Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC | L1 | Accepted-AOC lowest bidd | |
| 2 | Rejected-Technical KOTTUR KERALA | - | Rejected-Technical L3 | |
| 3 | Rejected-Technical | - | Rejected-Technical L4 | |
| 4 | Rejected-Technical | - | Rejected-Technical L5 | |
| 5 | Rejected-Technical NOCHCHAD GRAMA PANCHAYAT KOYILANDI TALUK KOZHIKODE DISTRICT KERALA | - | Rejected-Technical L2 |
Tender Value
₹8.5 L
EMD Value
₹21,171
Closing Date
1 Aug 2023, 4:00 pmClosed
block development officer
Block deve.office,balussery block panchayath
Re - etender - MLA-SDF-Construction of Vakayad Skeerolpadhaka Sahakarana Sankam Building - Kottur Grama Panchayath- balussery block panchayath-work pro.by sri . sachin dev MLAGeneral Civil Work - RE TENDER
2023_CRD_587870_1
02/2023/24/BDO/ET/BLY
Open Tender
Civil Works - Buildings
Item Rate
180 days
kottur gp, balussery BP
please refer tender documents
11 documents required · 11 mandatory
₹1,870
Yes
₹21,171
Yes
16 Oct 2023
24 Jul 2023
3 Aug 2023
24 Jul 2023
1 Aug 2023
24 Jul 2023
Amount
Building construction
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD354283/2022-2023:Roofing with GI trafforded sheets .35mm thick or nearest available thickness powder coated with over lap of 150mm at ends and GI hook or crank CI bolts and nuts including plain washers and bitumen washers etc complete
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
VK SAJU
BIJU. TV.
SASINDRAN. T.K.
SIJITH P K
Bidder Name
VK SAJU
SIJITH P K
SUNIL KUMAR VK
BIJU. TV.
SASINDRAN. T.K.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_869174.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .