| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC | ₹11.8 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹12.0 LRejected-AOC | ₹12.0 L | L2 | Rejected-AOC HIGHEST BIDDER |
| Sl No | Description | Qty | Unit | NIZAR P L2 | ANWAR V A L1 |
|---|---|---|---|---|---|
| 1.00Improvement works for Interlock tiling entrance road and compound wall work in infront of Type-IV staff quarters building at Thanavu under Olavakkode Range during 2025-2026 | |||||
| 2.00 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and
saplings of girth up to 30 cm measured at a height of 1 m above ground level and
removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 550 | Sqm | 16.9 ₹9,295 | 16.68 ₹9,174.13 |
| 3.00 | 50.2.33.5
Cutting branches of trees overhanging above any structures of girth between 40cm to
60cm including stacking of serviceable materials and disposal of unserviceable
material, cost of labour, hire charges of rope and pully etc without making any
damages to nearby structures etc complete | 10 | each | 352 ₹3,520 | 346.31 ₹3,463.05 |
| 4.00 | 15.2.1
Demolishing cement concrete manually / by mechanical means including disposal of
material within 50 metres lead as per direction of Engineer - in-Charge.Nominal
concrete 1:3:6 or richer mix (i/c equivalent design mix) | 0.59 | cum | 2,343 ₹1,387.06 | 2,308.02 ₹1,366.35 |
| 5.00 | 15.19
Dismantling steel work manually / by mechanical means in built up sections without
dismembering and stacking within 50 metres lead as per directions of Engineer -in-
Charge. | 200 | Kg | 3.7 ₹740 | 3.66 ₹731.77 |
| 6.00 | 15.7.4
Demolishing brick work manually / by mechanical means including stacking of
serviceable material and disposal of unserviceable material within 50 metres lead as
per direction of Engineer-in-Charge.In cement mortar | 5.76 | cum | 1,983 ₹11,422.08 | 1,953.06 ₹11,249.64 |
| 7.00 | 15.9.2
Demolishing stone rubble masonry manually / by mechanical means including
stacking of serviceable material and disposal of unserviceable material within 50
metres lead as per direction of Engineer -in- Charges:In cement mortar | 5.4 | cum | 2,366 ₹12,776.40 | 2,331.01 ₹12,587.48 |
| 8.00 | OD242899/2025-2026
Dismantling interlock flooring including stacking of serviceable material and
disposal of unserviceable material within 50 metres lead. | 62.2 | sqm | 256 ₹15,923.20 | 252.7 ₹15,717.80 |
| 9.00 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5
m, as directed by Engineer-in-charge.All kinds of soil | 95 | cum | 240 ₹22,800 | 236.25 ₹22,443.44 |
| 10.00 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.All kinds of soil | 109.25 | cum | 335 ₹36,598.08 | 329.86 ₹36,036.90 |
Tender Value
₹16 L
EMD Value
₹40,000
Closing Date
5 Feb 2026, 5:00 pmClosed
Divisional Forest Officer, Palakkad
Kallekulangara
Improvement works for Interlock tiling entrance road and compound wall work in infront of Type-IV staff quarters building at Thanavu under Olavakkode Range during 2025-2026
2026_FD_831596_1
KFDDO/71442/2025/D
Open Tender
Civil Works - Others
90 days
Thanavu-Olavakkode
Please refer tender notice
8 documents required · 8 mandatory
₹5,000
Yes
₹40,000
Yes
24 Feb 2026
29 Jan 2026
7 Feb 2026
29 Jan 2026
5 Feb 2026
29 Jan 2026
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.61 MB
ePayment.pdf
Other Document • 0.01 MB
SCHEDULE.pdf
Tender Documents • 0.69 MB
priliminaryagreement.pdf
Tender Documents • 0.24 MB
BOQ_1397366.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid