Loading…
Loading…
Tender Value
₹5.5 Cr
EMD Value
₹17.3 L
Closing Date
27 Jul 2026, 12:00 pm
Chief Engineer
L.D.A. Gomti Nagar, Lucknow
Jankipuram yojna, Sector-J (Extension) Sargam apartment, sulabh awas ke samney samudayik kendra ka nirman karya.
2026_LDAUP_1165185_1
59/E-NIVIDA/C.E./2026-27/3
Open Tender
Civil Works
270 days
L.D.A. Gomti Nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,366
Secretary, L.D.A.
₹17.3 L
1 Jul 2026
1 Jul 2026
28 Jul 2026
1 Jul 2026
27 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge., All kinds of soil DSR 2023- 2.6.1 | 0.6 | Cum | 140.22 | ₹83.99 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. DSR 2023- 2.27 | 1 | Cum | 845 | ₹844.16 |
| 3 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift upto1.5 m., All kinds of soil. DSR 2023- 2.28.1 | - | Sqm | 26.97 | - |
| 4 | Supplying chemical emulsion in sealed containers including delivery as specified., Chlorpyriphos/ Lindane emulsifiable concentrate of 20% DSR 2023- 2.34.1 | - | Ltr | 185.44 | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). DSR 2023- 4.1.8 | 0.8 | Cum | 5,381.16 | ₹4,299.55 |
| 6 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement, All works upto plinth level, Concrete of M25 grade with minimum cement content of 330 kg /cum DSR 2023- 5.33.1.1 | 0.4 | Cum | 7,508.31 | ₹2,995.82 |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement, All works above plinth level upto floor V level, Concrete of M25 grade with minimum cement content of 330 kg /cum DSR 2023- 5.33.2.1 | - | Cum | 7,789.26 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :, Centering and shuttering including strutting and propping and removal of items for: Foundations, footings, base of columns, etc DSR 2023/5.9.1 | 1 | Sqm | 309.78 | ₹309.47 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for :, Suspended floors, roofs, landings, balconies and access platform DSR 2023- 5.9.3 | 0.8 | Sqm | 732.48 | ₹585.25 |
| 10 | Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc., including cost of de-shuttering and decentering at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be measured)., Suspended floors, roofs, landing, beams and balconies (Plan area to be measured) DSR 2023- 5.11.1 | - | Sqm | 303.58 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.25 MB
BOQ_2185351.xls
BOQ • 0.45 MB
TENDER.pdf
Tender Documents • 5.86 MB
Download all tender documents and submit your bid