| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.5 LAccepted-AOC | L1 | Accepted-AOC done | |
| 2 | L2₹87.0 L+₹8.6 L (10.9%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹98.4 L+₹20.0 L (25.4%)Rejected-Finance 86 SECTOR 07 URBAN ESTATE KURUKSHETRA | L3 | Rejected-Finance Rejected |
Tender Value
₹86.1 L
EMD Value
₹1.7 L
Closing Date
14 Jun 2021, 12:00 pmClosed
Xen SYL W.S Division Ambala
Xen SYL W.S Division Ambala
Remodeling of bridges at RD 9900 and 15335 of Ambala Drain
2021_HRY_175000_1
14/06/2021
Open Tender
Civil Works
Item-rate/Agreement basic
240 days
Ambala
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
₹1.7 L
Yes
27 Aug 2021
9 Jun 2021
14 Jun 2021
9 Jun 2021
14 Jun 2021
9 Jun 2021
Amount
Cement Lime Concrete 1:2:9:24, 0.041 cum cement, 0.082 cum lime, 0.37 cum sand and 1.00 cum stone aggrgate, 40 mm nominal size in foundation and plinth
Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. Note :- Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix).upto plinth level M-15 grade plain cement concrete cum ( Cement content considered @ 240kg/cum)
Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note:- 1.Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix. 2. Cement content considered in M-30 is @ 340 kg/cum
Providing and laying in position machine batched and machine mixed design mix M-35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note:- 1.Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix. 2. Cement content considered in M-35 IS @ 350 kg/cum
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level. Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form work for:- Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies complete
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. All kind of soil
Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to all lead and lift including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m. In all kinds of soil Pipes, cables etc for 1200 mm dia 2 lane
Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot & socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, & item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 1200 mm dia pipe
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:2:4 or leaner mix (i/c equivalent cum design mix)
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - incharge.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar
Back filling behind abutment, wing wall and return wall complete as per drawing and MoRT&H Specification Granular Material
Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications
Providing and laying bituminous macadam 50-75 mm thick with Batch type hot mix plant 100-120 TPH using crushed aggregates of specified grading premixed with bituminous binder VG - 30 @3.4% transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction complete as per technical clause 504 of MORT&H specifications Grading II ( 19 mm nominal size)
Providing and laying 50mm - 75 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade.
Removing hume pipes- NP 3 including excavation and taking out the pipes manually/ by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge above 600 mm dia
Credit of NP-3 1200 mm dia pipe
Credit of old brick work
Credit of old slab reinforcement
Jai Bhagwan Sharma Contractor
Krishna Construction Co
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .