| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27,688Accepted-AOC | 1 | Accepted-AOC L1 |
Tender Value
Refer Docs
Closing Date
25 Mar 2023, 5:00 pmClosed
Assistant Executive Engineer KRP Sub Division
O/o oAssistant Executive Engineer KRP Sub Division No II Vazhavatta
GENERAL-KRP-Providing covering slab on both ends of cross drain at Adivaram Junction of Karapuzha-Ambalavayal road.-General Civil Work
2023_Irrig_567975_1
IRR/PI/TR/8237/2022_5_11_10/1
Open Tender
Civil Works - Others
Item Rate
30 days
Adivaram
Please refer Tender documents.
8 documents required · 8 mandatory
₹335
Yes
1 Mar 2024
20 Mar 2023
28 Mar 2023
20 Mar 2023
25 Mar 2023
20 Mar 2023
Amount
Detailed Estimate
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
26.28.1:Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge75mm average thickness
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
13.62.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture .
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Bidder Name
GOPALAN K V
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_838224.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .