Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.2 L+₹93,508.94 (6.57%)Rejected-Finance 3 178 KERALA INDIA | PALAKKAD | KERALA | 678001 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L6 | |
| 4 | Rejected-Technical | - | Rejected-Technical L3 | |
| 5 | Rejected-Technical | - | Rejected-Technical L4 |
| Sl No | Description | Qty | Unit | v c jose L8 | Saji Jose L7 | MUHAMMED SHAFI K P L4 | Rasheed L2 | Highland Builders and Developers LLP L3 | SURESH.S L5 | RASAL SALEEM L1 | ARUN GOPAL L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00BUILDING WORK | |||||||||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.61 | cum | 500 ₹306 Lowest | 3,163 ₹1,935.76 | 3,136.61 ₹1,919.61 | 3,018.57 ₹1,847.36 | 3,082.64 ₹1,886.58 | 3,150 ₹1,927.8 | 2,860 ₹1,750.32 | 3,169 ₹1,939.43 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 97.92 | sqm | 720 ₹70,502.4 Lowest | 867 ₹84,896.64 | 861.52 ₹84,360.04 | 829.1 ₹81,185.47 | 846.7 ₹82,908.86 | 870 ₹85,190.4 | 778 ₹76,181.76 | 870 ₹85,190.4 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 93.2 | sqm | 700 ₹65,240 | 657 ₹61,232.4 | 651.66 ₹60,734.71 | 627.14 ₹58,449.45 | 640.46 ₹59,690.87 | 650 ₹60,580 | 589 ₹54,894.8 Lowest | 658 ₹61,325.6 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 211.63 | sqm | 880 ₹1,86,237.04 | 828 ₹1,75,232.12 | 821.11 ₹1,73,773.97 | 790.2 ₹1,67,232.4 | 806.99 ₹1,70,785.71 | 850 ₹1,79,888.05 | 741.5 ₹1,56,925.87 Lowest | 829 ₹1,75,443.76 |
| 1.00 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 67.8 | metre | 800 ₹54,240 | 197 ₹13,356.6 | 194.87 ₹13,212.19 | 187.54 ₹12,715.21 | 191.52 ₹12,985.06 | 200 ₹13,560 | 176 ₹11,932.8 Lowest | 196 ₹13,288.8 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 4,567.7 | kilogram | 103 ₹4,70,473.2 | 96.85 ₹4,42,381.84 | 96.04 ₹4,38,682 | 92.43 ₹4,22,192.6 | 94.38 ₹4,31,099.62 | 95 ₹4,33,931.6 | 86.7 ₹3,96,019.68 Lowest | 96 ₹4,38,499.3 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.18 | cum | 10,500 ₹96,390 | 11,004 ₹1,01,016.72 | 10,910.27 ₹1,00,156.28 | 10,499.67 ₹96,386.97 | 10,722.58 ₹98,433.28 | 11,000 ₹1,00,980 | 9,853 ₹90,450.54 Lowest | 11,027 ₹1,01,227.86 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 41.53 | cum | 11,500 ₹4,77,583.5 | 11,581 ₹4,80,947.35 | 11,482.58 ₹4,76,860.06 | 11,050.44 ₹4,58,913.72 | 11,284.24 ₹4,68,623.2 | 11,500 ₹4,77,583.5 | 10,369.6 ₹4,30,639.12 Lowest | 11,605 ₹4,81,944.05 |
| 1.01 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 31.35 | sqm | 730 ₹22,885.5 | 711 ₹22,289.85 | 704.56 ₹22,087.96 | 678.04 ₹21,256.55 | 692.45 ₹21,708.31 | 700 ₹21,945 | 637 ₹19,969.95 Lowest | 711 ₹22,289.85 |
Tender Value
₹16.9 L
EMD Value
₹42,365
Closing Date
30 Jun 2026, 5:00 pmClosed
Asst.Executive Engineer
LID and EW Division Kozhikkode
Building
2026_LSGD_857276_1
TA/LSGD/KKD/55/2026-27
Open Tender
Civil Works - Buildings
Item Rate
300 days
Kodenchery
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹42,365
Yes
6 Oct 2026
23 Jun 2026
2 Jul 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BUILDING WORK | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.002 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
| 1.003 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.004 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 0.2 | sqm | - | - |
| 1.005 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 1 | metre | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.4 | kilogram | - | - |
| 1.007 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.008 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 1.009 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | - | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1449142.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1449142.xls
BOQ • 0.23 MB
newtenderconditions.pdf
Additional Documents • 0.30 MB
SBD.pdf
Tender Documents • 1.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .