| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC JATANBARI KARBOK GOMATI TRIPURA | ₹3.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 Cr+₹26.4 L (8.60%)Rejected-Finance | ₹3.3 Cr+₹26.4 L (8.60%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.4 Cr+₹30.5 L (9.92%)Rejected-Finance JOGENDRA NAGAR AGARTALA WEST TRIPURA | AGARTALA | WEST TRIPURA | TRIPURA | ₹3.4 Cr+₹30.5 L (9.92%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.7 Cr+₹61.9 L (20.1%)Rejected-Finance COLLEGE CHOWMUHANI JIRANIA WEST TRIPURA | ₹3.7 Cr+₹61.9 L (20.1%) | L4 | Rejected-Finance L4 |
| 5 | L5₹4.4 Cr+₹1.3 Cr (43.4%)Rejected-Finance | ₹4.4 Cr+₹1.3 Cr (43.4%) | L5 | Rejected-Finance L5 |
Tender Value
₹3.2 Cr
EMD Value
₹6.4 L
Closing Date
19 Dec 2022, 5:00 pmClosed
DGM Kanchanpur Electrical Division
Office of the DGM Kanchanpur Electrical Division
Construction of 11 KVLT line Distribution Sub Station for providing domestic Service connection to 1000 Nos Bru Family at Gachiram Parra Naising Parra under Dasda R.D. Block Phase-I Extension of 11 kv LT line and Distribution Transformer Phase
2022_POWER_34495_1
NIeT No DGM/ED-KCP/22-23/ 03
Open Tender
Electrical Works
Turn-key
365 days
Dasda Kanchanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹6.4 L
Yes
O/O Additional General Manager (DP and C) TSECL
27 Feb 2023
28 Nov 2022
20 Dec 2022
28 Nov 2022
19 Dec 2022
4 Dec 2022
28 Nov 2022 - 3 Dec 2022
3 Dec 2022
Amount
Supply of line materials
Transformer 100 KVA 11/0.4kv (2/1971)
9 mtr. Long Galvonised Steel Tubular Pole
8mtr. Long Galvonised Steel Tubular Pole
Galvonized Stay set complete HT 20SQ MM
Galvonized Stay set complete HT 16 SQ MM
G.I. stay wire 7/2.5 mm
Stay insulator (21/1981)
L.T stay Insulator (21/1981)
11KV Polymer composite 45 KN Disc insulator
11KV Disc fittings 6/1/3.35
11KV 320mm CD Polymer composite Pin insulator
11KV G.O.switch (3 phase Polymeric type)
11kv D.O.fuse (3 phase Polymeric type)
11KV Polimeric Lightning arrester (9 KV, 5 KA)
Galvonized Channel (100x50x50x6mm)
Galvonized Channel (75x40x40x6mm)
Galvonized angle cross-arm (65x65x6mm)
Galvonized angle cross-arm (50x50x6mm)
Galvonized clamp 50x6mm
ACSR 6/1/2.59mm
10 SWG G.I. wire
Galvonized Nuts & Bolts (Asorted size)
LT Aerial Bunched Cable (Relimac/Gensceb/Gupta Power/Raychem R.P.G. pvt. Ltd. Make) (3x50x1x16 +1x35 sqmm)
LT Aerial Bunched Cable (Relimac/Gensceb/Gupta Power/Raychem R.P.G. pvt. Ltd. Make) (1x50x1x16 +1x35 sqmm)
Suspension Clamp Assembly with Straps & Buckle (35-50mm)
Dead end Clamp Assembly with Straps & Buckle (35-50mm)
Service Anchor Clamp (18-50mm)
Insulation piercing connector main 16mm & Tap 4 to 35(50) sq. Mm.
Cable end cap
Cable ties
Eye hook (25mm)
Distribution Box three phase 25-50mm with pole brackets or steel straps & buckles for fittings fixing on pole top.
Distribution Box Single phase 25-50mm with pole brackets or steel straps & buckles for fittings fixing on pole top.
Supply of Febricated Galvonized Pole clamp
Danger plate for 11kv (57/1988)
L.T Danger Plate(57/1988)
Barbed wire for anti climbing device
PVC cable 120 sq mm
Cut out 300 Amps
Bimetallic Lugs (120 sqmm.)
Earthing pipe ( 2.5 mtr long 40mm dia G.I.pipe)
Supply of 55 Kg Charcoal & 60 Kg Salt (For 1 pit)
Service connection
Single Core 2.5mm PVC cable for Service Connection
G.I. Wire 10SWG (for Service Connection)
Reel Insulator
Single Phase Energy Meter
16 Amps. ICDP Main Switch/ Main Switch make baba
8"x12" Wooden Board
4"x4" Wooden Board
5 Amps. Switch
5 Amps. Angle Holder
CFL lamp
Wooden Batton 1" (5 Mtr Lumpsum)
Wooden Plank etc. as required 10" (1 Mtr Lumpsum)
1.5 sq.mm PVC Wire (Single Core 650 Volt grade) with link clip & nails as required
5-pin socket
Supply of 3-phase LT line materials
9.0 mtr. Long Galvonised Steel Tubular Pole
8.0 mtr. Long Galvonised Steel Tubular Pole
Transformer 100 KVA 11/0.4kv (2/1971)
Galvonized Channel cross-arm (100x50x50x6mm) 2.8 mtr long.
Galvonized channel cross-arm (100x50x50x6mm) 0.8 mtr. Long
Galvonized Channel cross-arm (75x40x40x6mm) 2.8 mtr long
Galvonized angle cross-arm (65x65x6mm) 2.8mtr. Long
Galvonized Cross arms made of 75 x 40 x 40 x 6 mm Channel for Single pole top bracket 0.3 mtr. Long
Galvonized Cross arms made of 75 x 40 x 40 x 6 mm Channel for Single pole bottom bracket 1.3 mtr. Long
Galvonized Cross arms made of 75 x 40 x 40 x 6 mm Channel for Double pole/ tapping cross-arm 2.20 mtr. Long
Galvonized Channel cross-arm (75x40x40x6mm) 2.2 mtr long for line GO & DO
Galvonized .angle cross-arm (65x65x6mm) 2.2 mtr. Long for line GO handle.
Galvonized protective guard bracket 1.5 mtr. Long by 65x65x6 mm angle for Single pole .
Galvonized double pole guard bracket, 2.5 mtr. Long by 65x65x6mm angle for double pole
Erection of 0.55 mtrs long 50x50x6mm Galvonized angle at existing 11KV line
Erection of Galvonized stay set direct in earth in normal soil for 11kv line
11KV Polymer composite 45 KN Disc insulator with fitting
11KV 320mm CD Polymer composite Pin insulator
11KV G.O.switch (3 phase Polymeric type)
11kv D.O.fuse (3 phase Polymeric type)
11KV Polimeric Lightning arrester (9 KV, 5 KA)
ACSR 6/1/2.59 mm
8 SWG G.I. wire (45/1987)
Cradle guard (11KV)
Transformer 100 KVA 11/0.4kv (2/1971)
Fabrication of chennel / Angle
Erection of Galvonized stay set direct in earth in normal soil for LT line
Erection of Barbed wire for anti-climbing device
Erection of danger plate
Erection of 3X50+1X16+1X35 sq.mm LT AB cable including positioning, laying, hoisting and drawing etc. As required.
Erection of 1X50+1X16+1X35 sq.mm LT AB cable including positioning, laying, hoisting and drawing etc. As required.
Erection of 3 phase LT Distribution Box (inc. Incoming 4C X 25 sq.mm , outgoing 4 Nos 4C X 16 sq.mm Cable
Erection of 1 phase LT Distribution Box (225 X 285 X 120) mm inc. Incoming 2C X 25 sq.mm , outgoing 8 Nos 2C X 10 sq.mm Cable
Erection & fitting fixing of suspension Clamp assembly including pole clamp, eye hook with help of Straps & Buckle (35-50mm)
Erection & fitting fixing of dead end Clamp assembly including pole clamp, eye hook with Straps & Buckle (35-50mm)
Erection & fitting fixing of Insulation piercing connector main 16mm & Tap 4 to 35(50) sq. Mm.
Clearing of Jungle as setisfaction of Engg. In-Charge.
Supply of 1-phase LT line materials
Providing 1-phase Service Connection including Erection, fitting & fixing of supply Materials and equipment..
Supply of service connection
Construction of Sub-station Fencing with barbed wire, errection supply & errection of barbed wire fencing of MS Angle ( 6Nos. 65x65x6mm & 4Nos . 50x50x6 mm) & provision of gate ( to be fabricated by 35x35x6 mm M.S. Angle-20x6mm M.S. Flat ) fixed with supports of fencing belted at top by 35x35x6 mm M.S. Anglethrough out with provision of hings & locking arragement etc. as per approved design & drawing of ED-KCP .
Grouting of Steel Tubular Poles with CC work ratio 1:2:4 (1 Cement :2 River Sand :4 Jhama Brick agreegate of 20 mm normal size ) including supply of Cement, Sand & brick aggregate complete with excavation , refilling of earth , ramming along with centering & shuttering as reqd. (0.275 Cum / Steel Tubular Pole)
NEW SHIVA ENTERPRISE
SUDHANGSHU BHATTACHARJEE
Asish Debnath
THE TRIPURA ELECTRICAL HOUSE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .