| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 CrAccepted-AOC | ₹17.6 Cr Quoted ₹17.9 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹18.2 CrRejected-AOC | ₹18.2 Cr | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹18.7 CrRejected-AOC | ₹18.7 Cr | L3 | Rejected-AOC Third Lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| 5 | Rejected-Technical 35 WARD NO 02 ISLAMNAGAR DISTT BUDAUN | BUDAUN | UTTAR PRADESH | 110025 | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹18.3 Cr
EMD Value
₹36.5 L
Closing Date
7 Mar 2024, 3:00 pmClosed
SE Rampur Circle PWD Rampur
Office of SE Rampur Circle PWD Rampur
Widening and strengthening of Kiratpur Nagina Harewali Sherkot MDR-171W Kiratpur to Akbarabad Km 1 to 10 from 3.75 mtr to 7 mtr including 05 year maintenance
2024_CEMBD_906165_2
494/E-Nivida-R.Circle/23-24 Dt. 31.01.2024
Open Tender
Civil Works - Roads
365 days
Najibabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹36.5 L
Office of SE Rampur Circle PWD Rampur
18 Mar 2024
27 Feb 2024
7 Mar 2024
27 Feb 2024
7 Mar 2024
27 Feb 2024
29 Feb 2024
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (MORT&H Specification No. 301 (3.6))
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 as per Morth Speciification 305 (3.17)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per Morth Speciification 305 (3.16)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Cl. 406
Providing, laying, spreading and compacting graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC Cement and 3.5% Emulsion in uniform single layer on sub- base/sub-grade and compacting with Road roller to achieve the desired density.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and applying tack coat with bitumen using Bitumen pressure distributor at the rate of 0.30kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per Morth Speciification 503 For BC
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 using batching plant transit mixer & manual placing
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
Plain/Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical Specifications. RCC Grade M30 using batching plant transit mixer & Concrete pump
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
Supplying, laying and jointing of 1000 mm dia NP-3 R.C.C. hume pipe confirming to I.S.-458 for culvert, including jointing ends, fixing collars with cement mortar of cement and coarse sand in ratio 1:2 including cost of all material, laying pipe in position to required grade and slope, labour and T&P etc. required for proper completion of work.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres
Supplying, laying and jointing of 600 mm dia NP-3 R.C.C. hume pipe confirming to I.S.-458 for culvert, including jointing ends, fixing collars with cement mortar of cement and coarse sand in ratio 1:2 including cost of all material, laying pipe in position to required grade and slope, labour and T&P etc. required for proper completion of work.
Supplying, laying and jointing of 900 mm dia NP-3 R.C.C. hume pipe confirming to I.S.-458 for culvert, including jointing ends, fixing collars with cement mortar of cement and coarse sand in ratio 1:2 including cost of all material, laying pipe in position to required grade and slope, labour and T&P etc. required for proper completion of work.
Routine Maintenance of road after completion work (A) Carriageway/Pavement: (a) Potholes,cracks,other surface defects (SWMM & BC), (b) Repair of Edges, Rutting (BC). (B) Road, Embankment, Cuttings, Shoulders, Trees & Plantation: (a) Roads Maintained free of edge drop, inadequate cross fall, undulations, settlement, Ponding (E/W), (b) Deficient slopes, rain cuts in embankments (E/W), (c) Vegetation growth, Loping of tree branches. (C) Bridges and Culverts: (a) De-silting, (b) Clearing vegetation growth (Jungle Clearance), (c) Damaged/disturbed boulder pitching, breast /toe wall retaining wall, apron flooring , guide bunds (Boulder Apron), (d) Parapet, any damage to foundations, (e) Any defects in sub-structures, (f) Any defects in superstructures, raillings, parapets., (g) wearing coat, (h) Approach slab, (i) Painting & lettering of No. plates, repairs. (D) Repair of Roadside Drains: (a) Brick Work in 1:4, (b) Plaster, (c) CC-1:2:4. (E) Road Furniture: (a) Cleaning, Painting & lettering of stones & sign boards, Replacement of damaged/ missing stones & sign boards., (b) 200 m stones, (c) Km stones, (d) 5th km stones,. Maintenance requirement as per above and Mentioned in Special Conditions of Contract for Maintenance. Payment of Maintenance work as Percentage of final Civil Construction Cost. For Ist Year @ 0.00 %
For Ist Year @ 0.00 %
For IInd Year @ 0.25 %
For IIIrd Year @ 0.50 %
For IVth Year @ 0.75 %
For Vth Year @ 1.00 %
Shri Krishna And Company
Raj Shyama Constructions Pvt. Ltd.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf