Tender ID
Tender Value
₹13.7 L
EMD Value
₹14,000
Closing Date
19 Feb 2026, 6:00 pmClosed
EXECUTIVE ENGINEER, PANCHAYAT IRRIGATION DIVISION, LUNAWADA
Repair and Maintenance Works for Vada Talav Minor Irrigation Scheme (Part-2) (Canal and related Structures) in Santrampur Taluka of Mahisagar District
273369
15 Of 2025-26
Open
Civil - All
Works
Mahisagar
1 document required · 1 mandatory
₹900
Yes
Executive Engineer, Panchayat Irrigation Division, lunawada
₹14,000
Yes
5 Feb 2026
5 Feb 2026
5 Feb 2026
19 Feb 2026
5 Feb 2026
NAME OF WORK: REPAIR AND MAINTENANCE WORKS FOR VADA TALAV MINOR IRRIGATION SCHEME (PART-2), (CANAL AND
RELATED STRUCTURES), TALUKA: SANTRAMPUR, DIST: MAHISAGAR
Memorandum showing items of work to be carried out
Quantities Estimated Estimated Rates
Item Total amount according
Item Total amount according
but may be more or Item of work In Figure Unit
No. In Words to estimated Quantities
Clearing of Canals for jungle cutting Removing and
destroying the thick "Ghabajaria" ," Panfuti "etc. from the
Thirty Six Thousand Three
1 0.94 Canal/Drain bed under the water pool alongwith rolls incl. 36387.00 Km
Hundred Eighty Seven Rupees
cutting carrying it away as directed and burning the same
etc. complete.(By Machinery) Between 21 to 250 Cusec.
Clearing the silt from the canal/drain bed by a digging the
same to the required bed level and gradient including
depositing the excavated earth regularly in spoil bank for Two Hundred Two Rupees and
utilizing the same preparing the banks after breaking clods Twenty Paise
as and where directed for all leads and lifts. For Canals
Between 21 to 250 Cusec. & 0 to 1.5 m lift.
Dismantalling the C.C. lining including including disposing
3 1014.00 off the dismentalled materials as directed etc. complete. 86.50 Eighty Six Rupees and Fifty Paise Sqmt
(a)7.50 cm thick
Providing & Laying in position "NOMINAL MIX" cement
concrete using cement, sand and crushed aggregate by mass
and machine mix for C.C./R.C.C work incl. necessary
Four Thousand Four Hundred
formworks centering, scaffolding, compaction by vibrator,
4 74.46 4439.50 Thirty Nine Rupees and Fifty Cum
curing as directed with all lead & lift etc complete Without
Dewatering and excluding cost of steel reinforcement. (j)
For Wing wall / Return wall / Head wall / Coping etc. C. C.
Nominal Mix, M-15 and MSA 20 mm
Main canal = 45.60 Cu.m
Pipe Outlet = 2.44 Cu.m
Pipe Culvert = 19.70 + 6.72 = 26.42 Cu.m
Trimming of the canal section manually for preparing sub
grade for laying cement concrete lining in all sorts of soil and Seventy Two Rupees and Eighty
murrum including watering and compacting bed etc. Paise
Providing and laying plain / reinforced cement concrete
lining of Nominal Mix, M-15, (MSA-20 mm) in bed, side
slopes and curvature, including mixing, transporting, placing, Three Hundred Sixty Nine
vibrating, smooth finishing, curing, including dewatering Rupees and Fifty Paise
where required. (MANUALLY WITH CONVENTIONAL MIXER )-
7.5 cm thick lining in bed/slope - with water curing.
Providing groove and filling expansion joint of size 12 mm
wide and 25 mm deep in canal lining during construction Thirty Four Rupees and Seventy
with two coats of primer and filled with bituminious and fine Paise
sand in proportion of 2:1, as directed etc. complete.
Dismantling the existing stone masonry including sorting out
and stacking the useful material and removing the debries Seven Hundred Fifty Rupees and
and making good the damages etc. complete as directed. In Ninety Paise
Providing and fixing in position ( different diameter ) I.S.,NP-
3 class reinforced pipe with caulking the joints with cement
mortar 1:1 proportion,using jute string soaked in cement Six Hundred Seventy One Rupees
slurry, finishing joints and laying pipes to the designed grade and Eighty Paise
and levels, curing etc. complete for all leads and lifts. NP-3
class 300 mm dia pipe.
Main canal = 35.00 Cu.m
Pipe Outlet = 28.00 Cu.m
Excavation of canal in all sorts of soil including soft and hard
murrum including depositing the excavated stuff in uniform
layers in canal banks or as and where directed etc complete One Hundred Nine Rupees and
in varying lead upto 500 m and with all lifts. ( By Machinery) Fifty Paise
CANAL HAVING CAPACITY up to 300 Cusec. Including
Providing & Laying in position "NOMINAL MIX" cement
concrete using cement, sand and crushed aggregate by mass
and machine mix for C.C./R.C.C work incl. necessary
formworks centering, scaffolding, compaction by vibrator, Three Thousand Three Hundred
curing as directed with all lead & lift etc complete Without Forty Six Rupees
Dewatering and excluding cost of steel reinforcement. (A)
For Foundation concrete / General purpose. (a) C. C. Nominal
Mix, M-10 and MSA-40 mm.
Providing & Laying in position "NOMINAL MIX" cement
concrete using cement, sand and crushed aggregate by mass
and machine mix for C.C./R.C.C work incl. necessary
formworks centering, scaffolding, compaction by vibrator, Three Thousand Seven Hundred
curing as directed with all lead & lift etc complete Without Fifty Four Rupees
Dewatering and excluding cost of steel reinforcement. (A)
For Foundation concrete / General purpose. (d) C. C. Nominal
Mix, M-15 and MSA-40 mm.
Main canal = 1.12 Cu.m
Pipe Culvert = 5.76 Cu.m
Quantities Estimated Estimated Rates
Item Total amount according
Item Total amount according
but may be more or Item of work In Figure Unit
No. In Words to estimated Quantities
New / Reparing of steel gate including providing basic steel
One Hundred Twenty Seven
13 4.00 material; M.S. Shaft plate, angles, channels etc. incl. fabriction 127.20 Kg
Rupees and Twenty Paise
transporting to site & erection and painting etc. complete.
Excavation for foundation in all sorts of soil including yellow
sandy gravelly soils ,soft & hard murrum etc. in dry condition
One Hundred Seven Rupees and
14 77.33 including depositing the excavated stuff in uniform layers in 107.80 Cum
banks or as and where directed etc. complete for lead up to
500m and all lift. (BY MACHINERY) Including dewatering.
Sand filling in foundation in between top and bottom plug in Five Hundred Fifty Three Rupees
layers including compacting as directed. and Sixty Paise
Providing and fixing in position ( different diameter ) I.S.,NP-
3 class reinforced pipe with caulking the joints with cement
mortar 1:1 proportion,using jute string soaked in cement Two Thousand Eight Hundred
16 10.00 slurry, finishing joints and laying pipes to the designed grade 2857.70 Fifty Seven Rupees and Seventy Rmt
and levels, curing etc. complete for all leads and lifts. (e) NP- Paise
3 class 900 MM dia pipe.
Providing & Placing in position reinforcement bars
including cutting, bending, welding joints where necessary, Eighty Two Thousand Nineteen
hooking etc. complete as per drawing for all lead and lifts. Rupees
TMT / CRS (FE 500 D)
Total Cost (Rs.)
I/We am/are willing to carry out the work at…............................................................ % above/below percent (Shouldbe written in figures and words) of the
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Contractor Executive Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01_SBD Vada Talav_(Part-2)_28-01-2026.pdf
02_Schedule-A_Vada Talav_(Part-2).pdf
03_Schedule-B_Vada Talav_(Part-2) .pdf
05_Tender Statement of Vada Talav_(Part-2).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .