Tender Value
₹75.6 L
EMD Value
₹75,700
Closing Date
22 Apr 2026, 3:30 pmClosed
SE R&B CUDDAPAH
Maruthinagar
Widening of road from Rajeev marg Road Junction of RS road to Mahaveer Circle 19th division Kadapa Municipal corporation and paver blocks infront of Gandhi nagar school (PF Off road) " Road from Venkateswara theatre to Industrial estate (via) Collecto's Bungalow from Km 0/600 - 1/0)"
920907
NIT No: 23 / SE R&B / KDP / TO / 2025-26, Dated: 02.04.2026 ( 2nd Call) of Superintending Engineer (R&B) Kadapa
OPEN - NCB
Similar Work
YSR
18 documents required · 18 mandatory
₹2,677
₹75,700
8 Apr 2026
8 Apr 2026
8 Apr 2026
Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines , grades and cross sections etc., complete for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge
Construction of Granular sub-base by providing HBG material confirming to Grading - V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.
Providing and applying prime coat with bitumen emulsion (SS1) Bulk using emulsion pressure distributor on prepared surface of granular base including clearing of road surface and spraying emulsion at the rate of 0.70 kg/sqm using emulsion pressure distributor for finished item of work etc., complete as per MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-charge
Providing and applying tack coat with bitumen VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.25 kgs per sqm on the prepared Granular surface treated with primer cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
Providing and applying tack coat with bitumen VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
Providing and laying of 50mm thick Bituminous Macadam with 100 -120 TPH hot mix plant producing an average output of 75 tonnes per hour using hard blasted Dolomite crushed aggregates of Grading - II as per table 500-7 of MoRT&H specificaion 504 (5th Revision) premixed with bituminous binder of VG-30 grade @ 3.4 % by weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and opeational charges all T&P and all other contingent charges necessary , complete and as per MoRTH specification No. 504 (5th Revision) .
Providing and applying tack coat with bitumen VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
Providing and laying of 30 mm thick Bituminous Concrete with 100 - 120 TPH batch type hot mix plant producing an average output of 75 tones per hour using hard blasted dolomite crushed aggregates of Grading – II as per Table 500-17 of specification 507 of MoRT&H (5th revision), premixed with Bituminous binder of VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge
Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines , grades and cross sections etc., complete for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge
Construction of Granular sub-base by providing HBG material confirming to Grading - V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.
Sand filling in foundation including cost and conveyence of all materials to site and watering, tamping etc., complete for finshed item of work as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer - in - Charge.
Providing and layiang of interlocking concrete block pavements using M.40 having thickness 80 mm of approved shade design etc., laid oversand bed of 30 mm thick using 12 mm thick and down size HBT crushed metal for manufacute of blocks approved by the departmental and of approved size & Shape of dumbell zigzag, I - block or any other shape approved by the department., over sand bed of 50 mm average thickness a nd compacting with vibrating palte compactor having 3 tone, compacting force there by forcing part of sand underneath to come up in between joins final comp;action of paver surface to be done after spreading and brushing the fine sand into joints to its final level. the work includes cost of all materials such as cutting machine, lift, loading and unloading to work site clearing, bringing required for the successful completion of work as per for Inter locking Flooring Tiles.
Dismantling of existing structures like culverts , bridges, retaining walls and other structures comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m ( By Mechanical means in Cement concrete grade M-15 & M-20) as per MoRTH specification 202 , 2.4 II (A) (5th revision)
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work, excluding seigniorage charges, as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer-in-Charge
Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for foundation.
Providing Vibrated Cement Concrete (1:3:6) using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200 (5th Revision) and as directed by the Engineer-in-Charge for Body walls.
Providing, laying Reinforced cement concrete Hume pipes of 1000 mm Dia., NP-4 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.
Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th Revision) and as directed by the Engineer-in-Charge for C.C Pavement.
Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for Cover slabs over side drains
Providing HYSD bars ( Fe-415 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
Supply of hot applied thermoplastic road making compound,2.5mm thick including reflectorising glass @ 35Cgms with Reflectorising Glass Beads on Bituminous Surface at 250 grms per sqm area,thickness of 2.5mm is exclusion of surface applied glass bead as per IRC:35,the material should be of BERGER Company BERDER Equtvalent and most comply with the folloing: (A) White index for the product should be in the range of 60-70 when measured against standred refernce.The applied panel 7/8 number must be submitted for chacking up the white index in the department lab.In case the department approves the white index of any vendor,the department engineer may carryout ramdom checking of the applied products at site against the approved panel.In case of any major deviation,beyond acceptance limit,department reserve the right to cancel or reject the total supplied consignment of the side material and will compel the vendor has to replace the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department).(B) Laniance factor of the material should be in the range of 80-85% at 45 degree centigrade as per AASTHOM 249. (C) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS 3262, Part-1, 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade. (D) Adhesion: Strong (E) Softening point: 102 degree centigrade (F) Dried film finish: Smooth and uniform (G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 1641961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35-1997.
Supply & Fixing of Molded Shanks Raised Pavement Markers made of plastic body moulded froim HIPS (HI-impact polysterence) or ABS or ASA ( Acrylic strene Acrylonitrite and reflective panels with micro prismatidc lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 Kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Caterory A of MORTH Circular No.RW/NH/33023/10-97 - DO III Dt.11.06.1997.The height width and length shall not exceed 50 mm,100 mm, and 100 mm and with minimum reflective area of 13 Sqm on each side an the slope to the base shall be 35 +/- 5 degree.The strength of detachment of the integrated cylindrical shanks.(of diameter not less than 19 +/- 2 mm and height not less than 30 +/- 2 mm) from the body is to be a minimum value of 700Kgs. Fixing will be by drilling holes on the road for the twin shanks to go inside,without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the Engineer.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT 23 2025-26 BOQ_ Rajv marg to mahaveer Circle.xlsx
TENDER_DOCUMENT • 0.81 MB
NIT 23 DTS Rajiv marg to Mahaveer Circle.doc
TENDER_DOCUMENT • 1.21 MB
Download all tender documents and submit your bid