Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.2 LAccepted-Finance BADI BARGICHA ALMORA DISTRICT UTTARAKHAND | ALMORA | UTTARAKHAND | 263601 | ₹57.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹58.4 L+₹1.1 L (1.98%)Accepted-Finance | ₹58.4 L+₹1.1 L (1.98%) | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | Mahesh Chandra Sanwal L1 | Nandan Singh Singwal L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical / manual means in foundation trenches or drains i/c lift upto 1.5 m, i/c disposal of surplus excavated soil within a lead of 50 m. | 234.06 | cum | 190 ₹44,471.4 | 150 ₹35,109 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth
level : 1 :3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.33 | cum | 5,500 ₹40,315 | 3,000 ₹21,990 Lowest |
| 3.00 | P/L in position CC 1:4:8 (1 Cement : 4 c/sand : 8 st. agg. 40 mm size) excluding the cost of c/shuttering - All work upto plinth level. | 29.35 | cum | 5,200 ₹1,52,620 Lowest | 6,231 ₹1,82,879.85 |
| 4.00 | RR stone masonry with hard stone in foundation and plinth i/c levellingup with CC 1:6:12 (1 cement: 6 coarse sand : 12 stone agg. 20mm size) at plinth level with cement mortar 1:6 (1 cement : 6 c/sand). | 4.53 | cum | 4,000 ₹18,120 Lowest | 7,700 ₹34,881 |
| 5.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1.4 | cum | 5,500 ₹7,700 Lowest | 7,586 ₹10,620.4 |
| 6.00 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in cement mortar 1:4 (1 cement : 4 c/sand). foundation and plinth | 11.68 | cum | 5,600 ₹65,408 Lowest | 6,743 ₹78,758.24 |
| 7.00 | P/L in position RCC 1:1.5:3 (1 cement : 1.5 c/sand : 3 stone agg. 20 mm size) ex. the cost of c/shuttering, finishing and reinf. - All work upto plinth level (in foundation). | 48.72 | cum | 7,200 ₹3,50,784 Lowest | 8,275 ₹4,03,158 |
| 8.00 | RCC work 1:1.5:3 (1 cement : 1.5 c/sand :3 stone agg. 20 mm size) in walls (any thickness), plinth and string courses, columns, pillars, piers, abutments, posts & struts etc. upto floor five level ex. cost of c/shuttering, finishing and reinf. | 16.72 | cum | 8,500 ₹1,42,120 Lowest | 9,928 ₹1,65,996.16 |
| 9.00 | Same as above but RCC 1:1.5:3 in beams,lintels,S/S & suspended floors. | 82.08 | cum | 9,500 ₹7,79,760 | 9,154 ₹7,51,360.32 Lowest |
| 10.00 | Centering and shuttering i/c strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 79.23 | sqm | 300 ₹23,769 Lowest | 400 ₹31,692 |
Tender Value
₹79.7 L
EMD Value
₹1.6 L
Closing Date
16 Apr 2026, 3:00 pmClosed
EE RWD ALMORA
EE RWD ALMORA
Honorable Chief Minister Announcement Number 379 2024 The Shiv Temple in Sindhyamalla will be beautified
2026_RES_93722_1
1948 Dated 25-03-2025
Open Tender
Civil Works - Buildings
Item Rate
365 days
Almora
Honorable Chief Minister Announcement Number 379 2024 The Shiv Temple in Sindhyamalla will be beautified
3 documents required · 3 mandatory
₹4,720
EE RWD ALMORA
₹1.6 L
Yes
23 Apr 2026
3 Apr 2026
16 Apr 2026
4 Apr 2026
16 Apr 2026
4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical / manual means in foundation trenches or drains i/c lift upto 1.5 m, i/c disposal of surplus excavated soil within a lead of 50 m. | - | cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth
level : 1 :3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 3 | P/L in position CC 1:4:8 (1 Cement : 4 c/sand : 8 st. agg. 40 mm size) excluding the cost of c/shuttering - All work upto plinth level. | - | cum | - | - |
| 4 | RR stone masonry with hard stone in foundation and plinth i/c levellingup with CC 1:6:12 (1 cement: 6 coarse sand : 12 stone agg. 20mm size) at plinth level with cement mortar 1:6 (1 cement : 6 c/sand). | - | cum | - | - |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 6 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in cement mortar 1:4 (1 cement : 4 c/sand). foundation and plinth | - | cum | - | - |
| 7 | P/L in position RCC 1:1.5:3 (1 cement : 1.5 c/sand : 3 stone agg. 20 mm size) ex. the cost of c/shuttering, finishing and reinf. - All work upto plinth level (in foundation). | - | cum | - | - |
| 8 | RCC work 1:1.5:3 (1 cement : 1.5 c/sand :3 stone agg. 20 mm size) in walls (any thickness), plinth and string courses, columns, pillars, piers, abutments, posts & struts etc. upto floor five level ex. cost of c/shuttering, finishing and reinf. | - | cum | - | - |
| 9 | Same as above but RCC 1:1.5:3 in beams,lintels,S/S & suspended floors. | - | cum | - | - |
| 10 | Centering and shuttering i/c strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_110932.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
Tendernotice_2.pdf
PDF • 3.88 MB
BOQ_110932.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .