| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹90.0 LAccepted-AOC | ₹90.0 L | L-1 | Accepted-AOC ACCEPTED BEING ELIGIBLE L1 BIDDER AND ACCEPTABLE RATE. |
| 2 | L-2₹1.2 Cr+₹26.5 L (29.4%)Rejected-Finance WZ 49 20 B VIKASPURI VIKASPURI NEW DELHI WEST DELHI DELHI 110018 UDYAM DL 08 0028655 07AASCA1900E1ZZ R M MII STATUS AS VERIFIED | WEST DELHI | DELHI | 110018 | ₹1.2 Cr+₹26.5 L (29.4%) | L-2 | Rejected-Finance NOT ACCEPTED NOT BEING L1 BIDDER. |
| 3 | Rejected-Technical | - | - | Rejected-Technical Did not Comply the Technical Eligibility Criteria as per NIT. Hence failed to fulfill the eligibility criteria of the Technical Evaluation. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Neither Complied the Technical Eligibility Criteria as per NIT nor Bid Validity Extended. Hence failed to fulfill the eligibility criteria of the Technical Evaluation. |
Tender Value
₹1.2 Cr
EMD Value
₹1.5 L
Closing Date
27 May 2023, 5:00 pmClosed
STAFF OFFICER (CIVIL), HASDEO AREA, SECL
OFFICE OF THE STAFF OFFICER (CIVIL), HASDEO AREA, GM OFFICE, SOUTH JHAGRAKHAND COLLIERY, DISTT.- MANENDRAGARH- CHIRMIRI-BHARATPUR (C.G.)-497 448. CONTACT No. 7587390016/7587390019/7587390063, email- so12civilhsd(at)gmail.com
Surveying, designing, construction, installation, testing, commissioning, trial run and running operation and maintenance for 5 years with appropriate sewage treatment plant (STP) of 50 KLD Capacity including sewage network for CHM..on Turnkey Basis.
2023_SECL_277974_1
GM/HSD/C/e-Tender/23-24/11 Date 27.04.2023
Turnkey
Civil Works - Others
Item Rate
2190 days
CHM OF HASDEO AREA DISTT.- M-C-B (C.G.)
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.5 L
OFFICE OF THE STAFF OFFICER (CIVIL), HASDEO AREA
15 Feb 2024
28 Apr 2023
29 May 2023
28 Apr 2023
27 May 2023
4 May 2023
28 Apr 2023 - 19 May 2023
2 May 2023
Amount
Survey, Planning, Designing, providing, constructing, hydraulic testing, commissioning and giving satisfactory trials of Cyclic Activated Sludge Process Based (CASP) on Sequencing Batch Reactor (SBR) Technology, STP consisting of Raw Sewage Sump, Sump Pump House, Plant Room, Screen Chamber, Grit Chamber, Inlet cum Equalization Tank, Aeration Tank (SBR), Disinfection Tank, Sludge Sump and other Miscellaneous Civil works with necessary piping work including required valves, gates, drains, pathways etc. complete as Turnkey Job with all involved Civil, Electrical and Mechanical works inclusive of following items, units as per specifications for Civil, Electrical and Mechanical components with all duties and taxes etc. complete to achieve pH around 7.0, COD <50 mg/l, BOD <10 mg/l, Suspended Solids <10 mg/l, Fecal Coliform <1000 MPN/100ml. All structural steel works/ fabrications are to be provided, with application of hot dip zinc coating according to specifications as per IS 4759: 1996 (Reaffirmed 2006)
SEWERAGE SYSTEM/ SEWER NETWORK : Surveying, designing, constructing and commissioning of the sewarage system/ sewerage network for the complete colony for discharging the sewage to the STP consisting of the sewerage network of RCC pipe NP-2 class of suitable dia of length 2863 mtrs approx as per the design including all necessary connections (including from buildings to the Sewer Network with necessary modifications/ traps, if any, as per requirement) and related jobs, pumping stations etc. as required including all complete items/ works as per scope of work (including cost of RCC/ Brickwork Manholes and Chambers as per requirment of site and scope of work). (Note: Payment shall be made/ deducted on pro-rata basis against increase and decrease in length of Sewer network as specified)
Construction of Boundary wall all around the STP with RCC column and column footing suitably spaced as per Design, plinth beam and coping beam of RCC M-20 grade and brick work with fly ash bricks of approved quality in cement mortar 1:6 including plastering finishing, main gate of structural steel of suitable size, priming, painting etc. all complete (Total length 200.00 mtrs approx) as per detailed design and scope of work. (Note: Payment shall be made/ deducted on pro-rata basis against increase and decrease in length of Boundary wall as specified)
OPERATION & MAINTENANCE : Operation and Maintennace of STP for 5 five years (Total 60 calender Months) after completion of construction of STP, Trial Run and commissioning of STP (including the required chemicals, man power T&P, spares, flushing of sewer network once in every three months etc. including disposal of sludge to the nearest location, all complete as per the instructions of the Engr-In-Charge)
Total impact of GST for the purpose of CTC
AWETECH WORKS PVT LTD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .