Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹63.4 LAdmitted-Finance | -3.00% | ₹63.4 L | L1 | Admitted-Finance |
| 2 | L2₹64.8 L+₹1.5 L (2.32%)Admitted-Finance | -0.75% | ₹64.8 L+₹1.5 L (2.32%) | L2 | Admitted-Finance |
| 3 | L3₹66.0 L+₹2.6 L (4.12%)Admitted-Finance | +1.00% | ₹66.0 L+₹2.6 L (4.12%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Documents not found in order |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Documents not found in order |
Tender Value
₹65.3 L
EMD Value
₹1.3 L
Closing Date
3 Jun 2026, 5:00 pmClosed
Dy Commandant Engineer
Office of DIG SHQ SSB Jalpaiguri
Construction of Chain link fencing with Sentry Post at BOP Diana of 17th BN SSB Falakata under Frontier Siliguri
2026_SSB_910315_1
DC(Engr)/SHQ/JPG/2026-27/06
Open Tender
Civil Works - Others
Percentage
180 days
BOP Diana
As per tender documents
3 documents required · 3 mandatory
₹0
₹1.3 L
9 Jun 2026
26 May 2026
4 Jun 2026
26 May 2026
3 Jun 2026
26 May 2026
26 May 2026 - 3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock | 166 | cum | 726.71 | ₹1,20,633.86 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1.94 | cum | 2,438.36 | ₹4,730.42 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 30.65 | cum | 7,821.13 | ₹2,39,717.63 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-Ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 36.35 | cum | 7,484.27 | ₹2,72,053.21 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts | 16.33 | sqm | 1,103.7 | ₹18,023.42 |
| 6 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 12.5 mm nominal size derived from natural sources) | 1.61 | sqm | 471.72 | ₹759.47 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.81 | cum | 12,460.71 | ₹47,475.31 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 162.2 | sqm | 1,103.7 | ₹1,79,020.14 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 140.22 | kg | 123.83 | ₹17,363.44 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 124.7 | kg | 123.83 | ₹15,441.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
Tendernotice_2.pdf
PDF • 2.42 MB
BOQ_956733.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .