| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr Quoted ₹15.5 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.8 Cr+₹1.6 Cr (1053.9%)Rejected-AOC BIKANER ROAD SURATGARH 335804 | GANGANAGAR | RAJASTHAN | 335804 | ₹1.8 Cr+₹1.6 Cr (1053.9%) | L2 | Rejected-AOC L2 Bidder |
| 3 | L3₹2.3 Cr+₹2.1 Cr (1376.4%)Rejected-AOC 1ST FLOOR CHITRAKOOT 230A A J C BOSE ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | ₹2.3 Cr+₹2.1 Cr (1376.4%) | L3 | Rejected-AOC L3 Bidder |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
16 Dec 2020, 1:00 pmClosed
XEN CI-II
XEN CI-II DCRTPP YamunaNagar
AMC of preventive routine breakdown maintenance of C and I system Equipments for Boiler turbine and balance of plant installed at 2x300 MW DCRTPP HPGCL Yamuna Nagar
2020_HBC_149773_1
01/DCRTPP/CI-II/F-491/2020-21
Open Tender
Power/Energy Projects/Products
Works
730 days
DCRTPP YamunaNagar
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,180
₹2.9 L
Yes
13 Apr 2021
4 Nov 2020
18 Dec 2020
4 Nov 2020
16 Dec 2020
4 Nov 2020
PART A The contractor shall deploy the following minimum man power to carry out routine /breakdown Mtc as enlisted below during working hours or at odd hours, including holidays: 02 Supervisors (Highly Skilled) - Degree holder in C&I/Electrical/Electronics/Similar field with minimum experience of three years 08 nos. Diploma Holders (Highly Skilled) –Diploma holders in electrical/Electronics/Similar field with minimum 3 year experience 16 nos.Electrician/Technicians(Skilled B) – ITI in in C&I/Electrical/Electronics/Similar field with minimum 2 year experience 02 Nos of Welders (Skilled B)- ITI in welder trade with minimum 2 year of experience in welding field. 08 nos. Unskilled labor (Unskilled). The above is the minimum manpower which the contractor has to supply for executing the below listed works round the clock in Unit-1&2. However the manpower may be increased depending upon the quantum of work or as per the direction of Engineer In Charge. 1. Round the clock Routine/Preventive/Breakdown Maintenance of 32 nos. HEA Ignitors & 80 nos. Flame scanners. 120 nos. SADC’s, installed in Unit 1 & 2, ( on fortnightly basis as preventive Maintenance and in addition as per the Requirement). 2.Cleaning of PKS/FSC/DEH/VMS Operator & Engineering Workstations (38 nos.), Server Stations with PC (6nos.), Auto Tube Leakage Detection Station (2nos.), Printers (24 Nos.) along with tables, Control Panels in the DCS room (approx. 200nos.), Annunciation Panels (6 nos.), Large Video Screens (4nos.) 3. Cleaning of panels installed at various sites (100nos.), Protection Boxes(380nos.) various junction boxes (Approx. 100 nos.) of Unit l &2 on fortnightly basis. 4. Round the clock Routine/Preventive/Breakdown maintenance of Pneumatic Actuators (Installed at various locations in the main plant & off sites) along with its accessories like Smart/ conventional Petitioners, I IP converters, Air Filter Regulators, Air Lock Relays Solenoid valves, Copper/ SS tubing, Limit Switches, position feedback transmitter & I/P converters. Etc The total no of installed pneumatic actuators is approximately 400 nos. in Unit-1&2. 5. Round the clock Routine /Preventive/Breakdown maintenance of Wall & APH Soot Blowers (250 nos.appox.) installed Unit 1&2 which also includes Electrical Control Panel & accessories. 6. Round the clock Routine/Preventive/Breakdown maintenance of Motorized Regulating Adjustable Actuators (approx. 200 nos) in Unit- 1 & 2. 7. Round the clok Routine Cleaning of Oxygen analyser (8 nos), SOX- NOX Analysers (2 Nos), CO Analysers (2 Nos) & Opacity Monitors ( 8 nos) installed at various sites of Unit-1 & 2.
PART B Removal & Installation of Pneumatic Actuators (Power Cylinder etc including Transporation within Plant Premises.
Complete Servicing of Pneumatic Actuators (Diaphragm Operated or Power Cylinder or Solenoid operated.
Calibration of Pneumatic Damper/ Control Valve/ Motorized Regulating Actuator
Removal & Installation of Motorized Regulating & adjustable actuators Including transportation within plant Premises.
Complete Servicing of Motorized Regulating & adjustable Actuator
Calibration of RC Feeders including Opening/closing of side gates
Laying, testing & Termination of Cables Cable Size: 0.5X1 pair to 0.5X8 pair (mtr)
Laying, testing & Termination of Cables Cable Size: 0.5X9 pair to 0.5X16 pair (mtr)
Laying, testing & Termination of Cables Cable Size: 1.5X4 cores to 1.5 X16 core (mtr)
Laying, testing & Termination of Cables Cable Size: 1.5 X17 cores to 1.5 X24 core (mtr)
Laying, testing & Termination of Cables Cable Size: 2.5X4 core (mtr)
Dismantling & Proper reinstallation of Equipments viz. Transmitters. Switches, Guages. Sensors, Vibration, Probes, Indicators, I/P Converter, Solenoid Valves Etc. including transportation
Calibration/Servicing of Equipment viz.Transmitters, Switches, Guages, Sensors,Vibration Probes, Indicator, I/P Converter, Smart Petitioners etc. including transportation.
Removal/Reinstallation of Analytical Instruments e.g. PH, Conductivity, Chlorine,Oxygen, Co, Opacity Sox-Nox Hydrastep Electrode, Camera, Sonic Probe etc.
Cleaning/Servicing of Pneumatic Accessories Like positioners, Air Lock Relay, Air Filter Regulator, Solenoid Valve, Position Feedback Transmitters etc.
Removal/Servicing/Reinstallation of Scanners/Ignitor
Cleaning of UPS Panel along with Connection tightening & contacts cleaning Of Battery bank terminals.(set)
Cleaning of Choked Scanner guide pipe
Removal, Servicing & Re installation Of Corner Valves.
Jointing of Fibre Optical cable
Fabrication of FTE cable/Crimping Communication port.
Cleaning/Flushing of Impulse lines including cutting if required) which also involves dismantling & normalizing the lines after flushing and arresting of leakages if any.
Arresting leakages from the fittings of the valve manifolds/level switches/Transmitters/flow switches, impulse Lines etc.
Repair/welding in the impulse lineThermo well stubs & joints in case Of leakages, replacing of drain/isolating/Manifold valves etc (HP lines)
Repair/Welding in the impulse line,Thermo well stubs & joints in case Of leakages, replanning of draing/isolating/manifold valves etc (LP lines)
Replacement of impulse lines by providing proper hangers/support.(mtr)
Any alteration, fabrication of structure, platform, canopies etc.(tonnes)
Cleaning of flow sensing elements (aerofoil) of PA flow measurement in the air duct.
Cleaning of CW flow/ secondary air flow sensing element (anubar) in CW duct/ secondary air duct resp.
Supply of skilled manpower
Supply of unskilled labour
Supply of IBR Certified high Pressure welder
Supply of Painter
Cable tray lying Up to 50mm (meter)
Cable tray lying From 100 to 200 mm (meter)
Cable tray lying 300 mm and above (meter)
Tasting and Replacement of Soot Blowers Motor
Testing and replacement of Soot Blowers Rotary limit switches
Servicing/replacement of Soot Blowers Contactor assembly
middha enterprises
CHOPRA ENGINEERING WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .