| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC | ₹11.5 L Quoted ₹12.6 L | L1 | Accepted-AOC AFTER NEGOTIATION, THE PARTY WILL AGREE TO REDUCE RS.100000/- FROM THE QUOTED RATE |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
4 Jun 2022, 6:00 pmClosed
MANAGING DIRECTOR
KCMMF LTD MILMA BHAVAN PATTOM PALACE P O TRIVANDRUM
RECTIFICATION OF THE DEFECTS ON CATTLE FEED MANUFACTURING EQUIPMENTS AT CATTLE FEED PLANT, MALAMPUZHA, PALAKKAD DIST.
2022_KCMMF_492277_1
KCMMF/ KHO/ PROJ (406 )/2022
Open Tender
Repair and Maintenance Works
Item Rate
60 days
CATTLE FEED PLANT MALAMPUZHA PALAKKAD DIST
AS INDICATED IN THE TENDER BOOK
4 documents required · 4 mandatory
₹2,950
₹10,000
8 Aug 2022
27 May 2022
6 Jun 2022
28 May 2022
4 Jun 2022
28 May 2022
28 May 2022 - 4 Jun 2022
Installation of Batch Mixer rotor shaft with complete assembly. (Work included dismantling the existing damaged rotor shaft, end bearings, bearing blocks etc from the existing mixer and reassembling it with a new one rotor shaft after fixing ribs and supporting rods of the rotor on the shaft. Rotor to be reassembled with new bearings and bearing blocks. Necessary manhole to be provided on the batch mixer body for entry of fabricator inside the mixer. Batch mixer rotor shaft, Bearings, Plummer block, New shaft, Rotor ribs ,Rod etc will provide from CFP, Malampuzha.
Pellet cooler blower out let dust Arresting:- Do necessary modifications in pellet cooler blower cyclone Airlock and its piping. Or Install additional cyclone air lock of size 700 MM with required no of bends, Elbow of 16 gauge stainless steel: and Gravity piping. The necessary materials for completing the work are also covers under the scope of supply of the contractor.
Rectification of weight variation in weigh hopper three:- Frequent weight variation is noticed in the weigh hopper -3. it is mainly due to erection problem of weigh hopper- 3.It is to be rectified by necessary modification work included disconnecting and re assembling the existing gravity pipe from Batch conveyor 2and Batch conveyor 3.or necessary modification in the weigh hopper-3 The necessary materials for completing the work are also covers under the scope of supply of the contractor.
Leakage arresting of conveyor and elevator:- prevent dust come out from the discharge end of elevators and Chain conveyors. Rectification work included enlarges the size of conveyor end trough and connecting chute by using ms sheet and channels. The necessary materials for completing the work are also covers under the scope of supply of the contractor.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .