,800 | 250 ₹20,000 |
| 1.08 | STAY CLAMP FOR ST POLE WITH NUT BOLT Sp 33 | 6 | Nos | 285 ₹1,710 | 275 ₹1,650 |
| 1.09 | STAY CLAMP FOR ST POLE WITH NUT BOLT Sp 72 | 4 | Nos | 330 ₹1,320 | 345 ₹1,380 |
Updated dates
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
13 Apr 2026, 1:00 pmClosed
Superintending Engineer, EDC(U),Dehradun
Office of the Superintending Engineer, EDC(U),Dehradun
Work Related Electrical Network Modification on Road Under EDD(South), Dehradun.
2026_UPCL4_92491_1
Tender No.53/EDC(U)/2025-26
Open Tender
Electrical Works
120 days
as per tender specificaiton
As Per Tender Specification
4 documents required · 4 mandatory
₹11,800
Executive Engineer, ETD(U),Dehradun
₹2.1 L
6 Jun 2026
26 Feb 2026
13 Apr 2026
27 Feb 2026
13 Apr 2026
28 Feb 2026
De-Centralized Material
M.S. Holding Clamps
Cable Holding Clamp
PP & CLAMP WITH N&B ST POLE SP-72
PP & CLAMP WITH N&B ST POLE SP-55
PP & CLAMP WITH N&B ST POLE SP-33
PP & CLAMP WITH N&B ST POLE SP-23
STAY CLAMP FOR ST POLE WITH NUT BOLT
STAY CLAMP FOR ST POLE WITH NUT BOLT Sp 33
STAY CLAMP FOR ST POLE WITH NUT BOLT Sp 72
LT Clamp SP-55 W/O N&B
LT Clamp SP-21 W/O N&B
LT Clamp SP-72 W/O N&B
Earth wire Clamp SP-72 Pole
PP & CLAMP WITH N&B ST POLE SP-72
SHACKLE INSULATOR 100X115 mm WITH N&B
Piercing Connector 16-16sqmm
Piercing Conductor 120-35sqmm
PIERCING CLAMP FOR 120-120 SQ MM
LT Bare N Con.PG Clamp For L-L 95-95sqmm
Connector 95-35 sq. mm
PRC contutor 95x120
Connecting Cable XLPE AL. 1x35 sq. mm.
AL CRIMPING TYPE LUGS 35 SQ.mm
8 SWG GI Wire
GS Wire 7/16 SWG
G.I. PIPE 6 INCH
11 KV Straight Thro 3X300
AL. CRIMPING TYPE LUGS 50 SQ.mm
AL. CRIMPING TYPE LUGS 150 SQ.mm
Dead End Clamp with I Hook
DIST. BOX WITH N&B ABCABLE 3PH-8WAY
LT Distrution Box 3p 4 Wire
Connecting Cable AB Cable to DB 1x25sqmm
Suspension Clamp With Eye Hook
All Lugs Suitable for Dog Conductor
11 KV XLPE JOINTING KIT 3x300(straighth)
AL CRIMPING TYPE LUGS Different Size
G.I EARTHING STRIP 35X3 mm
Shear Head IPC L-L 120 -120 sq.mm
Shear Head IPC L-L 120 -25 sq.mm
Shear Head IPC L-L 25 -25 sq.mm
BRACING CLAMP BOTTOM WITH N&B SP-55
PG Clamp Dog to Dog
LT ACB Panel 800A with Metering CT & Box
AL. CRIMPING TYPE LUGS 70 SQ.mm
AL. CRIMPING TYPE LUGS 240 SQ.mm
AL. CRIMPING TYPE LUGS 120 SQ.mm
AL. CRIMPING TYPE LUGS 400 SQ.mm
33 KV HS cable END T/K 3x400 mm² O/D
33 KV Mid Span Jointing Kit
33 KV Tension Clamp with Ball &IPC
33 KV Cable Ties for Pin Insulator
33 KV IPC for covered to covered conductor
33 KV IPC for covered to Bare conductor
33 KV AAAC Covered conductor
Labour
SPECIAL EARTHING
ERECTION OF EARTHING RO
FABRICATION OF STEEL
FIXING OF GI PIPE
FIXING OF RCC CABLE ROUTE MARKER
EXCAVATION OF PIT FOR STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SINGLE SP-33 POLE
ERECTION OF SINGLE SP-55 POLE
ERECTION OF SINGLE SP-55 DOUBLE POLE
ERECTION OF SINGLE SP-55 Four POLE
ERECTION OF SINGLE SP-72 POLE
ERECTION OF SINGLE SP-72 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
DISMANTLING OF RAIL SINGLE POLE
DISMANTLING OF SP-21/SP-23 SINGLE POLE
DISMANTLING OF SP-33 SINGLE POLE
DISMANTLING OF SP-55 SINGLE POLE
DISMANTLING OF SP-55 DOUBLE POLE
DISMANTLING OF SP-55 Tri POLE
DISMANTLING OF SP-72 SINGLE POLE
DISMANTLING OF SP-72 DOUBLE POLE
DISMANTLING OF 11 KV LINE (DOG)
DISMANTLING OF 11 KV LINE(RACCOON))
DISMANTLING OF 11 KV LINE(RABBIT)
DISMANTLING OF 11 KV LINE(Panther/DOG)
DISMANTLING OF 11 KV (WEASEL)
DISMANTLING OF LT LINE 1 P 2 W(WEASEL)
DISMANTLING OF LT LINE 3 P 4 W(RACCOON)
DISMANTLING OF LT LINE 3 P 5 W(RACCON)
DISMANTLING OF LT LINE 3 P 5 W(WEASEL)
DISMANTLING OF LT LINE 3 P 5 W(DOG)
PAINTING OF SP-21/Sp-23 POLE
PAINTING OF SP-33 POLE
PAINTING OF SP-55 POLE
PAINTING OF SP-72 POLE
BRICK WORK IN 1:4 RATIO DTR PLINTH
PAINTING OF SP-72POLE
ERECTION OF BRACKET IN LT LINE
ERECTION OF BRACKET IN 11 KV LIN
ERECTION OF BRACKET IN 33 KV LIN
LAYING OF RACCOON CONDUCTOR IN HT LINE
LAYING OF RABBIT CONDUCTOR IN HT LINE
LAYING OF 3P 4W LT LINE (RACCOON)
LAYING OF 3P 4W LT LINE (DOG)
LAYING OF U/G 11 KV CABLE IN TRENCH 3X240
LAYING OF U/G 11 KV CABLE IN TRENCHLESS TECHNOLOGY
LAYING OF U/G 33 KV CABLE IN TRENCH 3X400
LAYING OF 1P 2W LT LINE(WEASEL)
LAYING OF Dog Conndutor in HT Line
LAYING OF PANTHER Conndutor in HT Line
GUARDING OF LT/11 KV LINE
T-Off Connection complete in 11 KV Line
T-Off Connection complete in 33 KV Line
LAYING OF AB CABLE OF SIZE 3x120 SQMM
MAKING OF SECTION POLE
FIXING OF 11 KV XLPE JOINTING KIT 3X300SQMM
FIXING OF 11 KV XLPE JOINTING KIT 3x240SQMM
FIXING OF 33 KV XLPE JOINTING KIT OD 3x400
FIXING OF 11 KV XLPE STRAIGHT THRU 3X300
FIXING OF 33 KV XLPE STRAIGHT THRU
CARTAGE SP-21/SP-23 POLE, 0-20 KM
CARTAGE SP-33 POLE, 0-20 KM
CARTAGE SP-55 POLE, 0-20 KM
CARTAGE SP-72 POLE, 0-20 KM
CARTAGE OF PETTY MATERIAL,0-20 KM
HEADLOAD CARTAGE SP-21/Sp-23 POLE(0-1 KM)
HEADLOAD CARTAGE SP-33 POLE(0-1 KM)
HEADLOAD CARTAGE SP-55 POLE(0-1 KM)
HEADLOAD CARTAGE SP-72 POLE(0-1 KM)
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
DISCONNECTION & RECONNECTION OF CONsumer
DISMANTLE & REINSTALL OF STREETLIGHT
SAGGING/RESAGGING OF ACSR HT LINE
BACK CARTAGE OF PETTY MATERIAL,0-20 KM
BACK CARTAGE OF SCRAP MATERIAL
HIPOT CABLE TESTING BEFORE ENERGIZING
FIXING ACCESSORIES ON SINGLE POLE SP-33
FIXING ACCESSORIES ON SINGLE POLE SP-55
FIXING ACCESSORIES ON DOUBLE POLE SP-55
FIXING ACCESSORIES ON FOUR POLE SP-55
LAYING OF 11 KV CABLE POLE TO POLE (Overhead) 3X300
INSTALLATION OF LT DIST BOX (1P & 3P)
DISMANTLE AND RESTRINGING OF LT AB CABLE3x120+1x95+1x16
EARTHING OF STRUCTURE USING GI STRIP
MAKING TRENCH IN ROCKY AREA
MAKING LOOP OF 11 KV XLPE CABLE.
DISMENTALING OF 250KVA DTR
INSTALLATION OF250KVa DTR on Pole Structure
INSTALLATION OF 100 KVa DTR on Pole Structure
Dismentaling of 100 KVA DTR
Dismentaling of 400 KVA DTR
Dismentaling of 500 KVA DTR
LAYING LT CABLE 1X400 SQ MM
Laying LT PVC Cable 150SQMM
INSTALLATION OF400/500KVa DTR onPLIth
Laying of LTXLPE ABC 3X120+1X95 +1X16 Sq.
DISMANTLE OF EXITING TPMO/GO/ISOLATOR
Fixing Of TPMO
Fixing Of Fuse Set
JUMPERING OF D/P TPMO, FUSE SET AND T/F
Fixing of Lighting Aresther
LAYING OF O/H 11KV CABLE 3X300
Making loop of 11 KV Cable Xlpe
LAYING OF LT ABC 3X120+1X70+1X16SQMM
DISMANTLING OF 33 KV (Panther/DOG
DISMANTLING OF 33 KV XLPE Cable
LAYING OF 33KV CABLE FOR POLE RISING O/H
LAYING OF U/G 33 KV CABLE IN Trenchless Technologies with HDPE pipe 3X400
Note:-Individual Quantity may be very upto any extended both +
Please Enable Macros to View BoQ information
PQR PART-1 SHEET For Tender No. 53/EDC(U)/2025-26
PART -I OPENED ON DATE 10-03-2026 AT 16:00 HRS
Full Postal Address of Tenderers (Head Office)
Works Address
Email:- ID
Joint Venture Firms
(a) In case a bid is submitted by a Joint Venture (JV) the partners of Joint Venture should collectively meet all above Qualifying Requirements.
(b) One of the partners shall be nominated as lead Partner/bidder and this authorization shall be evidenced by submitting a Power of Attorney signed by legally authorized signatories of both/all the partners.Lead Partner should have undergrounding experience.
(C) The Lead Partner shall be authorized to incur liabilities and receive instructions for and on behalf of any partners of the Joint Venture, and the entire execution of the Contract, including payment, shall be done exclusively with the Lead PARTNER.
(D) All partners of the Joint Venture shall be liable jointly and severally for the execution of the Contract in accordance with the contract terms , and a statement to this effect shall be included in the authorization mentioned under (ii) above as well as in the Bid Form and in the Contract Form( in case of a successful Bid ).
(e) Agreement entered into by the joint venture partners shall be submitted with the bid and will remain in force during the tenancy of contract and Guarantee Period thereafter.
The above cited requirements are only indicative. The owner reserves the right to requisition any other relevant information and also reserves the right to reject the Bid proposal of any Bidder, if in the Owner’s opinion the Qualification data is incomplete and Bidder is not qualified to perform the Contract satisfactorily.
Singature of Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_109474.xls
BOQ • 0.42 MB
PQR53202526.xls
Tender Documents • 0.03 MB
Coverpage53PDF.pdf
Tender Documents • 0.18 MB
Tenderdocuments53PDF.pdf
Tender Documents • 1.53 MB
Download all tender documents and submit your bid