Loading…
Loading…
Tender Value
₹2.1 L
EMD Value
₹4,230
Closing Date
30 Sept 2026, 10:00 am3d left
Executive Engineer, Mahananda Link Canal Division
Mahananda Link Canal Division, 2nd Mile, Sevoke Road, Siliguri
Pre - Boro Irrigation Maintenance and Repair works on Minor-4 and Minor-5 of Dy-2 of TMLC in Block-Rajganj and Sadar P.S.-Rajganj and Sadar Dist.-Jalpaiguri.
2026_IWD_5023164_10
WBIW/EE/MLCD/NIT-01(e)/2026-27
Open Tender
CIVIL WORKS
Percentage
Block -Rajganj
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,230
Yes
23 Sept 2026
23 Sept 2026
1 Oct 2026
23 Sept 2026
30 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying to site empty cement polythene bags(capacity 50 kg) in good condition including stacking, incidental charges etc. all complete (capacity 50 kg). | 2,064 | each | 7.15 | ₹14,757.6 |
| 2 | Labour charges for filling empty Cement gunny bag/ polythene bag (capacity 50 kg) with all kinds of earth (wet or dry),sand or aggregates (stone/brick) and sewing as done in case of cement bags,(tying with a knot after filling not be accepted) and stacking with in a lead of 30 metre as direction of Engineer-in-charge(cost is excluding the cost of any types of filling materials). NB:- Volume of earth/sand filled Bags should not be less than 0.028 cum/bag. | 2,064 | each bag | 8.34 | ₹17,213.76 |
| 3 | Dumping in position earth/sand filled gunny/poly bags (capacity 50 kg) within a lead of 30 metre. | 2,064 | each bag | 3.58 | ₹7,389.12 |
| 4 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
B) Beyond 1.00 km and upto 2.00 km.For compensation for earth for land owned and
arranged by Contractor add ` 25.00 per m³ extra over rate of E/W for land owned / arranged by the
Department & for royalty charge on earth @ 29.00
per m³ & Cesses charges @Rs.5.30 per m3(i.e. Rs.15.00 per 100 cft), as per Govt. notification which will be paid on production of necessary documents in support of payment made towards the royalties & Cesses. | 65.24 | cum | 341.21 | ₹22,260.54 |
| 5 | Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 12,512 | sqm | 2.38 | ₹29,778.56 |
| 6 | Earthwork in re-excavation / silt clearance of drainage channels in all kinds of soil including sludge and slush but excluding slush mixed with industrial wastes, sewage, municipal garbage, carcasses, etc and depositing the same as per profile in proper place as directed by the Engineer-in-charge without causing hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition including removal of polypacks, brickbats, stone ballasts & boulders, remnants of bullah & bamboo pins and all kinds of water hyacinth, solid / semi solid compact mass formed due to water hyacinth and burning them to ashes or removing outside Govt land where necessary and removal of thick & thorny jungles upto 30 cm girth including shoring and shuttering, if required, and including initial removal of sludge and slush etc by pan or bucket if required, and making arrangement for bailing out of any seepage water and removalof sandor soil blown from underneath, all complete. (Measurement : Pre-work and Post-work level section. Pre-work section to be taken after removal of water hyacinth and all other floating materials etc.)
(a) By manual means within an initial lead of 30 M and an initial lift of 1.50 M | 775.1 | cum | 154.93 | ₹1,20,086.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.06 MB
2911.pdf
Other Document • 0.51 MB
BOQ_5108020.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .