| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.6 LAccepted-AOC | 1 | Accepted-AOC first lowest | |
| 2 | 2₹31.3 L+₹8.8 L (38.9%)Rejected-AOC | 2 | Rejected-AOC second lowest |
| Sl No | Description | Qty | Unit | Sajikumar K L1 | P BAHULEYAN L2 |
|---|---|---|---|---|---|
| 1.00Appendix A- AC Pipe leakages | |||||
| 1.00 | 100.46.1.1:Repairing leakage/breakage of 80mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | 1 | no | 3,600 ₹3,600 Lowest | 3,800 ₹3,800 |
| 1.00 | 100.46.1.3:Repairing leakage/breakage of 125mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | 1 | no | 4,277 ₹4,277 Lowest | 4,500 ₹4,500 |
| 1.00 | 100.46.1.4:Repairing leakage/breakage of 150mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | 3 | no | 5,170 ₹15,510 Lowest | 5,500 ₹16,500 |
| 1.00 | 100.46.1.7:Repairing leakage/breakage of 225mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | 3 | no | 6,647 ₹19,941 Lowest | 6,800 ₹20,400 |
| 1.00 | 100.46.2.1:Repairing leakage/breakage of 80mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | 1 | no | 4,500 ₹4,500 Lowest | 5,000 ₹5,000 |
| 1.01 | 100.46.2.3:Repairing leakage/breakage of 125mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | 1 | no | 5,500 ₹5,500 Lowest | 6,000 ₹6,000 |
| 1.01 | 100.46.2.4:Repairing leakage/breakage of 150mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | 5 | no | 6,951 ₹34,755 Lowest | 8,000 ₹40,000 |
| 1.01 | 100.46.2.7:Repairing leakage/breakage of 225mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | 5 | no | 8,709 ₹43,545 Lowest | 10,000 ₹50,000 |
| 1.01 | 100.46.3.1:Repairing leakage/breakage of 80mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 3.0m up to 5.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints. | 1 | no | 6,600 ₹6,600 Lowest | 7,500 ₹7,500 |
Tender Value
₹20.5 L
EMD Value
₹50,000
Closing Date
23 Jul 2025, 2:00 pmClosed
Executive Engineer
WS Division NTA
Oand M - Water Supply Schemes-CWSS to Kalipara and RWSS to Parassala - Parassala Panchayath Zone 1-Rectification of Leakages in various pipe line and allied works for one year 2025-26 pipe line work-Pipeline Wor
2025_KWA_775814_1
08/9868/20 25_26_1_1
Open Tender
Civil Works - Water Works
Item Wise
365 days
Neyyattinkara
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
₹50,000
Yes
26 Aug 2025
16 Jul 2025
26 Jul 2025
16 Jul 2025
23 Jul 2025
16 Jul 2025
Amount
Appendix A- AC Pipe leakages
100.46.1.1:Repairing leakage/breakage of 80mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.1.3:Repairing leakage/breakage of 125mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.1.4:Repairing leakage/breakage of 150mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.1.7:Repairing leakage/breakage of 225mm A.C. pipeline by cutting and dismantling the damaged pipe portion (up to 1.5m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.2.1:Repairing leakage/breakage of 80mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.2.3:Repairing leakage/breakage of 125mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.2.4:Repairing leakage/breakage of 150mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.2.7:Repairing leakage/breakage of 225mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 1.5m up to 3.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.3.1:Repairing leakage/breakage of 80mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 3.0m up to 5.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.3.3:Repairing leakage/breakage of 125mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 3.0m up to 5.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.3.4:Repairing leakage/breakage of 150mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 3.0m up to 5.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
100.46.3.7:Repairing leakage/breakage of 225mm A.C. pipeline by cutting and dismantling the damaged pipe portion (above 3.0m up to 5.0m) including charges for earthwork excavation in all kinds of soil including tar / concrete cutting for exposing leak portion of the pipe, operating control valves if any, conveying to the site and cutting new A.C. pipe to the required length, re-jointing the pipeline using C.I.D. Joints, testing the pipeline by operating the valves concerned, and rectifying the defects any noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers excluding the cost of pipe and C.I.D. Joints.
Appendix B- PVC Pipe leakages
OD20049/2025-2026:Leak rectification work in 15/20/25mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.1:Leak rectification work in 32mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.2:Leak rectification work in 40mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.3:Leak rectification work in 50mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.4:Leak rectification work in 63mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.5:Leak rectification work in 75mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.1.6:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the remaining portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe to the site, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or any available joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and without causing any damages to the existing utilities and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, watching, ribbon fencing, traffic controlling etc., complete as per the direction of Departmental officers including the cost of pipe and uPVC specials; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: All Socketed Jointing.
100.47.2.1:Leak rectification work in 90mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
100.47.2.2:Leak rectification work in 110mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
100.47.2.3:Leak rectification work in 140mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
100.47.2.4:Leak rectification work in 160mm uPVC (Class 2 to 6) pipeline including detecting and locating leak, earth work excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, cutting the pipe diametrically perpendicular to the axis of pipeline without causing any damages to the balance portion, dismantling and lifting the pipe from trenches, smoothening the cut ends, conveying the new pipe, cutting and lowering new pipe into the trenches, placing in position, aligning the pipe to line and level and jointing the new pipe with the existing pipe with solvent cement or repairable joint and testing the pipeline by operating the valves concerned, and rectifying the defects if noticed and refilling the trenches in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, charges for removing surplus soil from work site, without causing any damages to the existing utilities, including hire for tools and plant, conveyance of tools and materials, bailing out water, providing caution boards, lighting, ribbon fencing, watching, traffic control etc., complete as per the direction of Departmental officers, including the cost of pipe & specials but excluding the cost of C.I.R. Joints; uPVC Pipes and specials shall be of good quality and conforming to relevant standards: Socket & C.I.R. Jointing.
Appendix C- CI Pipe leakages
100.48.2.3:Rectification of minor joint leakages in 125mm C.I. Pipe including earthwork excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc., complete.
100.48.2.4:Rectification of minor joint leakages in 150mm C.I. Pipe including earthwork excavation in all kinds of soil for exposing leaking joint including tar cutting / concrete cutting, without causing any damages to the line and specials, cleaning the joints including raking out the damaged lead wool, conveying and inserting hemp and lead wool and caulking after cleaning the ends, charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of conveyance and hire for tools and plant, bailing out water, lighting, watching, ribbon fencing, providing caution boards, traffic diversion, including cost of materials and as per the direction of departmental officers etc., complete.
Appendix D- GI Pipe leakages
OD7879/2025-2026:Rectification of leakages of 15mm, 20mm & 25mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials including cost of pipe and specials and as per the direction of departmental officers etc. complete.
100.50.1.1:Rectification of leakages of 32mm, 40mm & 50mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
100.50.1.2:Rectification of leakages of 65mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
100.50.1.3:Rectification of leakages of 80mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
100.50.1.4:Rectification of leakages of 100mm G.I. Pipes by replacing lengths up to 1.0m including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar / concrete cutting, by cutting, removing and stacking the damaged portion from the existing line without causing any damages to the remaining portion and specials and conveying and replacing with G.I. Pipes of suitable size and jointing by thraded coupler and union of suitable size including threading, alignment, laying and jointing to make a water tight joint, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges hire and conveyance of tools, plant and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including the cost of specials but excluding cost of pipe and as per the direction of departmental officers etc., complete.
Appendix E- DI Pipe Leakages
100.49.1.3:Rectification of joint leakages in 200mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete.
100.49.1.4:Rectification of joint leakages in 250mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete.
100.49.1.5:Rectification of joint leakages in 300mm D.I. Pipe (cutting, removing and laying back a length of 1.0m from one side of the joint) including earthwork excavation in all kinds of soil for exposing leak portion of the pipe including tar cutting / concrete cutting, by cutting and removing a portion of pipe from the damaged joint without causing any damages to the remaining portion of the line and specials and replacing the pipe with mechanical and tyton joint after cleaning the ends, centering the pipe, providing the joints, testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of mechanical joint and as per the direction of departmental officers etc., complete.
Appendix F- Public Tap leakages
100.56.1:Supplying and fixing 15 / 20 mm PVC public tap after dismantling the damaged tap including all cost of materials, labour charges, hire for tools and as per the direction of the department officers etc complete.
100.57.1:Rectifying the leakages in boring point of public tap connection including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.
100.58.1:Rectifying the leakages in vertical pipe of public tap connection including earth work excavation in all kinds of soil for exposing the pipeline including concrete / tar cutting, cutting and removing damaged portion of pipe, fixing new 20/25 mm GI pipe and specials in place of damaged portion of pipe and connecting with existing pipe line, testing the line to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and specials and as per the direction of departmental officers etc. complete.
OD7605/2025-2026:Vertical pipe of public tap connection and plugging in vertical pipe including cost of pipe and specials and as per the direction of departmental officers etc. complete.
OD7604/2025-2026:Boring point of public tap connection and plugging the connection at Boring point including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.
Appendix G- Supply of Materials
100.98.23:Supply of PVC Coupling 90mm, 8 kg/cm2.
100.98.24:PVC Coupling 110mm, 8 kg/cm2.
100.98.25:Supply of PVC Coupling 140mm, 8 kg/cm2.
100.98.26:Supply of PVC Coupling 160mm, 8 kg/cm2.
100.98.29:Supply of PVC Coupling 250mm, 8 kg/cm2.
100.98.236:Supply of PVC Pipe, 10kg/cm2, 90mm Dia.
100.98.237:Supply of PVC Pipe, 10kg/cm2, 110mm Dia.
100.98.238:Supply PVC Pipe, 10kg/cm2, 140mm Dia.
100.98.239:Supply of PVC Pipe, 10kg/cm2, 160mm Dia.
OD7619/2025-2026:Supplying 250mm pvc pipe 10kg/cm2
OD7613/2025-2026:Supplying 90 mm CIR joint
OD7620/2025-2026:Supplying 110 mm CIR joint all class
OD7615/2025-2026:Supplying 140 mm CIR joint all class
OD7616/2025-2026:Supplying 100 mm CID joint all class
OD7617/2025-2026:Supplying 80 mm CID all classes
OD7614/2025-2026:Supplying 225 mm CID all classes
OD7621/2025-2026:Supplying 125 mm CID all classes
OD7618/2025-2026:Supplying 150 mm CID joint all class
Appendix H- Valve Controlling
100.98.1008:Engaging Coolie.
Appendix I- Miscellaneous Items
100.53.1.a:Washing OHSR/GLSR using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materials away from the immediate premises and within the initial lead of 50m from the periphery of the tank, without causing any damage to the existing structure and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete.
100.53.2:Washing Clarifloculator using brooms, brushes and bleaching powder by engaging coolies, scrubbing twice, washing and cleaning using fresh water, including side wall, floor slab and columns, disposing the the slurry / waste materials away from the immediate premises and within the initial lead of 50m from the periphery of the clari floculator, without causing any damage to the existing structure and installations, charges including the operation of valves, conveyance and hire charges of tools and as per the direction of the department officers etc. complete.
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.41.39:Supply, stacking, spreading and consolidating of Quarry Muck in the trench of pipe line, including carriage, loading, unloading & stacking up to any lead.
100.41.40:Supply, stacking, spreading and consolidating of Red earth in the trench of pipe line for cushion including carriage, loading, unloading & stacking up to any lead.
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge.
OD7606/2025-2026:Demolishing the existing RR masonry for the rectification of leakages if necessary and reconstruction of the same in C.M. 1:6 after the rectification work including cost of cement etc complete.
OD20311/2025-2026:Demolishing wetmix manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge.
OD7607/2025-2026:Rectification the leakage in various size of valves in the distribution line and pumping main including hire for tools etc. complete including cost of specials.
OD7610/2025-2026:Charges for dismantling 65 mm 125 mm CI valve, lock nut, spindle, shutter, welding the shutter increasing the thickness of the spindle suitable for the valve and making new lock nut and charges for lath work and resetting the same in correct position etc complete.
OD7608/2025-2026:Charges for dismantling 150 mm 350 mm CI valve, lock nut, spindle, shutter, welding the shutter increasing the thickness of the spindle suitable for the valve and making new lock nut and charges for lathwork and resetting the same in correct position etc complete
OD7609/2025-2026:Charges for cleaning valve chamber and protection tube after dismantling the heavy type RCC cover slab and disposing the slushy soil 50 mt away from the chamber
OD7611/2025-2026:Rectifying the leakages in boring point of consumer service connection/Disconnected connection in in all classes and all sizes of AC/GI/CI/DI pipes and 75 mm and above PVC pipes of all classes including earth work excavation in all kinds of soil for exposing the boring point including concrete / tar cutting, dismantling the damaged saddle piece,cutting and removing damaged portion of pipe line,fixing new saddle piece,laying 20/25 mm PVC 10Kg/cm2 pipe in place of damaged portion of pipe and connecting with existing pipe line,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
100.59.3:Restoring the road surfaces by providing and laying factory made cold bitumen-aggregate pot-hole repair mix in two layers of 25mm thick (total 50mm thick), by cleaning the surface with brooms etc. to remove dust/debris/water etc, placing the premix, compacting properly with hand-rammer etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites.
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
16.84:Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.)
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
100.98.1008:Engaging Coolie.
100.98.1009:Engaging Fitter ( grade 1).
P BAHULEYAN (BID ID -2259696)
Bidder Name
P BAHULEYAN
Sajikumar K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1268191.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .