Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-AOC ALOOR THAYALTHOTTY HOUSE MULIYAR | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.8 L+₹29,418 (1.68%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹18.0 L+₹42,517 (2.42%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | ABDULLA A T L1 | ANANDAN T L3 | ABDUL NAVAS BM L2 |
|---|---|---|---|---|---|---|
| 1.00Road Retaaring and Improvements | ||||||
| 1.00 | 3.15.2:Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 208.24 | cum | 53.41 ₹11,122.1 Lowest | 55.58 ₹11,573.98 | 54.31 ₹11,309.51 |
| 1.00 | 4.11.1:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br> (i) Using naturally occuring gravel | 12 | cum | 1,941.89 ₹23,302.68 Lowest | 1,988.93 ₹23,867.16 | 1,974.49 ₹23,693.88 |
| 1.00 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 14.4 | cum | 54.65 ₹786.96 Lowest | 56.03 ₹806.83 | 55.57 ₹800.21 |
| 1.00 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5) | 34.59 | cum | 6,852.94 ₹2,37,043.19 Lowest | 7,017.68 ₹2,42,741.55 | 6,967.55 ₹2,41,007.55 |
| 1.00 | 3.4:Construction of Embankment with Material Obtained from Borrow Pits <br> Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 60 | cum | 515.33 ₹30,919.8 Lowest | 527.74 ₹31,664.4 | 523.72 ₹31,423.2 |
| 1.01 | 5.5.A.1a:Modified Penetration Macadam 50 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 60.21 | sqm | 248.43 ₹14,957.97 Lowest | 254.48 ₹15,322.24 | 252.6 ₹15,209.05 |
| 1.01 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | 61.3 | sqm | 321.72 ₹19,721.44 Lowest | 329.51 ₹20,198.96 | 327.12 ₹20,052.46 |
| 1.01 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 18 | cum | 2,924.77 ₹52,645.86 Lowest | 2,995.09 ₹53,911.62 | 2,973.86 ₹53,529.48 |
| 1.01 | 5.1.1a:Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 120 | sqm | 62.85 ₹7,542 Lowest | 64.4 ₹7,728 | 63.91 ₹7,669.2 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
29 Sept 2025, 5:00 pmClosed
AE LID AND EW BEDADUKA GP
AE LID AND EW BEDADUKA GP
BEDADUKKA GP PRO NO 79 2025 26 MARUTHADUKKAM KOLLARAMKODU ROAD IMPROVEMENT
2025_LSGD_800107_1
05 AE LID AND EW BDKA PHASE V
Open Tender
Civil Works - Roads
Item Rate
Bedadukka GP
please refer Tender Documents
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
17 Oct 2025
20 Sept 2025
3 Oct 2025
20 Sept 2025
29 Sept 2025
20 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1327171.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .