Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.6 LAccepted-Finance | ₹76.6 L | L1 | Accepted-Finance Being quoted 0.10 percent Less. |
| 2 | L1₹76.6 LAccepted-Finance AT SANTRILOCHAMPUR PO BAIDYARAJPUR DIST JAJPUR PIN 755007 | BAIDYARAJPUR | JAJPUR | ODISHA | 755007 | ₹76.6 L | L1 | Accepted-Finance Being quoted 0.10 percent Less. |
| 3 | L1₹76.6 LAccepted-Finance | ₹76.6 L | L1 | Accepted-Finance Being quoted 0.10 percent Less. |
| 4 | L1₹76.6 LAccepted-Finance GOPINATH HOTA ODISHA | BALESHWAR | ODISHA | 756001 | ₹76.6 L | L1 | Accepted-Finance Being quoted 0.10 percent Less. |
| 5 | L1₹76.6 LAccepted-Finance AT PO KHARIAR ROAD WARD NO 19 DIST NUAPADA ODISHA | ₹76.6 L | L1 | Accepted-Finance Being quoted 0.10 percent Less. |
Tender Value
₹76.7 L
EMD Value
₹77,000
Closing Date
8 Apr 2026, 5:00 pmClosed
SE,Khariar R and B Division,Khariar
O/O SE,Khariar R and B Division,Khariar
Extension of 2nd Floor of Tahasil Office at Nuapada in the district of Nuapada for the year 2025-26
2026_EICCL_127580_1
SERNBKHR - 23 /2025-26
National Competitive Bid
Civil Works - Buildings
300 days
Nuapad
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹77,000
Yes
7 May 2026
25 Mar 2026
9 Apr 2026
25 Mar 2026
8 Apr 2026
25 Mar 2026
25 Mar 2026 - 8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORK R.C.C. work of M20 in following works using 12 mm. to 20 mm. (½” to ¾”) size (20 mm. not to exceed 25%) hard black crusher broken granite stone chips of approved quality from approved quarry including hoisting, lowering, laying and compacting concrete, watering curing, centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties, taxes of all materials with all labour and T & P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position complete in all respect as per specification and direction of the Engineer-in-charge.2nd floor Column in Super Structure | |||||
| 2Lintel | |||||
| 3Roof Beam | |||||
| 4Roof Slab | |||||
| 5Stair Case | |||||
| 6RCC Chhaja | |||||
| 7Terrace Floor Column in Super Structure | |||||
| 8Lintel | |||||
| 9Roof Beam | |||||
| 10Mumty Room Slab | |||||
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
DTCN23.pdf
Tender Documents • 2.70 MB
BOQ_586262.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid