Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | L1 | Accepted-AOC agreement executed | |
| 2 | L2₹3.8 L+₹7,149 (1.91%)Rejected-Finance | L2 | Rejected-Finance second bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical Forth lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical Third lowest |
Tender Value
₹4.2 L
EMD Value
₹10,593
Closing Date
9 Mar 2023, 9:00 amClosed
ASSISTANT ENGINEER, LID EW SECTION, PIRAVANTHOOR
ASSISTANT ENGINEER, LID EW SECTION, PIRAVANTHOOR
Construction of compound wall
2023_LSGD_562513_2
04/AE/ETE/LSGD/PVR /2022-23
Open Tender
Civil Works - Buildings
Item Rate
180 days
PIRAVANTHOOR
Please refer Tender documents.
9 documents required · 9 mandatory
₹935
Yes
₹10,593
Yes
1 Jul 2023
2 Mar 2023
10 Mar 2023
2 Mar 2023
9 Mar 2023
2 Mar 2023
Amount
concrete side wall
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
PMS CONSTRACTION
John George
C JOSEPH
Bidder Name
C JOSEPH
PMS CONSTRACTION
John George
THEERTHANA CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_829932.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .