Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC | L1 | Accepted-AOC L1 accepted | |
| 2 | L2₹12.0 L+₹22,975 (1.95%)Rejected-Finance | L2 | Rejected-Finance L2 hence rejected | |
| 3 | L3₹12.5 L+₹68,925 (5.84%)Rejected-Finance | L3 | Rejected-Finance L3 hence rejected | |
| 4 | L4₹13.0 L+₹1.1 L (9.73%)Rejected-Finance | L4 | Rejected-Finance L4 hence rejected | |
| 5 | L5₹13.1 L+₹1.3 L (11.3%)Rejected-Finance | L5 | Rejected-Finance L5 hence rejected |
Tender Value
₹17.8 L
EMD Value
₹44,600
Closing Date
2 Nov 2019, 5:00 pmClosed
Executive Engineer
Executive Engineer Irrigation Division Ernakulam
Desilting
2019_Irrig_312368_1
37/EE/I/2019-20/S
Open Tender
Civil Works - Others
Item Rate
180 days
Choondanthuruth
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,100
online
₹44,600
Yes
10 Jan 2020
24 Oct 2019
5 Nov 2019
24 Oct 2019
2 Nov 2019
24 Oct 2019
24 Oct 2019 - 2 Nov 2019
Amount
SCHEME 1
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME -2
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 3
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 4
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 5
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 6
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 7
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 8
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 9
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 10
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 11
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 12
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
SCHEME 13
od27140/2019_2020/IA : Earth work excavation by mechanical means over areas (exceeding 30cm depth 1.50m width as well as 10m2 on plan) including disposal of excavated earth to be filled on the banks of canal or as per the direction of departmental officers at site.(under water)
MAS CONSTRUCTIONS
Baby P M
T A JOSEPH
MUHAMMED ALSIFE K S
George Kutty
M.P Salim Pwd Contractor
Bidder Name
M.P Salim Pwd Contractor
T A JOSEPH
George Kutty
MAS CONSTRUCTIONS
P.C TOMY
Baby P M
MUHAMMED ALSIFE K S
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_429830.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .