Tender Value
₹9.8 L
EMD Value
₹9,830
Closing Date
15 Apr 2025, 3:00 pmClosed
BDO VP
PU Thogamalai
Construction of Waiting Shed, Compund wall (20m), Water supply and Pathway (6m) at Muthalaipatty
2025_RDTN_540012_1
Construction of Waiting Shed, Compund wall (20m), Water supply and Pathway (6m) at Muthalaipatty
Open Tender
Civil Works
Works
90 days
Thogamalai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,830
Yes
16 Apr 2025
7 Apr 2025
15 Apr 2025
7 Apr 2025
15 Apr 2025
7 Apr 2025
Amount
Name of the Work : Construction of Waiting Shed, Compound wall (20 m), Water Supply and Pathway (6m) at Muthalaipatty Samathuva Burial Ground - Under AGAMT - II - 2025-26
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with stand
Supplying and filling in foundation and basement with filling excavated earth in larges of not more than 15 cm thick well rammed watered and compacted including & conveyance and all labour charges etc.,
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete comply
Brick work in cm 1:5 mix(one cement and five sand )using country bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X
Supplying and erecting centering Roof beam main wall alround, Roof beam Cross wall, Botton. Sunshade bottom Front, Roof slab Hall and Roof sides
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
RCC 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Plastering surfaces of RCC items such as slabs,beams,sunshades with cement mortar 1:3 -10mm thick including packing, providing cement mortar beading for sunshades staircase ,steps, lands slabs etc.,as directed by departmental officers etc, complete compl
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc
Paving the floor with Vetrified tiles 0.60mx0.6mx0.008m in all floors over a base layer of cement mortar 1:3 (one cement and three sand ) 20mm thick laid in-situ and pointed with same coloured cement as
Paving the flooring with Step tiles Tiles in CM 1:3, 20mm thick in all floors over a base layer of cement mortar 1:3 (one cement and three sand ) 20mm thick laid in-situ and pointed with same coloured cement as
Providing weathering course with best quality of brick Jelly 20mm gauge in pure slaked lime (no sand to be added) over roof slab,the proportion of brick jelly to lime being '32 to 12.5 well beated with wooden beaters for giving required slope and thicknes
Finishing top roof mix one course machine pressed tiles of size 20 cm x 20 cm x 2 cm approved qty with,CM.1:3 12 mm thick mixed with WPC at 2% by weight of cement used and top pointed with the same mortar etc
Distembering two coats of oil bound distember using one coat of primer coat including cost & conveyance to size and all labour charges etc., complete.
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete .
Construction of Compound wall
Earth work excavation and depositing on banks with initial lead and lift inordinary soil except hard rock as per SS 20B for foundation
Cement concrete 1:4:8mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Brick work in C.M.1:5 mix using Country Bricks Ground moulded of size 23x11x5 cm for brick on edge and including all labour charges and materials charges etc., all complete.
Plastering with C.M.1:5 mix, 12mm thick and including cost and conveyance of all materials and all labour charges etc., all complete.
Painting two coats using Readymixed Exterior emulsion Paint including cost and conveyance ofall materials to site and all labour charges etc comoplete
Providing Cement Concrete Pavement
Earth work excavation and depositing on banks with initial lead and lift in ordinary soil except hard rock as per SS 20B for foundation
Supplying and filling in foundation, basement, etc with filling Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete
Supply and erecting, centering by strutting using MS Sheets and casurina props including cost of material charges and all other labur charges etc complete.
Cement concrete 1:2:4 mix using 20 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete
Cement concrete 1:3:6 mix using 20 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Bitumen Pad For Each - 5.00M
Provision for Water Supply Arrangement
Geophyshical Investication charges
Drilling of 150mmdia vertical Bore well in hard rock area including drilling in Tamil nadu including Transportation to the worksite in hard rock areas Developing the bore wells - Upto 150M Below Ground Level
Supply of 180 dia .OD PVC casing pipes as per ISI specification.
Supply and delivery of 2.00H.P Single phase Sub mercible Set 20 ipm x 125m head with ISI Mark
2.00 Hp Panel Board
2.50sq.mm sub-flat cable
32 mm Upvc pipe 28kg/cm2
32mm M.S Clamp Set
Labour charges for erection of 2.00H.P. Submersible pumpset &commisoning charges.
Labour charges for panel board to borewell cable line trench work in all soil earth work
Labour charges for EB Wiring from panel board to EB to Post
Supply& Delivery of E.B electrical materials
Supply& Delivery of PVC& G.I specials etc.
Provision for EB deposit
Labour charges for fixing of HDPE Tank with Inlet and Outlet Pipe Connetions
Construction of Brick Masonry Pedastal in Cm 1:5 for Fixing of HD PE Tank
Supply and delivery and fixing of HDPE tank as per IS 12701 / 1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges etc., (500 Ltr)
Cost of 40mm OD GI pipe
Cost of 20mm OD GI pipe
Cost of 15mm Brass Tap
Cost of 50mm OD pvc pipe 6kg/m2
Earth work excavation for All Classes of Soil as per Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil.SS20B
Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling with excavated sand complying with standard specification for filling in foundation and basement
Provision for name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
JEGA KIRUBHA SAMUTHIRAN (BID ID -1291589)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .