Tender Value
₹35.6 L
EMD Value
₹50,000
Closing Date
10 Aug 2026, 5:00 pmClosed
Assistant Executive Engineer
220 kV Substation Sub Division, Pattoor P.O, Edappon
Capital Work of 220 kV Substation, Edappon, Erection of 3 Nos. 20 MVA, 110/11 kV Transformers and associated bay equipment/panels by dismantling 2 Nos. existing 63 MVA, 110/66 kV Transformers and 3 Nos. existing 10 MVA, 66/11 kV Transformers.
2026_KSEB_862423_1
01/AEE/SSSDE/26-27/25.07.2026
Open Tender
Electrical Works
Percentage
60 days
220 kV Substation, Patoor P.O, Edappon
7 documents required · 7 mandatory
₹5,900
₹50,000
31 Aug 2026
30 Jul 2026
13 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
30 Jul 2026 - 10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size(cost index(c) : 1.4445 included in Rate) | 26.91 | cub.m | 10,488.77 | ₹2,82,252.92 |
| 2 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete(cost index(c) : 1.4445 included in Rate) | 190 | sq.m | 386.16 | ₹73,370.06 |
| 3 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more(cost index(c) : 1.4445 included in Rate) | 2,880 | kg | 112.43 | ₹3,23,785.15 |
| 4 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil(cost index(c) : 1.4445 included in Rate) | 75 | cub.m | 359.74 | ₹26,980.37 |
| 5 | 2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil(cost index(c) : 1.4445 included in Rate) | 2.73 | cub.m | 131.02 | ₹357.67 |
| 6 | 4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)(cost index(c) : 1.4445 included in Rate) | 0.85 | cub.m | 8,364.58 | ₹7,109.89 |
| 7 | 14.25 : Brick work with common burnt clay bricks of class designation 7.5 in mud mortar .(cost index(c) : 1.4445 included in Rate) | 8.37 | cub.m | 7,148.56 | ₹59,833.41 |
| 8 | 13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)(cost index(c) : 1.4445 included in Rate) | 170 | sq.m | 369.76 | ₹62,859.73 |
| 9 | 2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.(cost index(c) : 1.4445 included in Rate) | 69.34 | cub.m | 318.45 | ₹22,081.64 |
| 10 | 13.43.1 : Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer(cost index(c) : 1.4445 included in Rate) | 205 | sq.m | 80.85 | ₹16,573.98 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1458616.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_1458616.xls
BOQ • 0.46 MB
generaltermsandconditions.pdf
Tender Documents • 0.83 MB
volIGCC.pdf
Tender Documents • 1.33 MB
volIIItechnicalspecification.pdf
Tender Documents • 1.19 MB
volIIspecialconditions.pdf
Tender Documents • 0.67 MB
boundenagreement.pdf
Tender Documents • 0.43 MB
gstnominationdeclaration.pdf
Tender Documents • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .