| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Fee/PreQual/Technical/Finance | ₹2.9 Cr | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.9 CrAdmitted-Fee/PreQual/Technical/Finance | ₹2.9 Cr | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | DIL M GOVIND L1 | Naseer.K.M L2 |
|---|---|---|---|---|---|
| 1.00Appendix I A-Working charges | |||||
| 1.00 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 3,800 | metre | 27 ₹1,02,600 Lowest | 28 ₹1,06,400 |
| 1.00 | OD270482/2025-2026:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 1,260 | sqm | 106 ₹1,33,560 | 105 ₹1,32,300 Lowest |
| 1.00 | OD270705/2025-2026:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 189 | cum | 930 ₹1,75,770 Lowest | 1,500 ₹2,83,500 |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 2,683.8 | cum | 700 ₹18,78,660 Lowest | 750 ₹20,12,850 |
| 1.00 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | 958.5 | cum | 1,100 ₹10,54,350 Lowest | 1,200 ₹11,50,200 |
| 1.01 | 100.2.7:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited. | 115.02 | cum | 1,500 ₹1,72,530 Lowest | 1,650 ₹1,89,783 |
| 1.01 | 100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited. | 76.68 | cum | 1,800 ₹1,38,024 Lowest | 1,900 ₹1,45,692 |
| 1.01 | 100.99.1:Add extra for the rate of Earth Work Excavation to account for the difficulty of excavation and the idling of the labour / machinery. | 135 | cum | 300 ₹40,500 Lowest | 350 ₹47,250 |
| 1.01 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 2,000 | metre | 32 ₹64,000 Lowest | 32 ₹64,000 Lowest |
Tender Value
₹2.7 Cr
EMD Value
₹1 L
Closing Date
18 Aug 2026, 3:00 pmClosed
Superintending Engineer
PH CIRCLE, KWA, MALAPPURAM
State Plan-2025-26-UWSS to Manjeri-Replacing old 250mm CI pumping main from Anakkayam clear water pump house to kunnath Ambalam tank.-Pipeline Work
2026_KWA_864568_1
SE/PHC/MPM/RE-10/2026-27
Open Tender
Civil Works - Water Works
Item Rate
270 days
MANJERI
Refer Tender Documents
4 documents required · 4 mandatory
₹8,270
₹1 L
19 Aug 2026
6 Aug 2026
19 Aug 2026
6 Aug 2026
18 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix I A-Working charges | |||||
| 1.001 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | - | metre | - | - |
| 1.002 | OD270482/2025-2026:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | - | sqm | - | - |
| 1.003 | OD270705/2025-2026:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 1.004 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | - | cum | - | - |
| 1.005 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | - | cum | - | - |
| 1.006 | 100.2.7:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited. | 1 | cum | - | - |
| 1.007 | 100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited. | - | cum | - | - |
| 1.008 | 100.99.1:Add extra for the rate of Earth Work Excavation to account for the difficulty of excavation and the idling of the labour / machinery. | - | cum | - | - |
| 1.009 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | - | metre | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Form83_merged.pdf
Tender Documents • 8.46 MB
BOQ_1462863.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].