Tender Value
₹78.9 L
EMD Value
₹2.0 L
Closing Date
7 Oct 2026, 11:00 am
SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada -520007 (A.P.)
As per Tender document
2026_ASI_926506_1
26/NIT/2026-27/AMT/Kadapa
Open Tender
Civil Works
Works
180 days
Pushpagiri, Kadapa
As per Tender document
3 documents required · 3 mandatory
₹0
₹2.0 L
Yes
17 Sept 2026
17 Sept 2026
8 Oct 2026
17 Sept 2026
7 Oct 2026
17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Careful removal of roof concrete over the terrace of Mandapa of the temple and including disposing the waste away from the monument, cost, conveyance, loading and unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by Engineer-in-charge. | 80.17 | Cu.m | 1 | ₹80.17 |
| 2 | Careful removal of roof slabs and broken beams of the temple Mandapa using chain pulley or Hydraulic crane and stacking the useful slabs at the site and disposing the broken and waste materials away from the monument including cost, conveyance, loading and unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by Engineer-in-charge.. | 8.73 | Cu.m | 1 | ₹8.73 |
| 3 | Careful erection of new dressed granite stone beams of size 3.45x0.45x0.30m in place of broken beams of the Mandapa using chain pulley or Hydraulic crane including cost, conveyance, loading and unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by Engineer-in-charge.. | 2 | EACH | 1 | ₹2 |
| 4 | Careful re-erection of dismantled roof slabs of the Mandapa over the newly erected beams and replacing the broken roof slabs if any during dismantling with new dressed Kadapa stone slabs of average size (2.0 to 2.5m length x 0.45 to 0.6m width and a thickness of not less than 0.10m) using chain pulley or Hydraulic crane including cost, conveyance, loading and unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by Engineer-in-charge. | 7.8 | Cu.m | 1 | ₹7.8 |
| 5 | Careful re-erection of dismantled roof slabs of the Mandapa over the newly erected beams and replacing the broken roof slabs if any during dismantling with new dressed Kadapa stone slabs of average size (2.0 to 2.5m length x 0.45 to 0.6m width and a thickness of not less than 0.10m) using chain pulley or Hydraulic crane including cost, conveyance, loading and unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by Engineer-in-charge. | 80.17 | Cu.m | 1 | ₹80.17 |
| 6 | 20mm thick plastering the top with Lime mortar (1:2) over which laying one course of flat Clay tiles of size 150x150x16 mm including cost, conveyance, loading and unloading of all materials, labour charges, GST and all other applicable taxes etc. Complete as directed by Engineer-in-charge. | 267.22 | Sq.m | 1 | ₹267.22 |
| 7 | Stucco lime patch plastering (Base Coat) with Lime Mortar (1:2) 20 mm thick, at damaged locations of the gopuras. Including careful deplastering of the damaged and worn out loose plaster of gopuras and cleaning the dead mortar and setting fallen edges if any in bricks pieces including cost, conveyance, loading and unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by Engineer-in-charge. | 612.56 | Sq.m | 1 | ₹612.56 |
| 8 | Finishing the plaster surface with thin layer of fine plastering (6mm) using special hand grinded lime mortar (1:1) paste for punning/sibara including cost, conveyance, loading and unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by Engineer-in-charge. | 730.01 | Sq.m | 1 | ₹730.01 |
| 9 | Removal of damaged stones and accumulated dumped debris around the Gadhadhara sub shrine for clearing the area and earth work excavation for restoration of the entrance steps leading to the river including conveyance of all the materials, loading and unloading of all materials, labour charges, GST and all other applicable taxes etc., complete as directed by Engineer-in-charge. | 32.07 | Cu.m | 1 | ₹32.07 |
| 10 | Brick jelly lime concrete bed (1lime:2Sand:4brick aggregate of size 40mm) to an average depth of 20cm below the steps of Gadhadhara temple with proper ramming, consolidating etc., including cost, conveyance, loading and unloading of all materials, labour charges, GST and other applicable taxes etc. Complete as directed by Engineer-in-charge. | 1.4 | Cu.m | 1 | ₹1.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 15.68 MB
26cover1.pdf
Tender Documents • 6.05 MB
BOQ_973634.xls
BOQ • 0.33 MB
26signednitdoc.pdf
Additional Documents • 15.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .