Tender Value
₹39.9 L
EMD Value
₹39,919
Closing Date
12 Oct 2026, 3:15 pm
GUNTUR MUNICIPAL CORPORATION
GUNTUR
Providing of CC Drains, UGD Pipe LIne & CC Road to Naidupet 5th Line and Cross Roads under Div. No.44 of AE-2 Section, GMC
993662
ET No.49/2026-27,Item No.06
OPEN - NCB
Civil Works
GUNTUR, ANDHRA PRADESH
1 document required · 1 mandatory
₹1,414
₹39,919
26 Sept 2026
26 Sept 2026
26 Sept 2026
Cutting open C.C. road surface with concrete saw cutter and removal with Breaker and tractor with 3 tonne trolly. (For UGD Pipe Line, For Manholes, For UGD HSC Connections, For HDPE Pipe Line)
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of Brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (RBR-STCL-6). (For Brick work)
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH (RBR-STCL-5). (For CC Ramps)
Earthwork excavation in Ordinary soil by Mechanical Means upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1(B)) - 1 Cum. (For 300mm Drain, For Culverts, For UGD Pipe Line, For Manholes, For UGD House connections, For HDPE Pipe Line)
Carting away the surplus excavated earth from the work site with a lead of 3 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete - 1 Cum. (100% As per Dismantling Qty (1+2+3) + 100% As per E/W Qty)
Supply of SWG SP-1 Pipe conforming to ISI 651- 6" dia (152.4mm) including loading, unloading & stacking at site. MAT-01684 (For UGD House connections)
Supply of SWG SP-1 Pipe conforming to ISI 651- 10" dia (254 mm) including loading, unloading & stacking at site. MAT-01678 (250 mm dia UGD S W G Pipe)
Lowering laying and jointing of SWG pipe including jointinting with CM (1:3) to full deth of joint in ready made line trench etc., complete as per s.s. (SWG SP-1 Pipe 10" dia (250mm) + SWG SP-1 Pipe 6" dia (152.4mm))
Manufacture, supply and delivery of H.D.P.E Pipes conforming to IS 4984-1995 including transportation to any where in A.P excluding Taxes. (Supply upto 90 mm dia in coil & above 90 dia straight length in 6 M) (P.H Items, P.55) (OD 110mm dia HDPE Pipe)
Manufacture, supply and delivery of H.D.P.E (PE-100 Grade) Fittings conforming to IS 4984-1995 including transportation to any where in A.P Excluding Taxes
HDPE 110mm dia TEE
HDPE 110mm dia Bend
MS 100mm dia Flanges
110mm dia HDPE Collars
110mm dia HDPE End Caps
OD 100mm dia CID JOINTS
Laying and jointing of H.D.P.E Pipes by butt fusion welding as per IS:7634-part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure - 1 Rmt (Public Health Items, P.5). (110mm dia HDPE Pipes)
Supply and Delivery of HSC Material (Tap Connection) including cost and conveyance of material to site etc. complete
House Service Connections (Regulating Ferrule) 1/2 "
-- HDPE Pipe OD 20mm dia
Engaging of Plumber/Pipe Fitter including all charges etc. complete. (For UGD Connections + For HSC Connections)
Engaging of Labour including all charges etc. complete. (For UGD Connections + For HSC Connections)
Filling of Stone Crusher Dust for foundation trenches including cost and conveyance off all materials and all labour charges ramming, watering etc, as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH.
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
Brick Masonary in C.M (1:6) using 2nd Class well burnt ground moulded traditional size bricks of locally available having a crushing strength of not less than 35 Kg /Sq.Cm & size of 23x11x7 Cm including cost & conveyance of Material to site, mixing of Cement Mortar & laying of bricks & mortar to specified thickness, watering, curing, including all scaffolding, hire & operational charges of Machinery, all Labour charges & all water lead charges etc. complete for finished item of work. (BLD-CSTN-3-1)
Plastering in C.M (1:3) 12 mm thick including cost and conveyance of all Material, Labour for mixing Material, laying and curing etc., complete - 10 Sq.M (BLD-CSTN-6.2).
Manufacture as per BIS 12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but excluding all taxes.
VRCC M-20 Design mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering for culvert slabs. (For Culvert Slabs)
Providing High Yield Strength Deformed (HYSD) Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No.126)
Providing, laying, spreading and compacting graded HBG Crushed stone aggregate to Wet mix macadam specification including cost, seigniorage of all material and including premixing the material with water at OMC in mechanical mixer Plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base course on well prepared surface and compacting with Vibratory roller of 8 to 10 to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MORTH & H Specification for finished item of work. (RBR-SBBS-11) (For Road)
Laying of Plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 / 53 grade at cement as per Clause 1501.2.2 (M30 Grade) at 400 kg per cum, coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.28 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, near approaches to bridge / culvert and construction joints, and curing of concrete slabs for 14- days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. (For Road)
Bailing out water from the pipe line trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper.
Provision for Seignerage Charges
Provision for NAC @ 0.10%
Provision for GST @ 18.00%
Provision for TPQA @ 0.739%
Provision for unforcement items L.S.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document1.doc
TENDER_DOCUMENT • 0.20 MB
BOQ_CC_Drains_UGD_Pipeline_CC_Road_Naidu_Pet.xlsx
TENDER_DOCUMENT • 0.02 MB
DECLARATION.docx
TENDER_DOCUMENT • 0.02 MB
Notice Inviting Tender .docx
TENDER_DOCUMENT • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .