Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | -15.01% | ₹4.6 L | L1 | Admitted-Finance |
| 2 | L2₹5.5 LAdmitted-Finance VILL PO HAREKRISHNAPUR PS JALANGI DT MURSHIDABAD | MURSHIDABAD | WEST BENGAL | 700023 | +2.00% | ₹5.5 L | L2 | Admitted-Finance |
| 3 | L3₹5.5 LAdmitted-Finance | +2.40% | ₹5.5 L | L3 | Admitted-Finance |
| 4 | L4₹5.5 LAdmitted-Finance | +2.45% | ₹5.5 L | L4 | Admitted-Finance |
Updated dates
Tender Value
₹5.4 L
EMD Value
₹10,801
Closing Date
1 Jun 2026, 2:00 pmClosed
Executive Engineer
76, Dr. Sundari Mohan Avenue, Kolkata - 700014
Second Gate Construction in the campus of DIET, South 24 Parganas, Joynagar.
2026_WBPWD_5013897_1
01/EE/SOUTH 24 PGS/SS/PWDTE OF 2026-2027
Open Tender
CIVIL WORKS
45 days
DIET, South 24 Parganas, Joynagar.
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,801
9 Jun 2026
11 May 2026
3 Jun 2026
16 May 2026
1 Jun 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
a) In ground floor including roof. | 10.64 | m3 | 447 | ₹4,757.42 | 1 |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m
a) In ground floor including roof. | 1.13 | m3 | 939 | ₹1,056.38 | 2 |
| 3 | Dismantling R.C floor, roof beams etc. Including cutting rods and removing rubbish as directed within a lead of 75 m including stacking of steel bars.
a) In ground floor including roof. | 1.32 | m3 | 1,956 | ₹2,581.92 | 3 |
| 4 | Stripping off worn.out plaster and raking out joints of walls, ceiling etc. Upto any height and in floor including removing rubbish within a lead of 75 mm as directed | 1.8 | m2 | 19 | ₹34.2 | 4 |
| 5 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 10 | m3 | 166 | ₹1,660 | 5 |
| 6 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
a) Depth of excavation not exceeding 1500 mm | 21.17 | %m3 | 11,927 | ₹2,52,494.59 | 6 |
| 7 | Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 150 mm including watering and ramming etc. layer by layer complete.
a) With Earth obtained from excavation of foundation | 10.59 | %m3 | 7,754 | ₹82,076.09 | 7 |
| 8 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). | 112.92 | m2 | 335 | ₹37,828.2 | 8 |
| 9 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand
(a) Single brick flat soling (thickness 75 mm) | 43.08 | m2 | 361 | ₹15,551.88 | 9 |
| 10 | Cement concrete with graded stone ballast (40 mmsize) excluding shutterting | 1.61 | m3 | 5,248.52 | ₹8,444.87 | 10 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
2911.pdf
Tender Documents • 1.21 MB
OtherImportantDocuments.pdf
Other Document • 0.42 MB
BOQ_5081769.xls
BOQ • 0.36 MB
SplTermsConditions.pdf
Additional Documents • 0.63 MB
Download all tender documents and submit your bid