Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.2 LAccepted-Finance BADI BARGICHA ALMORA DISTRICT UTTARAKHAND | ALMORA | UTTARAKHAND | 263601 | ₹57.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹58.4 LAccepted-Finance | ₹58.4 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | Mahesh Chandra Sanwal L1 | Nandan Singh Singwal L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical / manual means in foundation trenches or drains i/c lift upto 1.5 m, i/c disposal of surplus excavated soil within a lead of 50 m. | 234.06 | cum | 190 ₹44,471.40 | 150 ₹35,109 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth
level : 1 :3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.33 | cum | 5,500 ₹40,315 | 3,000 ₹21,990 |
| 3.00 | P/L in position CC 1:4:8 (1 Cement : 4 c/sand : 8 st. agg. 40 mm size) excluding the cost of c/shuttering - All work upto plinth level. | 29.35 | cum | 5,200 ₹1.5 L | 6,231 ₹1.8 L |
| 4.00 | RR stone masonry with hard stone in foundation and plinth i/c levellingup with CC 1:6:12 (1 cement: 6 coarse sand : 12 stone agg. 20mm size) at plinth level with cement mortar 1:6 (1 cement : 6 c/sand). | 4.53 | cum | 4,000 ₹18,120 | 7,700 ₹34,881 |
| 5.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1.4 | cum | 5,500 ₹7,700 | 7,586 ₹10,620.40 |
| 6.00 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in cement mortar 1:4 (1 cement : 4 c/sand). foundation and plinth | 11.68 | cum | 5,600 ₹65,408 | 6,743 ₹78,758.24 |
| 7.00 | P/L in position RCC 1:1.5:3 (1 cement : 1.5 c/sand : 3 stone agg. 20 mm size) ex. the cost of c/shuttering, finishing and reinf. - All work upto plinth level (in foundation). | 48.72 | cum | 7,200 ₹3.5 L | 8,275 ₹4.0 L |
| 8.00 | RCC work 1:1.5:3 (1 cement : 1.5 c/sand :3 stone agg. 20 mm size) in walls (any thickness), plinth and string courses, columns, pillars, piers, abutments, posts & struts etc. upto floor five level ex. cost of c/shuttering, finishing and reinf. | 16.72 | cum | 8,500 ₹1.4 L | 9,928 ₹1.7 L |
| 9.00 | Same as above but RCC 1:1.5:3 in beams,lintels,S/S & suspended floors. | 82.08 | cum | 9,500 ₹7.8 L | 9,154 ₹7.5 L |
| 10.00 | Centering and shuttering i/c strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 79.23 | sqm | 300 ₹23,769 | 400 ₹31,692 |
Tender Value
₹79.7 L
EMD Value
₹1.6 L
Closing Date
16 Apr 2026, 3:00 pmClosed
EE RWD ALMORA
EE RWD ALMORA
Honorable Chief Minister Announcement Number 379 2024 The Shiv Temple in Sindhyamalla will be beautified
2026_RES_93722_1
1948 Dated 25-03-2025
Open Tender
Civil Works - Buildings
365 days
Almora
Honorable Chief Minister Announcement Number 379 2024 The Shiv Temple in Sindhyamalla will be beautified
3 documents required · 3 mandatory
₹4,720
EE RWD ALMORA
₹1.6 L
Yes
23 Apr 2026
3 Apr 2026
16 Apr 2026
4 Apr 2026
16 Apr 2026
4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical / manual means in foundation trenches or drains i/c lift upto 1.5 m, i/c disposal of surplus excavated soil within a lead of 50 m. | - | cum | - | - | 1 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth
level : 1 :3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - | 2 |
| 3 | P/L in position CC 1:4:8 (1 Cement : 4 c/sand : 8 st. agg. 40 mm size) excluding the cost of c/shuttering - All work upto plinth level. | - | cum | - | - | 3 |
| 4 | RR stone masonry with hard stone in foundation and plinth i/c levellingup with CC 1:6:12 (1 cement: 6 coarse sand : 12 stone agg. 20mm size) at plinth level with cement mortar 1:6 (1 cement : 6 c/sand). | - | cum | - | - | 4 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - | 5 |
| 6 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in cement mortar 1:4 (1 cement : 4 c/sand). foundation and plinth | - | cum | - | - | 6 |
| 7 | P/L in position RCC 1:1.5:3 (1 cement : 1.5 c/sand : 3 stone agg. 20 mm size) ex. the cost of c/shuttering, finishing and reinf. - All work upto plinth level (in foundation). | - | cum | - | - | 7 |
| 8 | RCC work 1:1.5:3 (1 cement : 1.5 c/sand :3 stone agg. 20 mm size) in walls (any thickness), plinth and string courses, columns, pillars, piers, abutments, posts & struts etc. upto floor five level ex. cost of c/shuttering, finishing and reinf. | - | cum | - | - | 8 |
| 9 | Same as above but RCC 1:1.5:3 in beams,lintels,S/S & suspended floors. | - | cum | - | - | 9 |
| 10 | Centering and shuttering i/c strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | - | sqm | - | - | 10 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_110932.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
Tendernotice_2.pdf
PDF • 3.88 MB
BOQ_110932.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid