Loading…
Loading…
Tender Value
₹35.0 L
EMD Value
₹70,000
Closing Date
23 Jul 2026, 11:00 amClosed
DGM(Civil)
Civil Dept Cochin Shipyard Limited Cochin
The work involves various maintenance activities of Crane rails and accessories in Docks and Quays area.
2026_CSL_282673_1
Biennial rate contract for Maintenance of Crane rails and accessories in Docks and Quays area
Open Tender
Civil Works
Percentage
730 days
CSL, Cochin
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹70,000
2 Jul 2026
2 Jul 2026
24 Jul 2026
2 Jul 2026
23 Jul 2026
2 Jul 2026
2 Jul 2026 - 23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cleaning the shoulder drains with cover, in and around Docks and Quays area including removal of cover plate before cleaning & refixing after cleaning, depositing the silt and debris to the nearest dumping yard etc. all as directed by the Engineer-in-charge. | |||||
| 1.1 | Shoulder drain with cover (Including removal and replacement of M.S / Chequred plate covers.) | 5,500 | metre | 20 | ₹1,10,000 |
| 1.2 | Shoulder drain without cover | 4,000 | metre | 12 | ₹48,000 |
| 2 | Cleaning the crane tracks of docks & quays including removal of grease, earth etc. and disposing the debris to the nearest dumping yard all as directed by the Engineer-in-charge. | 10,000 | metre | 18 | ₹1,80,000 |
| 3Demolishing/Cutting concrete manually/ mechanical means and disposal of debris to the nearest dumping yard within 1Km. The cost should be inclusive of hire charges of machinery, labour, other incidentals etc complete all as directed by the Engineer-in-Charge. | |||||
| 3.1 | Upto 0.1 m3 is treated as One job | 3 | EA | 254 | ₹762 |
| 3.2 | Above 0.1 and upto 0.3 m3 is treated as One job | 3 | EA | 508 | ₹1,524 |
| 3.3 | Above 0.3 and upto 0.5 m3 is treated as One job | 3 | EA | 1,013 | ₹3,039 |
| 3.4 | Above 0.5 m3 is treated as One job | 5 | EA | 1,917 | ₹9,585 |
| 4 | Providing and laying RCC 1:1½:3 (1 cement : 1½ coarse sand :3 stone aggregate 20mm nominal size) including cost and conveyance of all materials including cement, labour for mixing, laying, consolidating, curing etc.complete, but excluding cost of steel formwork and supply & fabrication charges of tor steel reinforcement all as directed by the Engineer-in-charge. | - | m3 | 10,060 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
SCC.pdf
Tender Documents • 1.15 MB
GCC-Final.pdf
Other Document • 0.51 MB
BOQ_329778.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .